Loading...
Report (2) FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 71 ; 2 . Transmittal Letter TIGARD, 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.tzov TO: Tom Hochstatter DATE RECEIVED: DEPT: BUILDING DIVISION )UN 2 1 2022 FROM: Target(Agent- Leif) ;II Y"OF TIGARD COMPANY: Lampert Group BUILDING DIVISION PHONE: (312) 956-4092 By xx--- EMAIL: LRE@Lampertgroup.build lo J Id RE: 9009 SW HALL BLVD, TIGARD, OR 97223 BUP2021-00253 (Site Address) (Permit Number) 2022 TARGET REMODEL-ARCHITECTURAL REV (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 3 Additicktal set(s) of plans. 3 Revisions: Arch+Structural Revision narrative Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. 3 Engineer's calculations. Other(explain): REMARKS: Architectural and Structural portion of a post approval revision to add a new fire pump room and to address required changes for the plumbing repair. FOR QFFICE USE ONLY Roiirted to Permit Techpkn: Date: 6 a) D.,z Initials'. Fees Due: Yb�y❑No Fee Description: Amount Due: Nr- pIch Oc.v: eve — $ 9 o---- $ $ $ Special Instructions: Reprint Permit(per P ): ❑ Yes Ne ❑ DoneM.,_ A licant Notified: Date: ,,% 2252--- Initials: 3u?2,021 -Co253 T-345 Changes to Drawings D3-CC 2833 RECEl VEn Structural: ��_, 9 i? Sheet S111 -(Full Size Sheet Re-Issued) CITY OF TIGARD 1. Plan 3/S111 —New exterior door BUILDING DIVISION Sheet S501 -(New Full Size Sheet Issued) 1. Detail 1-6/S501 —Details moved to new sheet 2. Detail 7/S501 - added stair detail 3. Detail 8/S501 - added stair detail 4. Detail 9/S501 - added stair detail All changes are clouded and noted with delta 3 T-345 Changes to Drawings D5-CC 3880 Structural: Sheet S111 -(Full Size Sheet Re-Issued) 2. Revised plan 1/S 111 —revised door location 3. Plan 4/S 111 —New interior door Sheet S141 -(Full Size Sheet Re-Issued) 1. Plan 3/S141 —New roof equipment plan Sheet S501 -(New Full Size Sheet Issued) 5. Detail 12/S501 - added interior slab detail 6. Detail 13/S501 - added door enlargement detail All changes are clouded and noted with deltas 430921z-t - ©C52 3 T-345 Changes to Drawings D3-CC 2833 Structural: RECEIVED J U N 2 1 20?2 Sheet Slll - (Full Size Sheet Re-Issued) 1. Plan 3/S111 —New exterior door CITY OF TIGARD BUILDING DIVISION Sheet S501 - (New Full Size Sheet Issued) 1. Detail 1-6/S501 —Details moved to new sheet 2. Detail 7/S501 - added stair detail 3. Detail 8/S501 - added stair detail 4. Detail 9/S501 - added stair detail All changes are clouded and noted with delta 3 T-345 Changes to Drawings D5-CC 3880 Structural: Sheet S111 -(Full Size Sheet Re-Issued) 2. Revised plan 1/S111 —revised door location 3. Plan 4/S 111 —New interior door Sheet S141 -(Full Size Sheet Re-Issued) 1. Plan 3/S 141 —New roof equipment plan Sheet S501 -(New Full Size Sheet Issued) 5. Detail 12/S501 - added interior slab detail 6. Detail 13/S501 - added door enlargement detail All changes are clouded and noted with deltas ICU PZpZt-0024-3 T-345 Changes to Drawings D3-CC 2833 Structural: REC Sheet S111 - (Full Size Sheet Re-Issued) EIVED 1. Plan 3/S111 —New exterior door 2 1 ZOZ2 CITY"OF TIGARD Sheet S501 -(New Full Size Sheet Issued) BUILDING DIVISION 1. Detail 1-6/S501 —Details moved to new sheet 2. Detail 7/S501 - added stair detail 3. Detail 8/S501 - added stair detail 4. Detail 9/S501 - added stair detail All changes are clouded and noted with delta 3 T-345 Changes to Drawings D5-CC 3880 Structural: Sheet SI11 -(Full Size Sheet Re-Issued) 2. Revised plan 1/S111 —revised door location 3. Plan 4/S 111 —New interior door Sheet S141 -(Full Size Sheet Re-Issued) 1. Plan 3/S 141 —New roof equipment plan Sheet S501 -(New Full Size Sheet Issued) 5. Detail 12/5501 - added interior slab detail 6. Detail 13/S501 - added door enlargement detail All changes are clouded and noted with deltas (301'202V— c OZ 3 ,ECtIVED MG 2 Corporationi' ' l CITY OF I 206 962 1; L�tiri� BUILDING D!','1SIGiN MG2 Target —T0345 Washington Square, OR 05/02/2022 Comments Response Memorandum The following CC #2833 is our response to the addition of a new fire pump room and changes required for plumbing repair scope. All changes within this Revision are clouded and noted with Delta #4. • G001 — COVER SHEET o Added sheet'A213 — EXTERIOR DETAILS'to"Sheet Index" • AD111 — DEMOLITION FLOOR PLAN & RCP o Added instances of demo keynotes'4,"4A,'&'4C' at Sales Floor for plumbing scope (1/AD111) o Added instance of demo keynotes'1,"1A,'&'3' at existing Water Service (1/AD111) o Added keynotes'4A'&'4C' (DEMOLTION KEY NOTES) • A001 — GENERAL ARCHITECTURAL INFORMATION o Added sheet'A213 — EXTERIOR DETAILS'to"Architecture Sheets" • A021 — CODE COMPLIANCE PLAN o Revised path of travel and added annotation for