Permit CITY OF TIGARD BUILDING PERMIT
• I COMMUNITY DEVELOPMENT Permit ft: BUP2023-00030
Date Issued: 4/19/2023
TI GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S11313000300
Jurisdiction: Tigard
Site address: 8040 SW DURHAM RD
Project: Creekside Community High School Subdivision: None Lot: None
Project Description: New 480 sq.ft.greenhouse.
contractor: IN LINE COMMERCIAL CONSTRUCTION Owner: TIGARD-TUALATIN SCHOOL DISTRICT NO. 23J
18880 SW SHAW ST 6960 SW SANDBURG ST
ALOHA, OR 97006 TIGARD, OR 97223
PHONE: 503-642-5117 PHONE:
FAX: 503-649-3301
FEES
Specifics:
Description Date Amount
Type of Use: ACS
Class of Work: NEW Type of Const: VA Permit Fee-COM-New Construction 04/19/2023 $755.62
12%State Surcharge-Building 04/19/2023 $90.67
Occupancy Grp: U Occupancy Load: 5 Plan Review 04/04/2023 $491.15
Dwelling Units:
Info Process/Archiving-Sm$0.50(up to 04/19/2023 $18.00
Stories: Height: ft 11x17)
Bedrooms: Bathrooms: DC Apartments/Non-Res/Mixed Use 04/19/2023 $489.00
Value: $90,000 Review
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $1,844.44
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance., or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling .23 .198 r 1.8 2. 344.
Issued By: n' Permittee Signature:
/[ Call 503.639.4175 by 7:00 a.m.for the next available inspectio dat
This permit card shall be kept in a conspicuous place on the job site until c'mpletion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application ` . _p,7
1 Commercial FOR OFFICE USE ONLY
Cityof Tigard RECEIVEL)Keeeived
g DateB ,3 h)J,� fi z,....— Permit No.:e2-p �.— J
y: C1 vu
• 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
C Phone: 503-718-2439 Fax: 503-598-1960 MAR 1 5 2023 DateBy: 3 -a, -a3 j Related Permit:
T I G A IL D Inspection Line: 503-639-4175 Date Ready/By: Is, ® See Pagepplemental 2 forInformation
Internet: www.tigard-or.gov Notified/Method: Su
CITY OF TIGARD ,9 „ 1<ti
TYPE OF WOI IPILDINGDIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑ ew construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
[,1-and 2-familydwellingValuation: $
Lam` ❑Commercial/industrial
Accessory building ❑Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 8040 SW Durham Rd New dwelling area: square feet
City/State/ZIP: Tigard/Oregon/97224 Garage/carport area: square feet
Creekside Community High School
Suite/bldg./apt.#: Project name:Greenhouse Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Located south of the intersection from SW Carol Ann CT and HWY 141 • Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: 5040 Permit fees*are based on the value of the work performed.
Tax map/parcel#: 251138000300 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Construction of New Greenhouse with connection to water utility. Valuation: $ 90,000
Existing building area: 0 square feet
New building area: 480 square feet
PROPERTY OWNER 0 TENANT Number of stories: 1
Name: Tigard-Tualatin School District No. 23J (TTSD) Type of construction: Accessory structure
Address: 6960 SW SANDBURG RD Occupancy groups: No Occupancy
City/state/ZIP: TUALATIN, OREGON 97223 Existing:
Phone:(503)431 - 4016 Fax:( ) New:
ef APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name: StarlteC (Please refer to fee schedule
Structural plan review fee(or deposit):
Contact name: Matthew Lewis
Address: 601 SW 2ND AVE SUITE 1400 FLs plan review fee(if apptioable):
Total fees due upon application:
City/State/ZIP: PORTLAND, OREGON 97204
Amount received:
Phone:(503)419 - 2600 Fax::( )
E-mail: matthew.lewis@stantec.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: INLINE Commercial Construction Inc. Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 18880 SW SHAW STREET Solar Installation Specialty Code checklist.
City/State/ZIP: ALOHA OR 97078 Permit fee(includes plan review $180 00
and administrative fees):
Phone:(503)642 - 5117 XTf y#395 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lie.: 51880 l I t 3(9,j Total fee due upon application: $201.60
Authorized signature: 66 1 Y„ Matt Lewis This permit application expires if a permit is not obtained
g 2023.03.07 17:18:43-08'00' within 180 days after it has been accepted as complete.
Print name:Matthew Lewis Date: 2023-03-07 * Fee methodology set by Tri-County Building Industry
Service Board.
I:1Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
,.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
■ Accessibility: Barrier Removal Improvement Plan
111111
Commercial & Multi-Family - Additions or Alterations
T 1 G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains arc readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinldng fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
Enflineering Review
Slope at building pad: 31.
