Loading...
Report • V City of Tigard RECEIVEP Building Division • - - 13125 SW Hall Blvd, Tigard, OR 97223 SEP 2 8 2022 Phone: 503.718.2439 Fax: 503.598.1960 CITY OF TIGARD TIGARD Inspection Line: 503.639.4175 BUILDING DIVISION www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 8397 SW Durham Ln City: Tigard Zip: 97224 Owner's Name: Sonja Kuske Date: 09-27-2022 Contractor's Name: ION Developer LLC CCB #: 230394 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation ❑ Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? X❑ No OSSC or ORSC for design requirements. Is the wind exposure Yes If"Yes", qualifies for Wind Exposure "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes x❑ Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structures other than If"Yes", qualifies for ❑ Yes the prescriptive path. above ❑ No 1 I:/Building/Fors/PhotoVoltaic-Checklist02-01-11.docx Ms►2079 -{ c5-31 Is the construction material wood and does n Yes Type of If"Yes", qualifies for the construction qualify Construction as "conventional light U No the prescriptive path. frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. 0 Yes If"Yes", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for Yes the prescriptive path. n No Is the combined weight 0 Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance x Yes with Section 305.4(3) of If"Yes", qualifies for Elthe 2010 Oregon Solar No the prescriptive path. Code? n Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. x❑ of composition shingle. Is the roof mounted X Yes Connections of solar assembly the solar assembly connected to roof No If"Yes", qualifies for framingblockingthe prescriptive path. to the roof or directly? 2 I:/Building/Forms/PhotoVoltaic-Checklist02-01-11.docx . frt.g12022-0w ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? ❑ If"Yes", qualifies for Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted If the spacing falls solar systems Spacing of clamps? Minimum 24 inches within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? ❑ Yes the prescriptive path. ❑ No Is the roof decking of WSP min. '/2" thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof El Yes the prescriptive path. surface. ❑ No 3 1:/Building/Forms/PhotoVoltaic-Checklist02-01-11.docx 04,51-2622-oi3545/ Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: SILFAB Model Number: SIL-380 HC Listing Agency: 4 I:/Building/Forms/PhotoVoltaic-Checklist02-01-11.docx M,S i 202voo3se i : :::'::• : :i :i :: : :: i: : : i:�::.:.:.:: :i • :: :':':i :: :.x:'i: : : :•:': : �• *•���iii«i•Qi«i«•«•«•«e«•«•:«•«•�«•«i«•«s«•«•«•«i«i«•«•«i«i«i«•«•«•«•«•«i«i«•«i«❖«i«•.i«b•«•«i«s«•«04•J«•«•:•«•:«i«•:•:.«•«!::•:•«•«•�«•:•«•«•«!«•:•«•:•«i0«•«•••«•9►��� ., ..A. ++•� .••.•+ Signature Certificate "`: •+, • i%t Reference number:ARAQA-AMRDZ-CGSPT-PD8TC •��; • :••.O'•. '•••• :•••+ Vs• •s i AM '••••' Signer Timestamp Signature ..•+•; ;y0 .., •+, ,,.,. a,,,,,,. . .,.. W ,...�...=.,..w •.+. .•41'••• Dustin Davidson �" '••' ;O•S Email:dustin.davidson@ionsolar.com i +•0: ❖`'At' Sent: 27 Sep 2022 21:22:29 UTC •�•�.� ��•.; Signed: 27 Sep 2022 21:22:29 UTC _.,. <..,.v,. ;•�: %% ;IP address:216.21.162.207 •�+;: ':•V Location:Orem,United States :vs:, WI V ♦.. ••. 1+�•i ..•�.' Document completed by all parties on: �•; •:' ❖: 27 Sep 2022 21:22:29 UTC •:•.+; • .4 . +' •.+.•. .••,Page 1 of 1 d•••: 'O4', .H 4•�•�, •••••' '.•+: •ii 4.4* 441: . " . ; ..•L•iS ❖4 r❖.'. 4....' i.•.'. •0.4.4, ..r ••�+.• .••, r+•++•' i•+•i •i••' 4•4+;' + ;•t., y+•,1•414 ..:' ♦+ 1.`1, �••••+ .•••; ..r .•.+: f❖•r .+•+. 44,64. 044 •.•' a•••: :' A,.., ❖., NV .. .4444. ... 4••••• •IA, s�i. C••• Signed with PandaDocEl ;•;.;• •i•:' PandaDoc is a document workflow and certified eSignature •,17+1 r•' ;.•i•<' I••••, solution • trusted by 30,000+companies worldwide. 1 !G— ,••4., ••••. ❑ ++.:' ••.'. ..5,i i ii i,.i is i is :4 i i is i ii:•i i ii ii: : ii i i i i : ii :•ii ii icik i i i i i:':4':i'::i:'i'i:4::i': :•:•i�'4.••'t ikAST-Z02-2---003 ciEC$ ION Solar p� f; p" '4801 N University Ave.Suite 900 ION SEP 2 8 2012 Provo, UT 84604 luke.rowley@ionsolar.com GI°hY OF TIGARD 3UILDING DIVISION 20 September 2022 RE:Sonja D Kuske Residence-8397 Southwest Durham Lane,Tigard,Oregon To Whom It May Concern: I have evaluated the roof structural elements of the residence for the required design loads and the additional load that will be imposed by the proposed solar system.The existing roof information was provided by a site visit by an audit team at ION Solar. Based on that site visit, it is my understanding that the roof framing information is as follows: Roof Structure: Pre-Manufactured Wood Trusses with 2x4 Top Chords @ 24"O.C.that appear to be in good working order. Roofing Material: Composition Shingle The Required codes and loads are as follows: Codes: 2019 OSSC,2021 ORSC Risk Category: II Wind Speed (3-Sec Gust, MPH): 96 Exposure Category: B Ground Snow Load (psf): 36 Roof Snow Load (psf): 25 Roof Live Load (psf): 20(superseded by roof snow load) After reviewing the existing roof framing information and in accordance with the structural calculations on sheet 5-5 which were performed according to the applicable codes and loads above,it is my recommendation that the existing roof framing is adequate to safely and sufficiently support the required structural design loads and the weight of the new solar system as is.Alteration or replacement of existing structural elements is not required. This evaluation only applies to the areas of the roof that will be directly supporting the solar system and does not make any recommendations for any other structural components of the building.The racking must be installed per the manufacturer's recommendations. The 5/16"x 3-1/2"zinc plated steel lag screw used to attach the solar system to the roof must be staggered to evenly distribute the loads over the affected area and must penetrate the truss top chords with a minimum embedment depth of 2.5" THIS LETTER VOID UNLESS STAMPED Sincerely, A. Luke Rowley, PE (cskED PR Ores s \\G I N fF /per 9 950P OREGON ,9CgiV 11 ZG�cy 09/21/2022 NRO`N FXPIRFS•19/21/94