Plans BUP2020 -00254
SHEET NOTES
1. CONTRACTOR MAY STAGE WITHIN LIMITS OF DEMOLITION. 1
= o
/ / S ASMR REQUIRED IN THE SPECIFICATIONS.
RE
s^ss a^s a^ss a°ss s ss ass ss a �; —a ss s ss- a s� s ss ass \ e°ss ass ass ass a\Ss s ss s ys
^s
T — — — — — — — — — — lev- T — — — s"s 3. GENERAL DEMOLITION PERMIT SHALL BE SECURED BY THE
\\ `\ CONTRACTOR. - .
4. ALL TRADE LICENSES AND PERMITS NECESSARY FOR THE
/ / ■ � s 0 ■ Ill h PROCUREMENT AND COMPLETION OF THE WORK SHALL BE
/ / I is ] HB / \ I / SECURED BY THE CONTRACTOR PRIOR TO COMMENCING
A�RP \ I i�l / DEMOLITION.
/ 1
43 5. THE CONTRACTOR SHALL PRESERVE AND PROTECT FROM
DAMAGE ALL EXISTING RIGHT-OF-WAY SURVEY
[`"] — —I` 1�-B� -�"] \ I \ . \ / �� / / / MONUMENTATION DURING DEMOLITION. THE CONTRACTOR IS
o Go 01 IB E�/ _ _ - _ aD \ \ \ /� / // / / // RESPONSIBLE FOR COORDINATING AND PAYING FOR THE
REPLACEMENT BY A LICENSED SURVEYOR OF ANY DAMAGED
RD OR REMOVED MONUMENTS.
41
6. PROTECT ALL ITEMS ON ADJACENT PROPERTIES AND IN THE
/ F 43 - J \ I \ / I / !/ / RIGHT OF WAY INCLUDING BUT NOT LIMITED TO SIGNAL �1
EQUIPMENT, PARKING METERS, SIDEWALKS, STREET TREES, I I
STREET LIGHTS, CURBS, PAVEMENT AND SIGNS. CONTRACTOR
SHALL BE RESPONSIBLE FOR RESTORING ANY DAMAGED ITEMS
TO ORIGINAL CONDITION.
N 7. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, AND OTHER
FACILITIES IMMEDIATELY ADJACENT TO EXCAVATIONS FROM Dull Olson Weekes - IBI Group
DAMAGES CAUSED BY SETTLEMENT, LATERAL MOVEMENT, Architects, Inc.
41 / / �� I < / / UNDERMINING, WASHOUT AND OTHER HAZARDS.
IWl
42 0 41 �� I - // 8. SAWCUT STRAIGHT LINES IN SIDEWALK, AS NECESSARY.
i 907 SW Stark Street Portland OR 97205 USA
9. CONTRACTOR IS RESPONSIBLE TO CONTROL DUST AND MUD tel 503 226 6950 fax 503 273 9192
1 I HB / / / / / www.dowa-lbi rou com www.ibi rou com
I ° DURING THE DEMOLITION PERIOD, AND DURING 9 p' 9 p'
RD / / / / // / TRANSPORTATION OF DEMOLITION DEBRIS. ALL STREET
1 , / / / / // / P / SURFACES OUTSIDE THE CONSTRUCTION ZONE MUST BE KEPT
ri' \ DISTRICT PRE-K BUILDING `\ _ // • CLEAN.
42 / / / % / 10. ALL EXPOSED PORTIONS OF UNDERGROUND UTILITIES TO BE
ABANDONED SHALL BE PLUGGED PER DETAIL 4/C6.1
,/
PLAY STRUCrt1REAREA ' I �I / 11. SEE ARCHITECTURAL DRAWINGS FOR ALL PHASING TIME REDPROFF
RD / / / / / I I / FRAMES AND AREAS OF WORK. �,t� SSS
/ oCO a� / / / / ) / 12. COORDINATE LIMITS OF PAVEMENT AND CONCRETE WALK 7701P 9 l
REMOVAL WITH PROPOSED IMPROVEMENTS. ��.�- --
/ I 20 / / / �l / DIGITALLY SIGNED
_ I I 42 43 �/ // / ' / ,� // 13. SEE C8-SERIES SHEETS FOR DEMOLITION IN RIGHT OF WAY.RD
22 x
j1110GONO
\ / X DEMOLITION KEY NOTES EXPIRATION DATE: 1'1/31121
25
20 SAWCUT LINE
l / . HB \ , • % ' •_ \\\ // // // / / \ - - / // /' // /" 21 REMOVE CONCRETE SIDEWALK/PAVING
�D— Iw] / / . A 20
IwI [w / / / / / ' A :o OP /�/ /� // /' / 22 REMOVE ASPHALT ADA RAMP.
\ 26 / \ / / / / / �:' % / / / / 23 REMOVE BUILDING AND FOUNDATION. SEE ARCH SHEETS FOR
\/ / / / / / r n . �/ / / /
\ / ' ..' :a ,' % . \ �' / / / ., •� .": 4: MORE INFORMATION.
