Loading...
Permit CITY OF TIGARD REROOF PERMIT COMMUNITY DEVELOPMENT Permit#: RER2023-00005 T t[;A R,03 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 2/21/2023 Parcel: 1 S135BC00700 Jurisdiction: Tigard Site address: 10831 SW CASCADE AVE Project: Rose City Futsal Subdivision: None Lot: None Project Description: Re-roof-Tear off existing roofing to the substrate and replace. Contractor: COLUMBIA ROOFING &SHEET METAL Owner: CASCADE FUTSAL LLC 18525 SW 126TH PL 5010 NE OREGON ST TUALATIN, OR 97062 PORTLAND, OR 97213 PHONE: 503-684-9123 PHONE: FAX: 503-684-1458 FEES Description Date Amount Permit Fee 02/09/2023 $2,422.67 Specifics: 12%State Surcharge-Building 02/09/2023 $290.72 Metro CET 02/09/2023 $380.81 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Load: Stories: Height: 0 ft Project Valuation: $317,344.00 General Information Buildinq Area: 0 Re-Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: Parapets: Total $3,094.20 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work Is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available Inspection date. This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Re-Roof RECEIVED i ou of l'I(:I.: t SLO.LY CityTi Received 1 �3 ,-Z permit N° ,-� of and g oate/By: t 7F 6Ti1L1[) 13125 SW Hall Blvd.,Tigard,OR 97223 I A N Z 3 2023 Plan Review ' lIl Phone: 503.718.2479 Fax: 503.598.1960 OatdBy: ___________ Other Permit: .1./G A it t, Inspection Line: 503.639.4175 CITY OF TIGARD D8le Ready/By. / / '"°`. I ®sm Page"°` Internet: www.tigard-or.gov BUILDING DIVISION Notified Method: / 9 3. Supplemental Information (n-r x,( -ct e-k TYPE OF WORK REQUIRED DATA:S-AND 24FAM[I Y DWEL41NG ❑New construction 0 Demolition Permit fees'arc based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all IN Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: S IDAccessory building 0 Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:10831 SW Cascade Ave New dwelling area: square feet City/State/ZIP:Tigard, OR, 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Rose City Futsal Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQ EPA COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees'are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the - DESCRIPTION OF WORK work indicated on this application. See Scope Of Work Valuation: s 317,344.00 Existing building area: 34,085 square feet New building area: 34,085 square feet I& PROPERTY OWNER 0 TENANT Number of stories:1 Name:Cascade Futsal LLC Type of construction:Tear Off& Re-roof Address:5010 NE Oregon St Occupancy groups:B City/State/ZIP:Portland OR Existing: Phone:( ) Fax:( ) New: IR APPLICANT 0 CONTACT PERSON . NOTICE Business name:Columbia Roofing & Sheet Metal All contractors and subcontractors are required to be Contact name:Jacob Epling licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:18525 SW 126th Place jurisdiction in which work is being performed.If the City/State/ZIP:Tualatin, OR, 97062 applicant is exempt from licensing,the following reasons apply: Phone:( 503)648-9123 Fax: :( ) E-mail:jacob@reroofnow.com CONTRACTOR Business name:Columbia Construction Services INC BUILDING PERMIT FEES` (Pfeare sefer to fee schediil Address:18525 SW 126th Place Structural plan review fee(or deposit): city/StaterZIP:Tualatin, OR, 97062 Phone:(503 )684-9123 Fax ( ) FLS plan review fee(if applicable): CCB Iic.:116607 Total fees due upon application: `` (�9 (/ Amount received: Authorized signaturep This permit application expires if a permit is not obtained within Igo days after it has been accepted as complete. Print name: Jacob Epling Date:1/23/2023 • Fee methodology set by Tri-County Building Industry Service Board. I.IBaldina'PmmaskROOF-PcmulApr,doe I16e1/09 440-4613T(11l02/COM/WEB) City of Tigard: Re-Roofing Permit Checklist Page 2-Supplemental Information RESIDENTIAL(One-& Two-Family Dwelling) ❑ REPAIR (major) plan review required by plans examiner: building permit is required when structural changes are made or the space sheathing is removed or replaced. SUBMIT TWO(2) SETS OF PLANS SPECIFYING: A. Roof area and nearest street. B. Attic vents: Provide 1 sq. ft. for each 150 sq. ft.of attic space. Vents shall be located in the upper 1/3 of the roof. Provide 1 sq. ft. for each 300 sq. ft. when eave and attic venting is provided. Note: No permit is required for residential re-roof if not more than two (2) layers of roofing will exist upon completion of the re-roofing. COMMERCIAL(includes multi-family and condominiums) ❑ RE-ROOF: Pre-inspection is required for all roofs sloped 2:12 and less. Call 503.639.4175, for code 295 Miscellaneous inspection after permit is issued. ❑ PLAN REVIEW: Note: Depending on the conditions noted at the pre-inspection, plans may be required to address any non-conforming items. VALUATION OF PROJECT: S sq.ft. of roof area Permit Fee based on valuation: S (see Building Permit Fees chart) 12% State Surcharge: $ 65% Plan Review Fee: $ (Required for major repairs of residential and special purpose roofing of commercial projects.) TOTAL: $ 1:\1 uilding\Permits\ROOF_PermitApp.doc 2 Scope of Work Tear Off I. Tear off the existing roofing down to the substrate as well as any roof related metal coping caps, wall skirt and counter flashings and dispose of offsite in a legal manner. I. Inspect the roofing substrate for damage and deteriorations from water damage,structural movement,and any other condition that does not meet code.All substrate will be repaired in accordance with codes and in like materials as the existing roof. When the roof is open and damage is found a representative from your organization will need to be available to approve the replacement as stand-by time and weather conditions make this very sensitive to costs incurred. We will invoice at our contractual rate listed below.Upgrades will need to be preapproved. 