Permit CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2022-00092
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 I Date Issued: 4/20/2023
s Parcel: 1S135AB01003
' Jurisdiction: Tigard
Site address: 10350 SW GREENBURG RD
Project: Margarita Factory Subdivision: METZGER,TOWN OF
Project Description: Demolition of interior dining, Bar,&non-bearing walls,with no structural elements. Lot: 9
Contractor: TALENTS CONSTRUCTION Owner:
915 SW BROADWAY SUITE 300 LINCOLN CENTER LLC
VANCCOUVER,WA 98660 BY SHORENSTEIN PROPERTIES LLC
235 MONTGOMERY ST, 16TH FLOOR
SAN FRANCISCO, CA 94104
PHONE: 360-818-7009 PHONE:
FAX:
Specifics: FEES
Type of Use: COM Description Date Amount
Permit Fee-Additions,Alterations, 05/02/2022 $619.25
Class of Work: DEM Type of Const: VB
Occupancy Grp: B Occupancy Load: 0 Demolition
Dwelling Units: 0 12%State Surcharge-Building 05/02/2022 $74.31
Stories: 0 Height: 0 ft Plan Review 04/18/2022 $402.51
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 05/02/2022 $1.00
Value: $40,000 11x17)
Erosion Control w/Development 05/02/2022 $107.60
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,204.67
Required: Required Items and Reports(Conditions)
1 Ersn Cntrl 503-639-4175
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: •
t.'"? rmittee Signature:
C .639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2022-00092
Date Issued: 4/20/2023
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 15135AB01003
Jurisdiction: Tigard
Site address: 10350 SW GREENBURG RD
Project: Diosa Subdivision: METZGER,TOWN OF Lot: 9
Project Description: Demolition of interior dining, Bar,&non-bearing walls,with no structural elements.
Contractor: TALENTS CONSTRUCTION Owner: LINCOLN CENTER LLC
915 SW BROADWAY SUITE 300 BY SHORENSTEIN PROPERTIES LLC
VANCCOUVER,WA 98660 235 MONTGOMERY ST, 16TH FLOOR
SAN FRANCISCO, CA 94104
PHONE: 360-818-7009 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: DEM Type of Const: VB Permit Fee-Additions,Alterations, 05/02/2022 $619.25
Occupancy Grp: B Occupancy Load: 0 Demolition
12%State Surcharge-Building 05/02/2022 $74.31
Dwelling Units: 0 Plan Review 04/18/2022 $402.51
Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 05/02/2022 $1.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $40,000 Erosion Control w/Development 05/02/2022 $107.60
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,204.67
and Reports Conditions
Required: Required Items p (Conditions)
1 Ersn Cntrl 503-639-4175
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain acepv of he rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
�
Issued By:�� Permittee Signature.
Ca 0 .4175 by 7:00 a.m.for the next available ins on date.
Thls permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial RECEIVED FOR OFFICE USE ONLY
City of Tigard APR 18 Zp2Z Received; y�ll .2.l /
• 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review n
Phone: 503-718-2439 Fax: 503-598-1960 Or TIGARD DateBy: <}' ) 1—Z Related Permit:
1 1(_,:11;U Inspection Line: 503-639-4175 CIIY Date ReadyBy: /� u lures: ® See Page 2 for
Internet: www.tigard-or.gov AJILDING DIVISIO o[ified/Nle[h !)k° i Supplemental Information
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑ New construction ®Demolition Permit fees*are based on the value of the work performed.
indicate the value(rounded to the nearest dollar)of all
0 Addition/alteration/replacement ❑Other: . equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El 1-and 2-family dwelling ®Commercial/industrial Valuation: $ /
❑Accessory building El Multi-familyNumber of bedrooms:
❑ Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 10350 SW GREENBURG RD New dwelling area: square feet
City/State/ZIP:TIGARD, OR 97223 Garage/carport area: square feet
Suite/bldg./apt.#: Project name: DIOSA TiErAflD > Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: METZGER, TOWN OF Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: 1 S 135A601003 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
PHASE 1 COMPRISES OF INTERIOR DEMOLITION OF INTERIOR DINING, (E) Valuation: $ 40 000
BAR, &NON-BEARING WALLS EXCEPT FOR NO STRUCTURAL ELEMENTS Existing building area: 8773 square feet
DEMOLITION. New building area: square feet
❑ PROPERTY OWNER ® TENANT Number of stories: 1
Name: JORGE CASTRO, PEARL WEST RESTAURANT GROUP Type of construction: V-B
Address: Occupancy groups:
City/State/ZIP: JORGE CASTRO Existing: A-2
Phone:( 503 )548 8669 Fax: ( ) New:
12:1 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name: ABBASI DESIGN WORKS (Please refer ro fee schedule)
Structural plan review fee(or deposit):
Contact name: RAHIM ABBASI Plea e e ptoki 1pet
Q FLS plan review fee(if applicable):
Address: 500 E 24TH STREET (14 vtYl^Qp et d s '-
\,.,
Total fees due upon application:
Amount received:
City/State/ZIP: VANCOUVER —
Phone:( 503)816 9466 Fax: :( )
E-mail: RAHIM@ABBASIDESIGN.COM ANI? MANi,J j'SRCEDef3
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
4. Commercial and residential prescriptive installation of
CONTRACTOR A eeAsiDesi G W a(0 m , roof-top mounted PhotoVoltaic Solar Panel System.
Business name: RUSS KLENNERT, TALENTS CONSTRUCTION Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 915 BROADWAY SUITE 300 Solar Installation Specialty Code checklist.
City/State/ZIP: VANCOUVER,WA 98660 Permit fee(includes plan review $180.00
and administrative fees):
Phone:( 360)818.7009 Fax:( )
State surcharge(12%of permit fee): $21.60
CCB Lie.:
��/1 Fz/ 3,/2 3 Jam'-)/ Total fee due upon application: $201.60
Authorized signal • This permit application expires if a permit is not obtained
S within 180 days after it has been accepted as complete.
Print name: / Date: 04/01/2022 * Fee methodology set by Tri-County Building Industry
Service Board.
'IF
I:1Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(1 I/02/COM/WEB)
-
•
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area:
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional actessible elements such as storage and
alarms: •
$
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Boilding\Permits\BUP_COM_PcrmitApp.doc Rev.03/05/2019
I
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
._ a Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ® map & tax lot# ® project name 21 site address ® suite number
CR zoning ® applicant name ® phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
I:\Building\Permits\BUP_COM_PermitApp.doc Rcv.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:\Building\permits\BUP_COM_PertitApp.doc Rev.03/05/2019