_ n / / , .• / / ,
/
ICV
HB / / / / ' / 24 REMOVE REMAINING PORTION OF EXISTING PLAY STRUCTURE
RD AND WOOD CHIP SURFACING
0 25 ' ` , • e'. / / / 27 25 REMOVE CATCH BASIN
co /// /� // / � ,; . /
/ / I . 43 / \ / // /// ;: 21 a / / / // ���• _ / // // / / / 26 REMOVE EXISTING STORM LINE
- 28 27 REMOVE EXISTING BASKETBALL COURT, SURFACING, AND
1 0 RD //// / / �• d /. HOOPS TO EXPOSE SUITABLE SUBGRADE. }�
— F FP / FP 1 P FPS \ Fr7 \ I CO / / /HB/ / ,: . 4. / / / /� /
28 •. . / d+loop / _
/ o / /.:. o HOOP . 28 REMOVE ROOF STRUCTURE. SEE ARCH SHEETS FOR MORE
RD / / / / / / a • / / / . / / / INFORMATION. L
�+
W W W W 23 / / / / / :e4 : t • / // // // // 29 REMOVE EXISTING WATER UNE (I�
/ V E .• • • / / / / / , • d • A /
a 4. 4D / / / / / . / / / // Q
APPROX BLDG ° , •29 // / // / // // / / // // / // // PROTECTION KEY NOTES -
- AREA— 7160 SF "B'
/ 40 PROTECT UNDERGROUND WATER SERVICE. Q
�In . �Wj 41 / / / / / / 41 PROTECT UNDERGROUND UTILITIES C �� N
41 • . / // // // / // O V
42 PROTECT EXISTING BUILDING AND ROOF. SEE ARCH PLANS (�
II R/ / " ' a , '• / / // // // ". •. . / / / / / / / / FOR INTERIOR REMODEL INFORMATION. "' �
1 \ / / I - :. . ` d• � / / / / I Of
b HOOP / / / . / / / / /
\ \ / I •. / / / / / / / / // /' / / / /' 43 PROTECT EXISTING PAVING O
CD CU c
STR�ru E // /' , ' i SHEET LEGEND
� / / / / I / AREA co
24 / , // // / / / PROPERTY LINE
• • • ' I `\ •.: a: a. .Q4 / jv ' /' / - / M I I M DEMOLITION/WORK LIMITS (SHOWN G O O
111\ a a / / / / / / ' / / / / ' / OFFSET FOR CLARITY) ti
•i 4 21 / / / / / i / / / / / / - - - - - - �-
l� . Iv • a� .., / / / / . / / // / SAWCUT LINEco m
\ pF \ / / / REMOVE OR ABANDON UTILITY LINE IN p M M
`— \ `V �gjFR \\\\ . '� . .: • / // / // / / / / // / / / / // / PLACE .� CO LO LLO
/
- EX. CONTOUR MINOR
C7 y� / / // / /' / / . / / // -50 - - - EX. CONTOUR MAJOR
CI� 41 — — ` 259LU
off
�h
/ /
O ' / ,' ,' ,'1' �� ' �' ,' /' / /' / / VALIDITY OF PEF,".1!T 111 SW Fifth Ave., Suite 2500
/ / / / / Portland,OR 97204
� / ,' // /' ' Lj1' / / / ���.. THE ISSUANCE OF A PFGthr.:T
TEMPLETON ELEMENTARY SCHOOL / 1' / ' / / 0: 503.227.3251
/ , // // // / / ['y / i / . / / / / / BASED ON CONSTRUCTION F: 503.274.4681
W / / / / '/ / F. Q) www.kipff.com
/ / OCUMENTS AND OTH_R
U _ // // // // // ✓� / // // / DATA SHALL NOT PREV rAT =
U / � / / / THE CODE OFFICIAL F;;Oi.9 C
U' /� // / / ' / / I REQUIRING THE CORRLCTiC.'-
�� / / / / (koJ ./ / / I I Q —
/ ,/ ,/ // OF ERRORS. OSSCLU
� J
i / U.
CV ./
C) ' / // / � // // // / ' / / // I C iii
r
Cfl r� a
F k 0 C
O
d It e y p l a n
D
Q
0 phase DEMO PERMIT
CITY OF TIGARIDL
REVIEWED FOR CODE COMPLIANCE
a Approvea"- f I date 12/4120
OTC: j
- Permit #:�nap�� reVISI0f1S
Q
c�\1 Address: OLt C �
M
O
O
UItC
cfl
Byi Date:
CD
CD
tl
U
co
H
City of Tigard Erosion Control
To Schedule Inspections:
r0 ect # 16055
off Call (503) 639:4175 p 1
d Initial inspection:
J Prior to Icourq Inspection
2> PdatofFWbAd�ft Iisnspection DEMOLITION PLAN
¢U
o-'
L0
o� SCALE 1 INCH = 20 FEET
1 . 1
N .
N J 20 0 20 40
�LL
S 8"55 f— 8"55 SS 8"S / 8'SS ' 8'SS 8"SS / 8"55 8"SS 8 S� � �8"SS B"55 8"SS/ 8"55 8"SS 8"55 8"55 8"SS 8"SS 8 S i
- - - - - t - - 3- - � —� =J �I - - � - - — - - - T - - - - — �\ - - - - - - — - - - - aSs SHEET NOTES
1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC)
/// // / ' / T ■ li I / i �\ / _ - - - - - PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT
D o (I . h / / ROAD OR DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF
HB `R ` \ \ / 1 \ / �/ / ROADS, RESTRICTORS, CHANNELS, RETENTION FACILITIES, I
UTILITIES, ETC.).
2. THE IMPLEMENTATION OF MESE ESC PLANS AND THE
Iw] Imo- - I _"W1 / / CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING
' 0 06018 19 E / \ 1� \ \ \ / / / / / OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
/ �/ CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND
/ - RD RD APPROVED AND PERMANENT VEGETATION/LANDSCAPING IS
/ - H81 — — — — — \ ` /I ��1 \ l/ I l ' ESTABLISHED.
3. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE J
F \ \ 1 / / l CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND
// \ / 7 GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE
THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER
THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE
WATER STANDARDS.
^( 4. DISCHARGE POINT FOR THE SITE DURING EXISTING CONDITIONS
IS AT THE EAST EDGE OF THE PROPERTY. r�
00
61
I I — / / / I SHEET LEGEND
yo'� HB / / / I / / i
/ // / - - / - - PROPERTY LINE Dull Olson Weekes - IBI Group
RD
Architects, Inc.
EXTENT OF WORK
DISTRICT PRE-K BUILDING
49- - - - - EX. CONTOUR MINOR 907 SW Stark Street Portland OR 97205 USA
tel 503 226 6950 fax 503 273 9192
\` I \\ u • II I // // '/ /
EX. CONTOUR MAJOR www.dowa-ibi9roup com www.ibigroup.com
PLAY STRUCTDRE AREA
U _ RD _ / / / I \ I / n SEDIMENT CONTROL FENCE.
11 / ca (SHOWN OFFSET FOR CLARITY). 1.3
I I I 0
P
INLET PROTECTION 2
�
� SIN F
y9
\5 �O
79701 PE
SURFACE FLOW DIRECT10N
DIGITALLY sIG -
\ a
I I \ lc \ /' / ,' OREGON
l\ I I HB
[w] , d' d . . . / / / _ _ � / 1\ // // / .a9
/ ' . " . . ° d . / / . `� U/ HARKD��
• ; • " \ // // / // // .• ', d. O HOOP I \ /!. //� // STABILIZED CONSTRUCTION 3
\ \ t^l 1.., / •• . :. .\ / / / / / • ''•: ; •. - I % / \ / ' / 0 0 o ENTRANCE EXPIRATION DATE: 12137/21
lCV
RD RD 4
CO `/// •' d.• •14 _ // .�
RD
4 .
F FP / FP P FF \ - - F / 1 ` / CO ,e'._ . .d• / /e e' OHOOP6 HOOP
" / / / • // / // /
RD I / / / / / TAGING AND
W W W W / / e • •. / / / •. : , . : ; MATERIAL
/ -� / f / / /� / a // // // / // • ed STORAGE AREA
/ / ! d . /
"HBe .. g • , / / // / / // . .e _ a 4 i // // // / / / // /� •L
RD
:d. /
y, • CN
41
1",;. r a I '•". �. / / / / / PLA O N
STRU URE J / / / / / / r�
/ / , .• e, • '/ � • . meg: :. ��Q- / / / / I / AREA / / / - 7 / / / / OJ Of
r/1
e o 0 0 / I \ •♦ • .• �. '. • d' Q / / / / / / / / / / /' / \ // / / ! / / _/ ice_ -2
co CU
4.
\ 1.
\,. \\
\\n} .e / /
e•.. .a a // / / // // // ' /// '� /' / ' / / /// // •= QO ti
`p c) CD
c i
/
o TEMPLETON ELEMENTARY SCHOOL / / '/ // ' rvry
`;ti
LU
Q 111 SW Fifth Ave., Suite 2500
Portland,OR 97204
O: 503.227.3251
F: 503.274.4681
LV
www.koff.com
O
U / / / / / 1
O // // / / / // // / / / !V /
wo
CD
LI
-I . I N k e y p l a n
tl
phase DEMO PERMIT
co1
date 12/4/20
I /
revisions
d) - - - - - - r �
C)
/ - -
\ I /
F-
0 / I / / • `\ I I / /
a % project# 16055
/ \ / EROSION & SEDIMENT
10
z a �\
/
CONTROL PLAN
, I
FIRELWE
660
C1 m2
NU / // O .,; ' II I ; SCALE 1 INCH = 20 FEET
I
N� 112
�� b o b / l V �/ A I - 20 0 20 40
- 1�
ANGLE BOTH ENDS OF
SEDIMENT FENCE TO
ASSURE SOIL IS TRAPPED
INTERLOCKED 2"X2" POSTS
AND ATTACH (SEE TURNED
ENDS CONNECTION)
PLAN VIEW FILTER FABRIC
FILTER FABRIC I
STITCHED 2"x2" WOOD J
TOGETHER TO POST OR STEEL
FORM POST
POCKET FENCE POST
FLOW
36" MIN.
EXPOSURE r�
EXISTING GROUND
ILTERPOST I I
WHEEL WASH AREA (IF FABRIC
REQUIRED) 50' MIN. DETAIL FABRIC
POST POCKET
Dull Olson Weekes - IBI Group
F 6' MAX. Architects, Inc.
SILT FENCE FRONT VIEW
(SEE DETAIL)
I
j 907 SW Stark Street Portland OR 97205 USA
JO FILTER tel 503 226 6950 fax 503 273 9192
4" — 6" " FABRIC www.dowa-ibigroup.com www.ibigroup.com
QUARRY
SPALLS R-20' ® 36'
BACKFILL
•J � TRENCH MIN.