fire rating per Water Service layout (1/A021) o Revised Cap of Occ Req to align with total occupancy (Required Exit Width) o Revised Occupant Load to align with total occupancy (Table 2902.1 Minimum Plumbing Fixtures) • A111 — FLOOR PLAN o Revised layout at Water Service for new fire pump (1/A111) o Added plan callout 5/A111 (1/A111) o Added "WATER SERVICE ENLARGED FLOOR PLAN" (5/A111) • A121 — FLOOR FINISH & WALL FINISH PLAN o Added annotation for new flooring at Water Service (1/A121) o Revised extent of flooring to be replaced at Sales Floor for plumbing scope (1/A121) o Added CPT-17, CT-48, and RF-4 (AREA OF FLOORING REPLACEMENT) o Revised square footage for RF-1 and Grand Total (AREA OF FLOORING REPLACEMENT) • A125 — INSULATION AND BLOCKING PLAN o Revised layout at Water Service for new fire pump (1/A125) o Added instance of blocking keynote'3'&'13'at Water Service (1/A125) • A131 — REFLECTED CEILING PLAN o Revised layout at Water Service and associated lighting (1/A131) o Added plan callout 6/A131 (1/A131) o Added "WATER SERVICE REFLECTED CEILING PLAN" (6/A131) i3OP2621 0p2S-3 • A213 — EXTERIOR DETAILS o Added sheet in its entirety • A315 — STARBUCKS PLANS, ELEVATIONS & DETAILS o Revised area of existing CT to be removed for plumbing scope (1/A315) o Revised extent of flooring to be replaced at Coffee Sales for plumbing scope (4/A315) • A601 — PARTITION TYPES & SCHEDULES o Revised room finishes and notes for Water Service #140 (ROOM SCHEDULE) o Added detail references for fire rated walls (GENERAL PARTITION NOTES) • A611 — OPENING SCHEDULE & DETAILS o Added doors 140 & 140.1 with associated properties and notes (NEW OPENING SCHEDULE) The following CC #3880 is our response to note the new equipment on the roof for the fire pump room and the relocation of the Drive-Up Door. All changes within this Revision are clouded and noted with Delta #5. • AD111 — DEMOLITION FLOOR PLAN & RCP o Removed instance of demo keynotes'9X' per OSR (1/AD111) o Removed demo keynote and dimension for drive up door 145.1 (1/AD111) o Added instance of demo keynotes'3' and '1A'for new drive up door location (1/AD111) • A021 — CODE COMPLIANCE PLAN o Revised graphics to show removal of Exit 14 and conversion of Exit 12 to be the Drive-Up Door, removed and updated annotations accordingly (1/A121) o Removed Exit 14, revised Exit Width and Cap of Occ for Exit 12, revised Total Provided Width and Total Cap of Occ (2019 OSSC IBC EXIT CALCULATIONS) • A111 — FLOOR PLAN o Added dimension locating door 192 (1/A111) o Revised stud size at fixture wall (1/A111) o Removed door 145.1 o Replaced door 145 to be the Drive-Up Door. Relocated EAS pedestals and enlarged plan callout accordingly (1/A111) o Revised plan in its entirety (3/A111) o Revised elevation in its entirety to show simplified version (4/A111) • A121 — FLOOR FINISH &WALL FINISH PLAN o Revised location of carpet flooring and enlarged plan callout per new Drive-Up Door location (1/A121) o Revised finish plan in its entirety (3/A121) Page 2 of 3 u 7O co25-3 • A125 — INSULATION AND BLOCKING PLAN o Revised location of CCTV blocking and EAS pedestals per new Drive-Up Door location (1/A125) • A141 — ROOF PLAN o Added callouts for new PRV on roof(1/A141) o Added detail"FLASHING @ MISC ROOF CURB" (7/A141) • A303 — GUEST SERVICES PLANS & ELEVATIONS o Revised plan to show existing cart to remain and replacement of corner guard (1/A303) • A304 — GUEST SERVICES FINISH PLAN o Revised wall finish per OSR direction (1/A304) • A611 — OPENING SCHEDULE & DETAILS o Added Door 145 for Stock/ Drive Up Door in "New Opening Schedule" Page 3 of 3 / t / FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT IN li Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom Hochstatter DATE REUI !•Do DEPT: BUILDING DIVISION REC MAY 9 2022 !X. ...., FROM: Target(Agent-Leif) CITY OF TIGARD COMPANY: Lampert Group BUILDING DIVISION \,"\--r.) PHONE: (312)956-4092 By, ; )\%'13 EMAIL: LRE@Lampertgroup.build RE: 9009 SW HALL BLVD,TIGARD,OR 97223 BUP2021 00253 (Site Address) (Permit Number) 2022 TARGET REMODEL-DEFERRED SEISMIC FIXTURE SUBMITTAL (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: I Description: Copies: Description: v V Additional set(s)of plans. Revisions: Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. 2 Engineer's calculations. 2 Other(explain):STRUCTURAL FIXTURE PLAN AND DETAILS REMARKS: /1/4ul - yr v&ii: ,i- S71-211 r ,/ FORc . _ OFFICE USE ONLY Rou to Permit Technician: Date: ^ 3 Z- Initials: di) Fees Due: Y— ❑No Fee Description: Amount Due: V S - 1-f r Al 01 rtAt‘,91/4/ ----IV S----- $ $ $ Special Instructions: Z--/ Reprint Permit(per PE): ❑ Yes P No\ _ - ❑ Done Applicant Notified: Date: 61„' d )— _ Initials: i