Permit (2) 111 CITY OF TIGARD REROOF PERMIT ~- Permit#: RER2023-00006 COMMUNITY DEVELOPMENT TIGAP 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 2/21/2023 Parcel: 1S135AB01003 Jurisdiction: Tigard Site address: 10350 SW GREENBURG RD Project: Margarita Factory Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Re-roof-Tear off existing roofing to the substrate and replace. Contractor: COLUMBIA ROOFING&SHEET METAL Owner: LINCOLN CENTER LLC 18525 SW 126TH PL BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-684-9123 PHONE: FAX: 503-684-1458 FEES Description Date Amount Permit Fee 02/09/2023 $1,196.55 Specifics: 12%State Surcharge-Building 02/09/2023 $143.59 Metro CET 02/09/2023 $137.42 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Load: Stories: Height: 0 ft Project Valuation: $114,514.00 General Information Building Area: 0 Re-Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: Parapets: Total $1,477.56 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permlttee Signature: .tee"r„ �f �`*': \-Call 503.639.4175 by 7:00 a.m.for the next available inspection date. f' Thls permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Buildins Permit Application Re-Roof RECEIVED FOR OFFICE USE ONLY City of Tigard iav I ?7 a3 K14 Pe.mitNo.:. —000 06' • ;7' ti • Ph13125one:SW 503.71 Hall8.2439 Blvd.,TiFax: 50gard,DR3.596 97223 .19 A N 2 3 2023 Plan Review Date/B Other 'r I G A l:D Inspection Line: 503.639.4175 Dare Ready/By: Atria: Et See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: Supplemental Information BUILDING DIVISION euvta`if,-d , lrGo . TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction El Demolition Permit fees'are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling [Commercial/industrial Valuation: S ElAccessory building ❑Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION 1 Total number of floors: Job site address: 10 35.0 St)) 6u- & bo rr� R8. New dwelling area: square feet City/State/ZIP: fi fyl,,t 1. . 972Z 3 U Garage/carport area: square feet Suitelbldgfapt.no.: J pR rolect name: f�/g4t,fn l 4vCY Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees'are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the << DESCRIPTION OF WORK work indicated on this application. i. Jee SGoFe, of Work Valuation: s x 51y Existing building area: 31/ square feet New building area: 011.1 square feet 1E1 PROPERTY OWNER 0 TENANT Number of stories: Name: Shp($rh�41-B:n R.podd / 3 ( j (es Lp Type of construction:Tear�c fr Pg.(aOf Address: PV 13oX g'z 52 6 Occupancy groups: [3 City/State/ZIP: 40( e+ / (A, $ZS S5 Existing: Phone:(S i3) Fax:( ) New: 0 APPLICANT 0 CONTACT PERSON NOTICE Business name:4.L 101,,,t1,14..„ fr r5keer /ta( All contractors and subcontractors are required to be Contact name: 4y, d licensed with the Oregon Construction Contractors Board 5z6 S tt) Vi f/a[v under ORS 701 and may be being o licensed in the Address: jurisdiction in which work is performed.If the City/State/ZIP: �tJrAk f( r e v C{ !� al applicant is exempt from licensing,the following reasons u R4 `1-067 PAY: Phone:(603) i f 1 t 23 Fax::( ) E-mail:1Jal`Wj rer'tofpic'tJ• -i'w CONTRACTORJJ 0 Business name: 1Uinbut-- &►t,5-trV '{-t ON Sen/J(.�. [NC. BUL.DINGPERMITFEES* Address:jOS-15 J W 1.z6*k V ictC2 (Please ndartoJseaeRedak) City/State/ZIP:TU ICI 07 r 41 r4-v WZ Structural plan review fee(or deposit): p U 2 FLS plan review fee(if applicable): Phone:(SO' G 9L- l 12 Fax:( ) Total fees due upon application: CCB tic.: 1. 6 n I.- Amount Amount received: Authorized signature:c 5 4 f%vrr�y This permit application expires if a permit is not obtained �{ 1 �O/ within 180 days after it has been accepted as complete. Print name: c}-,//, i6 '�P(.\elo_ Date: 1'23-�2") • Fee methodology set byTri-County Building Industry (� Service Board. I:1Building\PumitAAROOF-PeneitApp.dcc le/01/09 4464617T(I I/OLCOM/WEB) • City of Tigard: Re-Roofing Permit Checklist Page 2 -Supplemental Information RESIDENTIAL(One-&Two-Family Dwelling) El REPAIR(major)plan review required by plans examiner: building permit is required when structural changes are made or the space sheathing is removed or replaced. SUBMIT TWO (2) SETS OF PLANS SPECIFYING: A. Roof area and nearest street. B. Attic vents: Provide 1 sq. ft. for each 150 sq. ft. of attic space. Vents shall be located in the upper 1/3 of the roof. Provide 1 sq. ft. for each 300 sq. ft. when eave and attic venting is provided. Note: No permit is required for residential re-roof if not more than two(2) layers of roofing will exist upon completion of the re-roofing. COMMERCIAL(includes multi-family and condominiums) • ❑ RE-ROOF: Pre-inspection is required for all roofs sloped 2:12 and less. Call 503.639.4175, for code 295 Miscellaneous inspection after permit is issued. ❑ PLAN REVIEW: Note: Depending on the conditions noted at the pre-inspection,plans may be required to address any non-conforming items. • VALUATION OF PROJECT: $ sq.ft. of roof area Permit Fee based on valuation: $ (see Building Permit Fees chart) 12% State Surcharge: $ 65% Plan Review Fee: $ (Required for major repairs of residential and special purpose roofing of commercial projects.) TOTAL: $ 1:1Bullding\Permits\ROOF_PermitApp.doc 2 SCHEDULE 2 DESCRIPTION OF WORK Scope of Work Coordinate all work through building staff prior to commencement. Tear O0' I. Tear off the existing roofing dnwn to the substrate as well as any roof related metal coping caps.wall skirt and counter flashings and dispose of offsire in a legal manner. 2. Inspect the roofing substrate for damage and deteriorations from water damage.structural movement,and any other condition that does not meet code.All substrate will be repaired in accordance with codes and in like materials as the existing roof. When the roof is open and damage is found a representative from your organization will need to be available to approve the replacement as stand-by time and weather conditions make this vet),sensitive to costs incurred. We will invoice at our contractual rate listed below.Upgrades will need to be prenpproved. 