Loading...
Permit (2) CITY OF TIGARD PLUMBING PERMIT t , COMMUNITY DEVELOPMENT t` Permit#: PLM2022-00205 Tip ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 v 11 /i •) Date Issued: 7/18/2022 Parcel: 1 S 1260000300 Jurisdiction: Tigard Site address: 9665 SW WASHINGTON SQUARE RD CO2 Project: Aritzia Subdivision: None Lot: None Project Description: Plumbing for new tenant. 10/4/22:REPRINTED permit for change of contractor to Columbia Allied Services. Contractor: COLUMBIA ALLIED SERVICES INC Owner: PPR WASHINGTON SQUARE LLC 1315 SE GRACE AVE SUITE 130 BY MACERICH RET BATTLE GROUND, WA 98604 PO BOX 4085 SANTA MONICA, CA 90411 PHONE: 360-256-1024 PHONE: FAX: FEES Quantity Description Date Amount 1 ea Drinking Fountain 06/27/2022 $25.02 Specifics: 1 ea Expansion Tank 06/27/2022 $12.51 1 ea Floor Drain/Floor Sink/Hub 06/27/2022 $25.02 Type of Use: COM 1 ea Hose Bib 06/27/2022 $25.02 Class of Work: ALT 1 ea Primer 06/27/2022 $12.51 Type of Const: 1 ea Sink 06/27/2022 $25.02 Occupancy Grp: 1 ea Water Closet 06/27/2022 $25.02 Stories: 1 ea Water Heater 06/27/2022 $37.52 25 Misc Other Fee 06/27/2022 $25.02 1 Plan Review 06/27/2022 $53.17 1 12%State Surcharge- 06/27/2022 $25.52 Plumbing 45 Misc Administration Fee 10/04/2022 $45.00 Total $336.35 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: /'� — Permittee Signature: „„! Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.