Loading...
2023-014427 ~ 8900 SW Burnham St Washington County,Oregon 2023-014427 D-E Stn=11 C WHITE 04/11/2023 12:41:01 PM $45.00$11.00$5.00$60.00 $121.00 AFTER RECORDING RETURN TO: I,Joe Nelson,Director of Assessment and Taxation and Ex-Officio Clof Tid County Clerk for Washington County,Oregon,do hereby certify that �Jganthe within instrument of writing was received and recorded in the 13125 SW Hall Blvd. book of records of said county. Joe Nelson, Director of Assessment and Tigard, OR 97223 Taxation, Ex-Officio County Clerk UNTIL A CHANGE IS REQUESTED SEND TAX STATEMENTS TO: No Change • This space is reserved for recorder's use. PUBLIC TRAIL EASEMENT For good and valuable consideration, Burnham Business & Storage L.L.C., an Oregon limited liability company ("Grantor"), hereby grants and conveys unto the City of Tigard, an Oregon municipal corporation ("Grantee"), a perpetual public trail easement("Easement") on, over, across, and under Grantor's real property located in Washington County, Oregon, described and depicted in the attached Exhibit"A" ("Easement Area"),pursuant to the following terms and conditions: 1. Effective Date. This Easement shall become effective on the date of the last signature below(the "Effective Date"). 2. Purpose and Scope of the Easement. The purpose of this Easement is for general public access and use on, over, and across the Easement Area, of a public trail for pedestrians, bicycles, and other recreational uses. Grantee, its contractors and agents, also shall have the right to use, access, and enter upon the Easement Area to install, construct, use, reconstruct, repair,maintain, and replace the trail, trail-related improvements, and vegetation in the Easement Area. Grantee may use equipment and vehicles deemed appropriate by Grantee for such purposes. 3. Grantor's Use and Restrictions. This Easement shall run with the land and be binding on Grantor's heirs, successors, and assigns. Grantor may, however, use the Easement Area for public use, as stated herein,provided such use does not interfere with or restrict Grantee's or the public's rights of use or access, as stated herein, or obstruct the Easement Area in any way. Grantor shall not construct any permanent or temporary structure within the Easement Area. 4. Restoration, Maintenance,and Repair. Grantee, at its sole cost and,expense shall reasonably maintain the Easement Area in good condition and repair and in a manner that is safe for trail use. Page 1 —PUBLIC TRAIL EASEMENT 5. Effect and Duration of the Easement. Subject to all prior easements or encumbrances of record, the rights, covenants and obligations contained in this Easement shall bind, burden and benefit each party's successors, assigns, invitees and lessees. This Easement shall remain in effect perpetually, unless vacated by Grantee. In such an event, all rights held by Grantee shall be forfeited, and the Easement shall immediately revert to Grantor, its successors, and assigns. 6. Default and Remedies. If either party violates any of the terms, covenants or conditions of this Easement, or fails to perform any of its obligations set forth in this Easement in a timely manner,the other party shall have the right to declare a default by written notice and, if such default is not cured as provided in this paragraph, may seek available legal or equitable remedies, including injunctive relief, in the Circuit Court of the State of Oregon in Washington County. All disputes arising out of this Easement shall be construed in accordance with Oregon law. Notice shall be given as provided for in Section 7 below. The notice shall provide a detailed statement(s)of the alleged default. If the defaulting party fails to cure the default within ten (10) days from the Delivery Date of the notice (as defined below), or if within such ten (10)-day period that party has not begun to cure a matter that cannot reasonably be cured in ten (10) days or does not diligently prosecute the cure to completion, then the party asserting the default may pursue the remedies described in this paragraph. Once notice of default has been given, no additional notice shall be required in order to exercise the remedies provided for in this paragraph. 