3 Replace any damaged or dry roiled sheathing on a time and materials basis of$96.00 per hour plus materials marked up 25%for overhead and burden.Any change orders will be added to the total lump stun of the base bid price. 4. II'a structural failure of members is present,we may be requited to bring in a registered structural professional engineer to evaluate the condition and to make recommendations,designs-and calculations as required by codes and enforcing jurisdiction.This will be an extra cost on a time and material bases. 5. Re-install substrate as needed at the change order rate. 6. Clean the substrate to the appropriate condition For acceptance of the next layer of the roof assembly. 7. Clean debt-is front site daily and remove the debris as needed and dispose in an offsire location in a legal manner. PVC Mechanically Attached Systems 1. Furnish and install a layer of Yz'secursheild over the wood substrate and mechanically attach to the substrate.This will give the roof assembly a Class"A"fire rating. 2. Over the securshield,furnish and Install a new 60 mil PVC roof membrane and mechanically attach to the substrate. 3. All field and base flashing seams will be cleaned before welded. 4. Furnish and install new PVC base fleshings around ail curb penetrations. 5. At all skylight locations, remove the skylights and set aside to reuse. 6. Furnish and Install new PVC base'lashings that will extend up and over the top of the skylight curb to the manufacturer's specification. 7. Furnish and Install new foam sealant tape around the top of the curb prior to installing the skylights. 8. Reinstall the existing skylights over the curbs and secure to the curb with new neoprene gasketed fasteners, 9. Furnish and Install pre-manufactured inside/outside PVC corner fleshings at curb penetrations, thru wall scupper drains, pitch pans and wall fleshings. 10.Furnish and Install new pre-manufactured pipe boots on all pipes up to 6'In diameter complete with a new stainless-steel clamps and sealant. 11.All pipes larger than 6'in diameter will be field wrapped with unreinforced PVC membrane complete with a new stainless steel pipe clamp and sealant. 12.Furnish and Install PVC patches at all 7-Joints in the field membrane. 1 Last Revision 10125/21 Agreement for Project Services-CO-10 13.At all gas and electrical tines,furnish and Install pre-manufactured PVC pitch pans. 14.Furnish and Install pre-manufactured PVC pitch pans around the line sets oft the condensing units. 15.Fumleh end Install a 1-part poly-urethane rubberized pitch pan sealant In each pitch pan. 16.Furnish and Install new PVC base fleshings at all parapet walls that will extend up and across the top of all walls. 17.Fumish and Install new PVC base fleshings at all parapet wails that will extend up the wall a minimum of 8". 18.Fumish and install a metal anchor bar to the top of the flashing and mechanically attach every 12"on center. 19.Fabricate and Install new clad steel thru wall drain fleshings and mechanically attach to the substrate.Furnish and Install new PVC fleshings to the drain. 20.Furnish and Install new PVC membrane In the roof drain assemblies and set-In water cut off mastic.Install the clamping ring to the drain body compressing the PVC membrane Into the water cut off mastic to Insure a watertight seal. Install new drain bolts complete with new washers. 21.Relnstall the drain screens back In place once the drain rings are Installed. 22.Fabricate and Install clad steel drip metal along the gutter and mechanically attach every 12"on center to the wood substrate. Leave a�'/."gap between the joints In the metal flashing. 23.Fabricate and Install new 24-gauge galvanized clip metal to be Installed along the outside of all parapet walls.Mechanically attach the clip to the well. 24.Fabricate and Install new pre-painted standard color 24 gauge galvanized standing seam coping cap around the perimeter of all parapet walls.All new metal coping caps will be installed by hooking the front face Into the clip metal to secure the face of the metal to the building. Mechanically attach to the wall with new neoprene gasketed►asteners. 25,Fabricate and Install new pre-painted standard color 24-gauge surface mounted metal counter fleshings along the Inside walls.These fleshings will counter over the new PVC membrane fleshings and be mechanically attached 12"on center.Install a poly-urethane caulking to the top of the fleshing to Insure a watertight seal. 26.Fabricate end Install new pre-painted standard color 24-gauge metal counter fleshings around each HVAC unit and mechanically attach to the curb with new neoprene gasketed fasteners. 27.Upon completion of ail the work we will have the manufacturer's representative Inspect the roof for completeness and for the issuance of the factory warranty. 28.Upon completion of the above work, remove all tools and debris and leave the site In a clean and orderly condition. Sheet Metal Standing Seam(Currant tile roof sections) 1. Tear off existing tile and dispose of offsite in a legal manner. 2. Fabricate and install new 24-gauge metal drip edge. 3. Fabricate and install pre-painted standard color 24-gauge c-channel and rake edge flashing. Note: c-channel maybe used to strengthen rake edge flashing. 4. Fabricate and install pre-painted standard color 24-gauge standard ridge. 5. Furnish and install 16"pre-painted standard color 24-gauge,mechanically fastened seam according to manufacturer's specifications. 6. Furnish and install new Decktite pipe boots at pipe penetrations. 7. Upon completion and payment furnish all warranties Last Revision 1a125121 Agreement for Project Services-pg.11