["PFI Permit#:
Et/ Conditions "Met"prior to issuance of permit vl icy
dEasements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes No
Assess Water Quantity Fee in-lieu: ❑ Yes 1�No
LIDA Facility on lot 0 Yes Dig No Add Fee: 0 Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: 7 - Date: 3/ /ar'z 3
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved ❑ Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: ❑ Approved 0 Not Approved
Permit Coordinator Review
-Er Conditions "Met"prior to issuance of permit 1 JA.
❑ Approved,NOT Released: Date:
❑ ENG Revisions Required: Date:
Notes:
SDC Exemption 0 Applied for 0 Received — Does not apply IADGIrAvo '
Fees Entered: Wash Co Trans Dev Tax: 0 Yes N/A ❑ Deferred/4
Tigard Trans SDC: 0 Yes VN/A 0 Deferredy
Parks SDC: ❑ Yes pi/N/A ❑ Deferred
LIDA Fee: 0 Yes N/A
2VOK to Issue/Approved by Permit Coordinator: Date: 3 7,0i,
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
I:\Building\Fonns\BldgPemutRvw_COM_W rthLandUse_08162022.docx
601 SW Second Avenue Suite 140
Portland OR 97204-3128
(503)419-2500 I Fax (503) 419-2600
Transmittal RECEIVED
Date: 03/14/2023 From: James Tran MAR 1 5 2023
To: City of Tigard Project 22116300 CITY OF TIGARD
Community Development Number: BUILDING DIVISION
13125 SW Hall Blvd.
Tigard, OR 97223 Project Creekside High School
Name: Greenhouse
Re: Creekside Building Permit
Application Submittal
We are sending you:
® Attached ❑ Under Separate Cover Via
® Drawings ❑ Contracts ® Plans ❑ Report
❑ Copy of Letter ❑ Aerials ❑ Proposal ❑ Other
QUANTITY DESCRIPTION
2 Structural Calculations
3 Structural Plans
3 Site Plans
1 Building Permit Application
These are transmitted as checked below:
® For approval ❑ For your use ❑ As requested ❑ For review and
comment
❑ For signature ❑ Call me ❑ Return ❑ For your information
REMARKS:
If any questions, please email James Tran at james.tran@cardno.com
Electric Vehicle Parking
Table 3.05E
Development or Use Description Stall Minimum Number or
Percent
I. Residential a. Multiple-family Zero to 19 n/a
development dwellings total
minimum
required
spaces
20 to 31 I stall
total
32 to 39 2 stalls
total
40 or more 2 stalls or 5%of total
total minimum required spaces.
whichever is greater
b. D‘‘ell inns other than multiple-family n/a
2. Non-residential Zero to 19 total minimum required spaces n/a
development within 20 to 39 total 2 stalls
commercial zoning 40 or more total 2 stalls or 5%. whichever is
districts greater
3. Industrial zoning Zero to 19 total minimum required spaces n a
districts 20 to 39 total spaces 2 stalls
40 or more total spaces 2 stalls or 5%,whichever is
greater
4. Public and Semi- Community college, col lege, business 2 stalls or 5%, whichever is
Public(P/SP)zoning school,and technical or trade school t greater
district Other uses nta
1. Standard applies even if the site is not zoned P/SP.
2. The Director may authorize EV parking for any use that the Development or Use column
does not clearly include.
3. See Section 3.05.031 below for EV development standards.
4. Administrative note: As of January 2022, electrical permitting remains through the County
instead of the City by agreement bets+een the City and County.
H. Effective July 1,2022,new commercial buildings are required to comply with electric vehicle
charging infrastructure requirements for parking areas in accordance with OAR 918-460-0200:
https://www.oregon.gov/bcd/laws-rules/Documents/20220701-hb2180•evcharging-pr.pdf
Response:Per Section(2)of OAR 918-460-0200,the building is not subject to EV requirements.
Section(2)states that this rule only applies to newly constructed buildings and parking areas serving
the following building types:
(a) Commercial buildings under private ownership
(b) Multifamily residential builds with five or more residential dwelling units;and
(c) Mixed-use buildings consisting of privately owned commercial space and five or more
residential dwelling units.
Frog Pond Primary School is a public building under school district ownership(government building).
EXECUTIVE ORDER NO. 17-20
PAGE 5
building code to require all newly constructed buildings will be ready
for the installation of solar panels and related technologies by October
1, 2020 for residential structures and October I,2022 for commercial
structures. BCD may establish limited specific exemptions to this solar-
ready policy for buildings where solar applications are infeasible.
B. Electric Vehicle Ready Building Construction,The appropriate advisory
board(s)and BCD are directed to conduct code amendment of the state
building code to require that parking structures for all newly constructed
residential and commercial buildings arc ready to support the
installation of at least a level 2 EV charger by October 1,2022. BCD
may establish limited specific exemptions related to types of parking
lots,such as temporary parking lots.