2. Replace any damaged or dry rotted sheathing on a time and materials basis of$96.00 per hour plus materials marked up 25%for overhead and burden.Any change orders will be added to the total lump sum of the base bid price. 3. If a structural failure of members is present,we may be required to bring in a registered structural professional engineer to evaluate the condition and to make recommendations, designs and calculations as required by codes and enforcing jurisdiction.This will be an extra cost on a time and material bases. 4. Re-install substrate as needed at the change order rate. 5. Clean the substrate to the appropriate condition for acceptance of the next layer of the roof assembly. 6. Clean debris from site daily and remove the debris as needed and dispose in an offsite location in a legal manner. TPO Mechanically Attached System% 1. After subcontractor removes all units on roof, Columbia will demo all existing curbs and install plywood over existing holes. 2. Temporary roofing will be installed over plywood areas and tied into existing roof. 3. Subcontractor is responsible for marking specific roof areas for the placement of the new curbs. 4. Once subcontractor is ready to begin new unit install, Columbia will level premanufactured curb and install to substrate. 5. Remove and build up one roof hatch to accommodate roof height change and reinstall hatch. 6. Demo all existing curbs, pipes, and vents that are not in use and install plywood over holes. 7. Furnish and install 1 layer of 2.3" rigid poly and 1 layer of 3.0"secureshield iso over the wood substrate. Install the insulation ensuring all joints are staggered. 8. Over the insulation, furnish and install a new 60 mil reinforced TPO roof membrane and mechanically attach to the substrate. 9. All field and base flashing seams will be cleaned before being hot air welded. 10.Furnish and install new TPO base flashings around all curb penetrations. 11.At all skylight locations, remove existing skylights and demo curbs. 12.After curb demo, cover holes with new plywood and 2"x4". 13.Furnish and install pre-manufactured inside/outside TPO corner flashings at curb penetrations, thru wall scupper drains, pitch pans and wall flashings. 14.Furnish and install new pre-manufactured pipe boots on all pipes up to 6"in diameter complete with a new stainless steel clamps and sealant. 15.All pipes larger than 6"in diameter will be field wrapped with unreinforced TPO membrane complete with a new stainless steel pipe clamp and sealant. 16.All pipes where a pre-manufactured pipe boot is not feasible will be field wrapped with unreinforced TPO membrane complete with a new stainless steel pipe clamp and sealant. 17.Furnish and install TPO patches at all T-Joints in the field membrane. 18.At all gas and electrical line penetrations, furnish and install pre-manufactured TPO pitch pans. 19.Furnish and install pre-manufactured TPO pitch pans around the line sets off the condensing units. 20.Furnish and install a one part poly-urethane rubberized pitch pan sealant in each pitch pan. 21.Furnish and install new TPO base flashings at all parapet walls that will extend up and across the top of all walls. 22.Build up walls to accommodate R-30 insulation package. 23.Fabricate and install new TPO clad thru wall drain flashings and mechanically attach to the substrate. Furnish and install new TPO flashings to the drain. 24.Fabricate and install new 26-gauge galvanized clip metal to be installed along the outside of all parapet walls. Mechanically attach the clip to the wall. 25.Fabricate and install new pre-painted standard color 26-gauge galvanized standing seam coping cap around the perimeter of all parapet walls. All new metal coping caps will be installed by hooking the front face into the clip metal to secure the face of the metal to the building. Mechanically attach to the wall with new neoprene gasketed fasteners. 26.Fabricate and install new pre-painted standard color 26-gauge metal counter flashings around each HVAC unit and mechanically attach to the curb with new neoprene gasketed fasteners. 27.Upon completion of all the work we will have the manufacturers representative inspect the roof for completeness and for the issuance of the factory warranty. 28.Upon completion of the above work, remove all tools and debris and leave the site in a clean and orderly condition.