Permit (4) CITY OF TIGARD MECHANICAL PERMIT
" I COMMUNITY DEVELOPMENT Permit#: MEC2023-00221
Date Issued: 4/19/2023
T j G AR.O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 1 S135CA00902
Jurisdiction: Tigard
Site address: 11359 SW GREENBURG RD
Project: Quail Court Apartments Subdivision: None Lot: None
Project Description: New mini split heat pumps.(1)in unit A and(1)in unit B.
Contractor: ROBBEN&SONS HEATING INC Owner: QUAIL COURT APARTMENTS LLC
2214 SE 8TH AVE 3570 SW RIVER PKWY#2307
PORTLAND, OR 97214 PORTLAND, OR 97239
PHONE: 503-233-5841 PHONE:
FAX: 503-238-8849
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 04/19/2023 $176.51
Class of Work: ALT Type of Const: VB Plan Review 04/19/2023 $44.13
Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 04/19/2023 $21.18
Stories: 1 Info Process/Archiving-Sm$0.50(up to 04/19/2023 $3.00
11x17)
Project Valuation: $4,000.00
Fuel Alr Handlers
Fuel Types: Electricity Units< 10000 cfm:
Gas Pressure: Units>10000 cfm: •
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump: 1
Appliances
Vent Fans: Vent Systems: Total $244.82
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by, the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
Issued By: Permittee Signature: A .r _
Ca .639.4175 by 7:00 a.m,for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.