7. Notices. All notices, approvals, consents or requests given or made pursuant to this Easement shall be deemed delivered: (a) upon receipt by personal delivery when written acknowledgment of receipt thereof is given; (b) if given by United States mail,certified mail, return receipt requested, with postage prepaid, two (2) days after it is deposited in the mail; or(c) if given by a nationally recognized overnight carrier prepaid for next business day delivery,upon the business day delivered("Delivery Date"). Copy of the notice must also be sent by electronic mail (email)when made to Grantee. Notwithstanding, email delivery does not change the Delivery Date. Notices shall be addressed as follows until a new address for notices shall be designated by notice in the manner provided in this paragraph to all other parties: If to Grantor: Burnham Business& Storage L.L.C. 9500 SW Barbur Blvd, Ste. 300 Portland, OR 97219 If to Grantee: City of Tigard Attn: City Engineer 13125 SW Hall Blvd Tigard, OR 97223 email address:joew@tigard-or.gov With a copy to: City of Tigard Attn: City Attorney 13125 SW Hall Blvd Tigard, OR 97223 Page 2—PUBLIC TRAIL EASEMENT email address: shelbyr@tigard-or.gov 8. Severability. If any provision of this Easement, or the application thereof to any person or circumstances shall, to any extent, be held invalid, inoperative or unenforceable,the remainder of this Easement, or the application of such provision,to any other person or circumstance shall not be affected thereby. The remainder of this Easement shall be given effect as if such invalid or inoperative portion had not been included. It shall not be deemed that any such invalid provision affects the consideration for this Easement. 9. Amendment. This Easement may be amended only by an instrument in writing signed by Grantor and Grantee. Page 3 —PUBLIC TRAIL EASEMENT GRANTOR: GRANTEE: Burnham Business& Storage LLC, City of Tigard,an Oregon municipal corporation, an Oregon limited liability company an Oregon municipal corporation, Accepts and agrees to the terms of this Easement: By:Randall Realty Corp, an Oregon corporation Its manat, . By: .� � By; �? I t Name: Randall E.Nor4art Name: ,.AVE `.M /Z. Its: PresidentIts: C I1` ` 24). Date: .3 2 Date: ,,,icor,,//....../C.,./. B , r Name: Ronald L. Koos Its: Vice President Date: /....2ca.3 STATE OF 0 reyn ) ) ss. County of ) This instrument was acknowledged before me on khil l 202 by Randall E.Nort art , as President ,of Randall Realtti Corp an Oregon corporation " .,. OFFICIAL ) ss. 11 aA.- 1 -�4, mia: • — DIANNE M KILEY Nb ARY PUBLIC FOR OREGON NOTARY PUBLIC-OREGON COMMISSION NO 1019251 My Commission Expires: ;: 5> MY COMMISSION EXPIRES NOVEMBER 28,2025 STATE OF ) )ss. County ofMtA, ) This instrument was acknowledged before me on Fe Lrot$ 2023,by Ronald L.Koos,as Vice President ,of Randall Reale C‹rp,an Oregon corporation . - '1141111W ® � ��� OFFICIAL STAMP ARY PUBLIC FOR OREGON r1= DIANNE M KILEY My Commission Expires: l f I 2V 043 ‘,..-:,..-iiiNOTARY PUBLIC-OREGON COMMISSION NO.1019251 MY COMMISSION EXPIRES NOVEMBER 28,2U4 Page 4—PUBLIC TRAIL EASEMENT STATE OF 0 0 ) / ,' ) ss. County of lti -L6►'L ) , 2023 by This instrument&was acknowledged before me on /� Zl, 3'+2Cv j , as et- N .. cf of s v7 'f f` ;';T OFFICIAL STAMP NOTARY PUBLIC FOR ORE{`O CAROL ANN KRAQER • My Commission Expires: v1!