RAMP — FULL ''� \\ 6"
20 MIN. WIDTH OF ENTRY TURNED ENDS AMIN.
GEOTEXTILE END CONNECTIONS
PROPERTY , e�� / 24" �ED PROF,
LINE \\/\\ MIN. c,�`' GINN EF �y
STANDARD CURB / //� 79701 PE 9 9l
GRAVEL CONSTRUCTION ENTRANCE MIN. '' DIGITALLYSIGNED
OREGON
SIDE VIEW , 'v'. IQ to°� o
GRAVEL CONSTRUCTION STANDARD GAP FOR DRAINAGE NOTES: 9U! MARK 0�0�
ENTRANCE (MIN. 12" TYP.) CURB WOODEN RAMP 1. THE FILTER FABRIC SHALL BE (36" MIN. WIDTH) PURCHASED IN A CONTINUOUS
(2%4", 2"x8", ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN IF EXPIRATION DATE: 12131121
GEOTEXTILE 2"x12") JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT
FABRIC A SUPPORT POST, WITH A MINIMUM 6—INCH OVERLAP, AND BOTH ENDS SECURELY
PAVED STREET FASTENED TO THE POST, OR OVERLAP 2"x2" POSTS AND ATTACH AS SHOWN ON
DETAIL SHEET.
j/�/�/ /j �\ \,\/ / ;;? _ :;^i:'r• ri :; 2. THE FILTER FABRIC FENCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS
WHERE FEASIBLE. THE FENCE POSTS SHALL BE SPACED A MAXIMUM OF 6—FEET
APART AND DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24—INCHES.
CONSTRUCTION ENTRANCE WOODEN CURB RAMP 3. THE FILTER FABRIC SHALL HAVE A MINIMUM VERTICAL BURIAL OF 6—INCHES. ALL
EXCAVATED MATERIAL FROM FILTER FABRIC FENCE INSTALLATION, SHALL BE
GRAVEL SIDEWALK SUBGRADE BACKFILLED AND COMPACTED, ALONG THE ENTIRE DISTURBED AREA.
(MIN. 4' TYP.) 4. STANDARD OR HEAVY DUTY FILTER FABRIC SHALL HAVE MANUFACTURED STITCHED
GEOTEXTILE STANDARD LOOPS FOR 2"x2" POST INSTALLATION. STITCHED LOOPS WITH STAKES SHALL BE
FABRIC CURB PAVED STREET INSTALLED ON THE DOWN—HILL SIDE OF THE SLOPED AREA.
5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR
' / /�/�//�//�/�/� ,...: ....:.:: ::•` :.:::7::;• :::: ''::i.' USEFUL PURPOSE, BUT NOT BEFORE THE UP—SLOPE AREA HAS BEEN }e
PERMANENTLY PROTECTED AND STABILIZED. U
6. FILTER FABRIC FENCES SHALL BE INSPECTED BY CONTRACTOR IMMEDIATELY AFTER "L
SIDEWALK SUB-GRADE EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY }�
REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. Cn
STABILIZED CONSTRUCTION ENTRANCE SEDIMENT FENCE M
3 SCALE. NTS SCALE: NTS O
O
p U N
O `1'
ti
U rn
o
Ca co
0)
2 EACH FOAM ~
DUMP STRAP >
- aCD 'KI-
CD ti
EXPANSION RESTRAINT L M M
(Y4" NYLON ROPE,
2' FLAT WASHERS) �_ C:)
t0 CD
O DUMP STRAP
D
1" REBAR FOR BAG BAG DETAIL
REMOVAL FROM INLET
ccW
0111 SW Fifth Ave.,Suite 2500
O Portland,OR 97204
O: 503.227.3251
ILL REGULAR FLOW Fwww3kPfc 81
w SILTSACK® DUMP STRAP
O
U
�Fp
CN
rn
M
CD
o p`N
�FNG�\C k e y p l a n
44
phase DEMO PERMIT
a
4.
e.
c • .. '
6
°
a NOIE date 12/4/20
1. DO NOT USE HIGH revisions
FLOW INSERT BAGS.
rn
CV
M
O
INLET SEDIMENT PROTECTION
to SCALE: NTS
0
GV
'a
U
F—
U
o project# 16055
Of
EROSION & SEDIMENT
CONTROL DETAILS
C1 m3
¢U
M�
O�
o�
o�
Cil U
O:;�
C jW
NJ
LL
decor
architecture . inc
935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
1 2 3 4 5 6 8 9 10 11 �� 2919 f�
F 16 DAVID T. HYMAN
Z '�
w
U
LU
j PORTLAND, GON
4V OF
U
A ;' \ TIGARD-TUALATIN SCHOOL
DISTRICT
\ ' \ TEMPLETON PRE-K,CONFERENCE CENTER,AND
- DISTRICT SERVICES
9500 SW Murdock St.
Tigard, OR 97224
,
LID
kSRE-K i
o
' R
CONFERENCE CENTER
-------------------- O
PRE-K
0O \ / °
0 0
\ _ \ PLAN KEY:
M
O
\ � L
\ 1 OUT OOORp/L9 Nc
12 13
I I.
I I
I
J I
4
Issue Revision Date_
DEMO BUILDING AND SLAB 100% CONSTRUCTION DOCUMENTS
UNDER SEPARATE CONTRACT/ '
I
Q4
, 0
I J
OVERALL DEMO FLOOR
PLAN
Scale 1/16" = 1'-0"
N Date 09/11/2020
1
OVERALL DEMO FLOOR PLAN ___ -- ---- - _— --- Sheet No. AD 1 01
GENERAL NOTES
1. PATCH, REPAIR, AND FINISH TO MATCH
ADJACENT EXISTING SURFACES WHERE d e c a
AFFECTED BY THE WORK.
