Loading...
HomeMy WebLinkAboutPermit (2) CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT = COMMUNITY DEVELOPMENT Permit#: FPS2023-00032 Date Issued: 3/30/2023 T t G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112DA00700 Jurisdiction: Tigard Site address: 7000 SW REDWOOD LN Project: NVision Subdivision: PACIFIC CORPORATE CENTER Lot: 3 Project Description: Adding(2)new sprinkler heads and raising up to 16 heads to clear new lights. Contractor: WESTERN STATES FIRE PROTECTION Owner: PACIFIC REALTY ASSOCIATES LP 17500 SW 65TH AVE ATTN: N PIVEN LAKE OSWEGO, OR 97035 15350 SW SEQUOIA PKVVY#300 PORTLAND, OR 97224 PHONE: 503-657-5155 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-COM 03/30/2023 $145.24 12%State Surcharge-Building 03/30/2023 $17.43 Type of Use: COM Plan Review-Fire Life Safety-COM 03/30/2023 $58.10 Class of Work: ALT Type of Const: VB Occupancy Grp: B Height: 25 ft Stories: 1 Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Wet Standpipe Required: No Hazard: LT Density: 0.1 Design Area: 1500 K Factor: 5.6 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $220.77 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $6,800.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: /J );:i / �� n /J Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.