> „?..0c1 NOTARY PUBLIC-OREGON ° COMMISSION NO.1028802 J MY COMMISSION EXPIRES SEPTEMBER 20 2026 , Page 5 —PUBLIC TRAIL EASEMENT EXHIBIT A CITY-HALL-TL-25102DB200-BIKE-PED PUBLIC TRAIL EASEMENT JOB NO. 1500087 24 MAY 2022 LEGAL DESCRIPTION THREE TRACTS OF LAND BEING PORTIONS OF THAT PARCEL OF LAND DESCRIBED AS PARCEL II IN WARRANTY DEED TO BURNHAM BUSINESS AND STORAGE, LLC,AN OREGON LIMITED LIABILITY COMPANY, IN DOCUMENT NUMBER 95-060750,WASHINGTON COUNTY DEED RECORDS,LOCATED IN THE SOUTHEAST QUARTER OF SECTION 2,TOWNSHIP 2 SOUTH,RANGE 1 WEST,WILLAMETTE MERIDIAN,CITY OF TIGARD,WASHINGTON COUNTY,OREGON,BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: TRACT 1 COMMENCING AT THE NORTHWESTERLY CORNER OF PARCEL 1, PARTITION PLAT NUMBER 2020-014, WASHINGTON COUNTY PLAT RECORDS;THENCE NORTH 61°52'14" WEST 473.21 FEET TO THE SOUTHEASTERLY CORNER OF SAID PARCEL II AND TO THE TRUE POINT OF BEGINNING;THENCE ALONG THE SOUTHERLY LINE OF SAID PARCEL II SOUTH 87°48'30"WEST 34.75 FEET TO A POINT,SAID POINT HEREINAFTER REFERRED TO AS POINT A;THENCE LEAVING SAID SOUTHERLY LINE NORTH 84°58'41" EAST 20.76 FEET;THENCE NORTH 87°44'24" EAST 15.06 FEET TO THE EASTERLY LINE OF SAID PARCEL II;THENCE ALONG SAID EASTERLY LINE SOUTH 42°55'30" WEST 1.48 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING 26 SQUARE FEET OR 0.001 ACRES (MORE OR LESS). TRACT 2 COMMENCING AT AFOREMENTIONED POINT A;THENCE SOUTH 87°48'30"WEST 31.31 FEET TO THE TRUE POINT OF BEGINNING;THENCE CONTINUING ALONG SAID SOUTHERLY LINE SOUTH 87°48'30"WEST 24.44 FEET; THENCE NORTH 29°20'00"WEST 9.73 FEET TO A POINT,SAID POINT HEREINAFTER REFERRED TO AS POINT B; THENCE LEAVING SAID SOUTHERLY LINE SOUTH 58°48'14" EAST 9.74 FEET;THENCE SOUTH 83°09'30"EAST 21.01 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING 64 SQUARE FEET OR 0.002 ACRES(MORE OR LESS). TRACT 3 COMMENCING AT AFOREMENTIONED POINT B;THENCE NORTH 29°20'00"WEST 19.36 FEET TO THE TRUE POINT OF BEGINNING;THENCE CONTINUING ALONG SAID SOUTHERLY LINE NORTH 29°20'00"WEST 180.59 FEET;THENCE LEAVING SAID SOUTHERLY LINE SOUTH 30°32'11"EAST 141.60 FEET;THENCE SOUTH 24°58'37" EAST 39.14 FEET TO THE TRUE POINT OF BEGINNING. CONTAINING 268 SQUARE FEET OR 0.006 ACRES(MORE OR LESS). PAGE 1 OF 4 THE BASIS OF BEARINGS IS THE OREGON COORDINATE REFERENCE SYSTEM (OCRS), PORTLAND ZONE. THE TRACTS OF LAND ARE SHOWN ON THE ATTACHED EXHIBIT MAP AND BY THIS REFERENCE MADE PART THEREOF, REGISTERED PROFESSIONAL LAND SURVEYOR DIGITALLY-SIGNED OREGON MAY 13, 2014 JOHN ROBERT DAVIS 88694 EXPIRES 12/31/23 PAGE 2 OF 4 PARCEL JI DOC.NO.95-060750 BURNHAM BUSINESS& STORAGE,LLC. m I-- 1.4.1 w Ss to in TRUE POINT OF BEGINNING TRACT 3 T- TRACT 2 TRACT 1 O.. PUBLIC TRAIL EASEMENT PUBLIC TRAIL EASEMENT 4r , „ 6'c7 ss8° AREA=64 SQ.FT. AREA=26 SQ.FT. S 42 55 30 W ' ' 498' 1.48' POINT B 2 ) ,q F S$3°09'30 E N 84°58'41" E N S7°44'24" E �`�° 21•(111 587'4830°w 20.76 `''o, 31.31' 5 87°48'30"W 34.75 ?I4 iv o S 8704810"W O; 24.44' POINT'A' 4. TRUE POINT OF TRUE POINT OF POINT OF PARTITION PLAT BEGINNING BEGINNING COMMENCEMENT NO.2020-014 TRACT 2 TRACT 1 NW'LY CORNER PARCEL 1 PARCEL 1 PARTITION PLAT NO.2020-014 NORTH —_ l'' . M.- SCALE:1"=20' EXHIBIT MAP DATE: 24MAY2022 011 SW Fifth Ave.,State 2400 CITY-HALL-TL-2S1020B200-BIKE-PED DRAWN BY; CMR Portland,OR 47204 .. PUBLIC TRAIL EASEMENT CHECKED BY: J D Ot 503.227.3251 F:503.274.4681 SE 1/4 SEC.2/T.2 5./R.1 W./W.M. PROJECT NO. 1500087 wxv k°Rwm CITY OF TIGARD/WASHINGTON COUNTY/OREGON SHEET: 3 OF 4 ti \\\‘‘I% :9s1%%17.?..tro, PARCEL II DOC.NO.95-060750 BURNHAM BUSINESS& STORAGE,LLC. S \�1 0,4 0 Ste" TRACT 3 i PUBLIC TRAIL EASEMENT { AREA=268 SQ.FT. 1 s 1J? 0 to u24. to Ni si) R. TRUE POINT OF BEGINNING 7.-..,......-- ...o. ®TRACT 3 '° _ acb nNORTH POINT'B' I. f SEE SHEET 2 SCALE:1"=20' EXHIBIT MAP DATE. 24 MAY2022 111 SW Fifth Ave.,Suite 2400 '.. CITY-HALL-TL-25102DB200-BIKE-PED DRAWN BY: CMR{ Portland,oRs72D4 PUBLIC TRAIL EASEMENT CHECKED BY: JRD 0:503.227.3251 ,. P:503.274.4681 SE 1/4 SEC.2/T.2 S./R.1 W./W.M. PROJECT NO. 1500087' wwwkPn rnm CITY OF TIGARD/WASHINGTON COUNTY/OREGON SHEET: 4 OF 4