Loading...
Permit Support Document (3) FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 11,1 _ ~ Transmittal Letter T I G n R n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Allyson Armstrong DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUN 2 3 2022 FROM: Matt Weatherdon/Val Howland CITY OF TIGARU COMPANY: Chad E. Davis Construction LLC BUILDING DIVISION PHONE: 503-357-8587 By. EMAIL: ValH@chadedavisconstruction.com RE:• 15382 SW Silkwood Court MST2021-00525 (Site Address) (Permit Number) Bull Mountain Summit-Lot 3 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: . Description: Copies:T Description; Additional set(s) of plans. 3 copies Revisions: Deck Revision Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: Submitting deck revisions for Bull Mountain Summit Lot 3-15382 SW Silkwood Court(MST2021-00525) 3 copies of each document is attached here. F R O FICE USE ONLY Routed to Pe t Te ician: Date: -7 i/ 2,1_ r,/ Initials: Fees Due: YC No Fee Descript on: Amount Due: 1/ $ ( � Cp tie Ifiv--) Cev , $ Special Instructions: 7; `�- ,,Reprint Permit(per PE): VYes -7 n No n Done Applicari 'Notifiett:' ' jtate: , /)_ _--- Initials: p FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT le Ifil :I Transmittal Letter T l GA R I) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: /( S tr n q DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVE FROM: ilid Valliterdli JUL 21 2022 COMPANY: ad r 14vi S 6nST -`ia►^ CITY OF TIGAI-II, BUILDING DIVIS 0'. PHONE: SC3- ZSO "O SS By: EMAIL: Mq W-e4Ae riC l rail-CO/4i RE: /S5?Z 5(il) S';1 h000ci C--- ilIST OOZ1 —oOs7 s (Site Address) (Permit Number) 6>11M4. S ,'iH- Z - c'5 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: w Description: Copies: Description: Additional set(s) of plans. - Revisions: 'Deck Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain):/ ,. REMARKS: 0,14 c ,jv',k /'eriSials FM( OF /ICE USE ONLY Routed to Permit Techni 'an: I te: 11r7_ Z"�� Initials: Fees Due: ❑Yes Nd/ Fee Description: Amount Due: $ !,/, ...........----. $ / Special Instructions: - Reprint Permit(per PE): Yes ❑No ❑Done Applicant Notified: Date: 7],-1)-2— Initials: City of Tigard 1,1 ' COMMUNITY DEVELOPMENT DEPARTMENT a Building Permit Review — Residential T I 6 A R D Building Permit#: 1—IST2--02(-00 62,5 Site Address: 15382w SW Silkwood Ct.. Project Name: Bull Mountain Summit Lot #: 3 Planning Review Proposal: New single detached house ElVerify address/suite#active in Acccla. 13 In River Terrace: CI No 0 Yes,River Terrace Rniew,4dderidiem Site Plan Elements: -7.,rosion Control It copies of site plan on 8-1/2"x 11"or 11 x 17"paper stained trees with drip line and tree protection measures Lill fawn to scale(standard architect or engineer s.cale) .00tprint of new structure(including decks)and FFE 11 orth arrow L,',..1tility locations&easements(required for new and additions) P'ill'ire address,project or subdivision name and lot number •Liidewalk/drn,eway approach 11 Spplicant information(name and phone number) ql‘...orstroTorwells/septic sY7Fetrir 12_sst dimensions and building setback dimensions • 4.feet tree size,type and location • 1 r , ....uare footage of buildings to be demolished street names . iusting structures on sire 'L.:0mo-elevations(2'contours if more than 4'differential ell or area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced 'es o impervious area (applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? 