2. REFER STRUCTURAL, MECHANICAL, PLUMBING, architecture . i n c
ELECTRICAL, LIGHTING,TECHNOLOGY, AND FOOS
SERVICE FOR ADDITIONAL DEMOLITION. 935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
3. WHERE NEW CEILINGS AND FLOOR FINISHES
ARE INDICATED ON THE REFLECTED CEILING AND
FLOOR FINISH PLANS, DEMO EXISTING CEILINGS
AND FLOOR FINISHES. t1
4. REMOVE ALL EXISTING LOUVER BLINDS. �� P919
1 2 3 4 5 6 8 9 10 11 16 DAVID T. YMAN
z
w \
DEMO AREA th PORTLAND, GON
LU LL
F
p \ 7�p� \ DEMO TO ACCOMMODATE
v p (N)TUBULAR SKYLIGHTS,
A TYP
UALATIN SCHOOL
DISTRICT
\ \ 17 TEMPLETON PRE-K,CONFERENCE CENTER,AND
DISTRICT SERVICES
\ 9500 SW Murdock St.
� � \ Tigard, OR 97224
' \ T
DEMO(E) ROOFTOP MECHANICAL UNITS
I I I I G
\ S
D 7 6RE-K ,' REMOVE(E) ROOFING SYSTEM \
' ° \ AND RELATED FLASHINGS
o
0
CONFERENCE CENTER i
J---------------------------- rte-- --------, ' \
PRE-K 0 0 0 `` 5 27 O ' \ Q
` ,
.
\ o O ° \ \ N
/ INSPECT(E)WOOD ROOF FRAMING AND
/ \ SOFFIT BOARDS FOR WATER DAMAGE OR PLAN KEY:
DRYROT AND REMOVE AS REQUIRED
A622
L
RSA,
(E) PORCH BUILDING ROOF TO BE REINFORCED AND \ O�'T00
13 / CUT BACK ALONG GRID LINE 1.1. SEE STRUCT. d?p
12 (E) EXTERIOR WALL TO BE / COORDINATE W/OWNER AND ADJACENT DEMOLITION. 1 �Y
DEMOLISHED / I
(E)WALL ASSEMBLY OUTBOARD OF /
PLYWOOD SHEATHING TO BE REMOVED DEMO TO ACCOMMODATE
/ (N)U13ULAR SKYLIGHTS, /
TYP
Issue Revision Date
/
100% CONSTRUCTION DOCUMENTS
7s / DEMO ROOF
Q /
/ (UNDER SEPARATE CONTRACT)
4Z-
/ 0
-/ p /
/
I /
I /
I /
I /
I /
/
I /
I /
OVERALL DEMO ROOF
PLAN
/ Scale As indicated
N
Date 09/11/2020
OVERALL DEMO ROOF LEVEL �
1/16" = 1'-0" Sheet No. A D 10 2
1
GENERAL NOTES
1. PATCH, REPAIR,AND FINISH TO MATCH
ADJACENT EXISTING SURFACES WHERE d e c a
AFFECTED BY THE WORK.
2. REFER STRUCTURAL, MECHANICAL, PLUMBING, architecture . i n c
ELECTRICAL, LIGHTING,TECHNOLOGY,AND FOOS
SERVICE FOR ADDITIONAL DEMOLITION. 935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-lnc.com
3. WHERE NEW CEILINGS AND FLOOR FINISHES
ARE INDICATED ON THE REFLECTED CEILING AND
FLOOR FINISH PLANS, DEMO EXISTING CEILINGS ��� A�C�
AND FLOOR FINISHES. 7i
4. REMOVE ALL EXISTING LOUVER BLINDS. 2919 1j
DAVID T. YMAN C__�P
w 15 3
000< tJl PORTLAND, CON
1>00
1>00
�'�/pp OF
�/ — — _ — — — P -K
t I ' 71
i / REMOVE(E)CONCRETE SLAB AS TIGARD-TUALATIN SCHOOL
- -- -- --- _______ \I REQUIRED TO INSTALL(N) PLUMBING
I I REFER PLUMBING DRAWINGS DISTRICT
/ INSTALL(N)SLAB TO MATCH
4 \ ADJACENT(E) TEMPLETON PRE-K,CONFERENCE CENTER,AND
DISTRICT SERVICES
REMOVE AND SALVAGE K 9500 SW Murdock St.
(E) CABINETS AND SINKS Tigard, OR 97224
REMOVE(E)WALL FINISH REMOVE (E) WALLS AND DOORS
REMOVE(E EM VE(E)CASEWORK AS REQUIRED TO INSTALL
PLUMBING FIXTURE ND PLUMBING (N)SHEAR WALL
PLYWOOD AND FRAMING
PRE-K REFER STRUCTURAL
REMOVE (E)STOREFRONT DOOR /
L �
j \ CUT(N) OPENING INTO(E) REMOVE(E)WALLS
\ CONCRETE WALL AND DOORS
(E) ELEC PANEL \\\ REMOVE(E)WATER
TO REMAIN HEATER /
REMOVE(E)
TACKBOARD
REMOVE(E)WALLS (E) POST TO
AND DOORS REMAIN �` I, \ \ \
REMOVE(E)CABINET
REMOVE(E) CONCRETE SLAB AS
REQUIRED TO INSTALL(N) PLUMBING REMOVE(E) \ REMOVE(E)
REFER PLUMBING DRAWINGS PLUMFIXTURES ` �y'.'��/ �\ REMOVE(E) CONCRETE SLAB AND (E) WAINSCOTING, TYP
BING