1:1 Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): Required: 0 Yes,applicant was notified El No Received: CI Yes E .., IDWater Meter Fixture Unit Worksheet—Additions,Remodels and ADUs Required: El Yes,applicant was notified [I No Received: Yes No El SDC Exemption for ADU applied for: Yes CI No Received: Yes No CI Public Facilities Improvement(PFI) Permit Required: 0 Yes,applicant was notified DI No Applied For: :I Yes CI No,stop intake Cl Land Use Case #: SUB2020-00001 El Zoning; 13-7 CIRequired Setbacks: Front: 15 Rear: 15 Side: 5 Street Side: 10 Garage: 20 Building Height: Max.height: 35 Actual Height: 25 Landsca e Area: 20 l % ] ElLot Coverage Max: 80 04 Entrance Set back no more than 8'from street-facing wall 0 Parallel to street or offset 45 degrees or less Windows Minimum 12`)/o of area of all street-facing facades Garage Ga e door is behind widest street-facing wall N ,,Yes CI No,one of the following is met: g Door extends no more than 5'from wall and there is a covered porch extending beyond garage. Door extends no more than 5'from wall and there is a 12 sq ft. '' dow above garage on 2'}d floor. 0 Garage door width is 12'or less 0 50%c.r ess of facade 60%or less and includes 7 of following 6. Covered porch "L' Recessed entrang4 12_1 W2ll offset 1'Roof cave Roof offset .., Fire shingles Lap Siding U Roof itch 1:1 Gable,A),or gambrel roof Dormer _Accent siding _Window trim Lj Window recess L, Window projection 0 Balcony CIVisual Clearance CI Urhan Foresta,naii CISensitive Lands: 0 Yes LJ No Type: El Conditions met prior to issuance of building permit Notes: 0 Approved By Planning: tjap ithitimairt il., Date: i Revisions (after Building Submittal only) Reviewer __44312201Date ziz.... Revision 1: Approved M 0 Not Approved I4tto Revision 2: Approved [..] Not Approved I AB ui Id in gTo rills\BldgPe r in i tR vw_RES_122419.docx Building Permit Submittal Original Submittal Date: I t/1,51/202 Site Plans: # Building Plans: # Building Permit#: REnter built- • permit#above. Workflow Routing: aPlanning P.I. Engineering &Permit Coordinator 3-Building Workflow Sign-off: [ 'Sign-off for Planning(include notes from planning review) Route Application Documents: g-Engineering: (1)copy of permit application,(1)site plan,(1)building plan and original plan review routing form. Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: /2/e),3(20 2.,f ,!nlineering Review . ff Slope at building pad: 2 0 Conditions"Met"prior to issuance of building permit DEasements(encroachments)per engineering conditions of approval and plat ITWater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes ErNo Assess Water Quantity Fee in-lieu: 0 Yes [ No LIDA Facility on lot 0 Yes Et No 0 Final Plat Recorded: CI NOT Approved by Engineering: Date: Notes: Do no 7i refr4.Je v n,t i I GP Kotarrft i ,--..e-0- Pt ,f- v-vcc-p-deot EY-Approved by Engineering: rv,e-inf 2 kie...i/.4. Date: f 7//3/ckzi Revisions (after Building Submittal only) Reviewer Date Revision 1: Ef/Approved 0 Not Approved riv„,,o/ Anut,..1 71/1 kipzr Revision 2: El Approved 0 Not Approved Permit Coordinator Review Conditions"Met"prior to issuance of building permit 0 Approved,NOT Released: RearcA ?lilt A mcotatifi - Al-- Date: 12415 17,02,1 Notes: Revisions(after Building Submittal only) Revision Notice 1: Date Sent to Applicant: At. 41 11312oz-2- Revision Notice 2: Date Sent to Applicant iSDC Exemption: 0 Received ;21 Does not aimly SDC Fees Entered: Wash Co Trans Dev Tax: /a Yes U N/A Tigard Trans SDC: ,VYes 0 N/A Parks SDC: ,ff Yes 13 N/A LIDA 0 Yes 2'N/A /OK to Issue Permit Approved by Permit Coordinator: liel/Vl. Date: 1 Building‘Forms`BldeennitRvw_RES_122419.docx