INSTALL(N)SLAB TO MATCH �' CONCRETE TUNNEL WALLS BELOLW \Y,
ADJACENT H / �� / FOR (N) RAMP / REMOVE(E)FIRE
REMOVE ALL GLAZING EXTINGUISHER
WINDOWS
/ CUPOLAABOVEIN / \ \ CABINET
0 L // \ / /') 11 /
REMOVE STUD WALL
REMOVE (E) REMOVE(E) REMOVE(E)WALL FINISH FURRING AT STL COLUMN
CABINETS AND SINK WATER FOUNTAIN AS REQUIRED TO INSTALL �J
(N) SHEAR WALL /
(E) REFRIGERATORS PLYWOOD AND FRAMING O°
TO BE RELOCATED \ REFER STRUCTURAL\ REMOVE(E)
REMOVE PORTION OF V REMOVE (E) REMOVE (E)WALLS CABINETS
(E)WALL TACKBOARD AND DOORS REMOVE AND SALVAGE
REMOVE(E)WALL FINISH (E)CABINETS AND SINKS
AS REQUIRED TO INSTALL
r (N) SHEAR WALL
___ RELOCATE(E)MARKERBOARD /
- REMOVE (E)WALL PLYWOOD AND FRAMING -
AND DOORS j REFER STRUCTURAL/
REMOVE(E)CONCRETE SLAB AS // �' REMOVE (E) CONCRETE j ( ) PLAN KEY:
REQUIRED TO INSTALL(N) PLUMBING
�' `
REQUIRED REMOVE
INSTALL(N) PLUMBING
SLAB
REFER PLUMBING DRAWINGS REFER PLUMBING DRAWINGS \
INSTALL(N)SLAB TO MATCH REMOVE(E) REMOVE ALL(E) INSTALL(N)SLAB TO MATCH E CASEWORK TO
ADJACENT(E) TACKBOARD ACOUSTICAL PANELS / ( )
REMOVE(E THIS ROOM, TYP. ADJACENT(E) REMAIN \
CABINETS
REMOVE(E)WALL FINISH REMOVE AND SALVAGE
AS REQUIRED TO INSTALL (E)CABINETS AND SINKS
\ / �
\ SHEAR WALL
(N)OPENING �� PIL)YWOOD AND FRAMING \
\ INTO(E WALL �l \ REFER STRUCTURAL
I _ /
REMOVE(E)WALLS AND DOORS/ / L2
/ \
_ _ _ REMOVEAND / \
SALVAGE (E)
CABINETS /\ '` \ \ / // REMOVE AND SALVAGE
REMOVE (E) WALL
AND DOOR I� AND SINK �� \ \ / (E) CABINETS AND SINKS
REMOVE (E) ' 6 REMOVE (E) FIRE \\ \ / /// \ 1SSlle Revision Date
TACKBOARD ANDA622 A622 EXTINGUISHER X� /
MARKERBOARD \ CABINET 100% CONSTRUCTION DOCUMENTS
/ REMOVE(E)WALL FINISH J
AS REQUIRED TO INSTALL
o — — — /' (N)SHEAR WALL
/ PLYWOOD AND FRAMING
REFER STRUCTURAL
REMOVE(E)CONCRETE SLAB AS REMOVE (E) EXTERIOR WALL
REQUIRED TO INSTALL(N) PLUMBING AND WINDOW SYSTEM (J( REMOVE(E)
REFER PLUMBING DRAWINGS 13 DOOR AND RELITE
INSTALL(N) SLAB TO MATCH REMOVE (E) METAL PANEL
12 ADJACENT(E) AND PARAPET COPING
REMOVE (E) LOWER CABINETS REMOVE(E) CONCRETE
(E) UPPER CABINETS TO REMAIN FOOTING AS REQUIRED TO
ISNTALL N)CANOPY
FOOTING
REMOVE(E)SIDEWALK AS
REQUIRED TO INSTALL(N)
SIDEWALK
/ SECTOR DEMO FLOOR
/ PLAN - PRE-K
G
14 Scale AS indicated
N
Date 09/11/2020
DEMO FLOOR PLAN - PRE-K Sheet No. A D 151
GENERAL NOTES
1. PATCH, REPAIR,AND FINISH TO MATCH
ADJACENT EXISTING SURFACES WHERE d e c a
AFFECTED BY THE WORK.
2. REFER STRUCTURAL, MECHANICAL, PLUMBING, architecture . 1 n c
ELECTRICAL, LIGHTING,TECHNOLOGY,AND FOOS
SERVICE FOR ADDITIONAL DEMOLITION. 935 SE Alder Street : Portland Oregon 97214
Sal 503 239 1987 faz 503 239 6558 deca-inc.com
3. WHERE NEW CEILINGS AND FLOOR FINISHES
ARE INDICATED ON THE REFLECTED CEILING AND
FLOOR FINISH PLANS, DEMO EXISTING CEILINGS
1 2 3 4 5 6 7 AND FLOOR FINISHES.
17 3 1/2" 15'x" 151-81. 18'3" 18'd" 27'-1" 4. REMOVE ALL EXISTING LOUVER BLINDS. ��� 2919 �f>
Z _ _ _ _ _ _ _ DAVID T. YUAN -2
w
w
a t11 PORTLAND, GON
z
LUz
I I I I I z OF
o
I I I I I I TIGARD-TUALATIN SCHOOL
- DISTRICT
r - - - - REMOVE(E) DOOR AND FRAME TEMPLETON PRE-K,CONFERENCE CENTER,AND
- - - - - - - - - - - - - --
- - - - - -
- - - - - - - - - - - - - - - - - - - IP - �I- -
_ - - - DISTRICT SERVICES
A - — — — —
I 9500 SW Murdock St.
REMOVE(E)CONCRETE SLAB AS Tigard, OR 97224
REQUIRED TO INSTALL(N)PLUMBING „
REFER PLUMBING DRAWINGS
INSTALL(N)SLAB TO MATCH o r i
ADJACENT(E)
N I
ho REMOVE EXISTING OVEN
AND HOOD I 1 °�
-
- - - -
REMOVE(E)COOLER ] I L I I I �� REMOVE (E) DOOR AND FRAME
7
IF / SERVW I I I /
NAN
I
REMOVE (E) DOOR UP
REMOVE(E) REMOVE (E)HOT I I
DOORS AND FRAME, WELL TABLE REMOVE (E) DRINKING FOUNTAIN
MECHANICAL GRILLE AND REMOVE (E)
PORTION OF(E)CONCRETE PLASTIC LAMINATE SILL
WALL BETWEEN OPENINGS AT PASS-THROUGH
WINDOW
I I I I
i
i
i
� ' I
(7 I
q I I l
� I I
M REMOVE ALL(E)ACOUSTIC WALL PANELS
AND E ALL WALL ITEMS
I
I I
I REMOVE ALL(E)TACKBOARD I
I I
� I
� I
� I
i
- D — — — — — — — — — — — — — PLAN KEY:
I I I
17,
I
I? REMOVE (E) DOOR UP
AND FRAME
REMOVE (E) FIRE
EXTINGUISHER CABINET
I
1-1
E — --
I I - I I
REMOVE ALL(E)WALL I REMOVE(E)CONCRETE I (E) DRINKING
MURALS AND RELATED PILASTER AND PORTION OF FOUNTAIN TO REMAIN
ITEMS IN HALL (E)WALL FOR(N) DOOR
CONFERENCE CENTER OPENING
T
�) - 1 L D Issue Revision Date
100% CONSTRUCTION DOCUMENTS
REMOVE(E)WALLS, DOORS, / /�
AND PLUMBING FIXTURE
/ A
ELOCATE(E)TRANSFORME
xxxxxxxxxx
EMOVE(E)CONCRETE SLAB A
EQUIRED TO INSTALL(N)PLUMBIN
EFER PLUMBING DRAWING
INSTALL(N SLAB TO MATC
,KADJACENT E
E ELEC PANELS TO REMAI
SECTOR DEMO FLOOR
PLAN - CONFERENCE
CENTER
Scale As indicated
N
Date 09/11/2020
- DEMO FLOOR PLAN - CONFERENCE CENTER � Sheet No. A D 15 2
GENERAL NOTES
I
1. PATCH, REPAIR,AND FINISH TO MATCH
ADJACENT EXISTING SURFACES WHERE d e c a
AFFECTED BY THE WORK.
2. REFER STRUCTURAL, MECHANICAL, PLUMBING, a r c h i t e c t u r e . i n c
ELECTRICAL, LIGHTING,TECHNOLOGY,AND FOOS
SERVICE FOR ADDITIONAL DEMOLITION. 935 SE Alder Street : Portland Oregon 97214
Sol 503 239 1987 tax 503 239 6558 deca-inc.com
3. WHERE NEW CEILINGS AND FLOOR FINISHES
ARE INDICATED ON THE REFLECTED CEILING AND
FLOOR FINISH PLANS, DEMO EXISTING CEILINGS
AND FLOOR FINISHES. V1�I� tl
4. REMOVE ALL EXISTING LOUVER BLINDS. �� 2919 f�
DAVID T. Y01\1 7
2
t, PORTLAND, CON
�qT�
OF
TIGARD-TUALATIN SCHOOL
DISTRICT
TEMPLETON PRE-K,CONFERENCE CENTER,AND
DISTRICT SERVICES
9500 SW Murdock St.
6 7 8 9 10 11 Tigard, OR 97224
27'-1" 16-5118" 27'-9" 26-115/8" 27'-8"
I I
WOMENS
RESTROOM REMOVE ALL EXISTING PLUMBING
F 308 TT FIXTURES AND PARTITIONS
w
w �
U
Z
I LL I H3ALL ® ®07 I I I
MENS L(
RESTROOM
309
q
>0<)<l REMOVE(E) DRINKING
FOUNTAINS
REMOVE(E)CONCRETE FLOOR SLAB REMOVE(E)CLIMBING ROPES AND LOCKBOXES
r AS REQUIRED TO INSTALL(N) REMOVE (E)VERTICAL MOUNTING RAILS
iv >00< WHEELCHAIR LIFT
REMOVE(E) RAILING, CONCRETE REMOVE (E) PEG CLIMBING BOARDS
>00 SLAB,AND CONCRETE CURB FOR(N)
>00 WHEELCHAIR LIFT
IFI
FLOOR AND BASE TO \
— — — — — _REMAIN AS IS —� —
LAI
- GYM
318
PLAN KEY:
_ REMOVE (E) DOOR
AND FRAME REMOVE ALL(E) CARPET AND
MOUNTING TRIM FROM WALLS
REMOVE (E) TACKBOARD
REMOVE ALL (E)WALL PADDING
4 I I -
F_ REMOVE (E) SCOREBOARD
REMOVE (E)
DOOR AND
FRAME
i
i
(E)WHEELCHAIR LIFTTOREMAIN
REMOVE(E)DOOR REMOVE (E) SPEAKER, TYP \
AND FRAME �
" GYM
_ _ _ _ _ _ _ _ _ R Issue Revision Date
D — — — — — P _K�RE -
I 100% CONSTRUCTION DOCUMENTS
g �
i
i
SECTOR DEMO FLOOR
PLAN - LOWER
CONFERENCE CENTER
AND GYM
Scale As indicated
N Date 09/11/2020
DEMO FLOOR PLAN - LOWER CONFERENCE CENTER AND GYM Sheet No. A D 15 3
1 1/8" = 1'-0"
16 17
I
GENERAL NOTES •
1. PATCH, REPAIR, AND FINISH TO MATCH
ADJACENT EXISTING SURFACES WHERE d e c a
REMOVE(E) DOORS&FRAME AFFECTED BY THE WORK.
2. REFER STRUCTURAL, MECHANICAL, PLUMBING,
architecture . inc
ELECTRICAL, LIGHTING, TECHNOLOGY,AND FOOS
SERVICE FOR ADDITIONAL DEMOLITION. 935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
REMOVE(E) DOORS AND FRAMES, TYP. 3. WHERE NEW CEILINGS AND FLOOR FINISHES
ARE INDICATED ON THE REFLECTED CEILING AND
REMOVE (E)CABINETS AND PLUMBING FIXTURES _ FLOOR FINISH PLANS, DEMO EXISTING CEILINGS pp
4.NREMOVE ALLEXISTINGLOUVER BLINDS. \� 2919��C�f.,,
REMOVE(E) DOORS& FRAME
DAVID T. YMAN
3
cf1, PDRTLAND, CON��
O /
0
REMOVE ALL(E)WINDOWS AT 0
— — — PORCH BUILDING, TYP.
— � TIGARD-TUALATIN SCHOOL
DISTRICT
TEMPLETON PRE-K, CONFERENCE CENTER,AND
DISTRICT SERVICES
9500 SW Murdock St.
Tigard, OR 97224
I I
REMOVE ALL(E) PLUMBING
FIXTURES, PARTITIONS,AND WALLS
— — — — �J
REMOVE AND SALVAGE REMOVE(E)DOORS
(E)CABINET AND FRAMES
�I I
— 7-
O
� I �
REMOVE(E)CABINET AND
\ PLUMBING FIXTURES � '�� I I� �
_____G� REMOVE (E) DOORS
REMOVE(E)WALLS AND DOORS d AND FRAMES
_REMOVE AND SALVAGE-
(E)CABINET
PLAN KEY:
I I
I I
REMOVE (E) PLUMBING
FIXTURE AND COUNTERTOP
— —
oIssue Revision Date
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 100% CONSTRUCTION DOCUMENTS
i
i
i
_ _
- - - - o-
_ _ _ _ _
REMOVE (E)
CABINETS
REMOVE PORTION
OF(E)WALL
REMOVE (E) EXTERIOR SECTOR DEMO FLOOR
CONCRETE SIDEWALK AS p
EDGE (E)CONCRETE SIDEWALK AND ROOF REQUIRED TO INSTALL(N) PLAN - PORCH
STRUCTURE ABOVE WHERE SOUTH PORCH SIDEWALK
REMOVED REFERLANDSCAPE
- - -
- - - - - o- ).1 BUILDING
— t--C2 Scale As indicated
N Date 09/11/2020
DEMO FLOOR PLAN - PORCH LEVEL Sheet No. AD 15 4
CEILING DEMO PLAN NOTES
1. ALL ITEMS EXISTING U.N.O..
deca
2. NOT ALL CEILING ITEMS ARE SHOWN
CONTRACTOR TO VERIFY EXISTING CONDITIONS. a r C h 1 t e C t u r e 1 n C
935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
DEMO RCP LEGEND
41!� 2919A�C�f:�
EXISTING CEILING DAVID T. WAN
Pam >OOK __�o D, GON
,.
OF
D BE REMOVED GTO
TIGARD TUALATIN SCHOOL
_ DISTRICT
'\_ \
,i , 4t .. .. ` '.i 1. .. Y t. .rV F (• / �� / \\ / �..\ / �./
•• '1 ;: : '- •; ,• �• �:• •: .. ... ._ :.> •, .: L-�' -::,'`: � . � , \ \/( � TEMPLETONPRE-K CONFERENCE CENTER AND
It V
�•t. r�•. ♦
.tet C
ro
,v
,
T-�
.r
v -•
'vr \
"
r�
9500 SW Murdock
Tigard, R 97224
-
vv Y
_
PRE-K /
0 0A v y
_*J
y.
i
/
1-
/
r.
,
4
„
kk 4
f
�j
• _ P
,
„
l
/
PLAN KEY:
/
_
\
r-
I
is
Issue Revision Date
100% CONSTRUCTION DOCUMENTS
/
�2
14 \
SECTOR DEMO RCP -
PRE-K
Scale As indicated
NDate 09/11/2020
- 1 DEMO REFLECTED CEILING PLAN - PRE-K
1/8 = 11-011
Sheet No. A D 2 01
CEILING DEMO PLAN NOTES
1. ALL ITEMS EXISTING U.N.O..
deca
2. NOT ALL CEILING ITEMS ARE SHOWN.
CONTRACTOR TO VERIFY EXISTING CONDITIONS. a r c h 1 t, e c t, U r e I n c
935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
DEMO RCP LEGEND
2 3 4 5 6 7 D A�C�
17'-3 1/2" 15'-0" 15'-8" 16'3" 16'A" 27'-1"
2919 • 21
zEXISTING CEILING DAND T. YMAN �
LU a
U
v f" tP PORTLAND, GONr*
U.Z w f._Y_;
OF
V \ EXISTING CEILING TO
BE REMOVED
L - - J TIGARD-TUALATIN SCHOOL
DISTRICT
TEMPLETON PRE-K,CONFERENCE CENTER,AND
r - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - DISTRICT SERVICES
9500 SW Murdock
j Tigard, OR 97224
� EXTENT OF ROOF I
iv OVERHANG
I
"ao ABOVE "_ -
'`_
-f r
7
r
� ` \ J :p ,tom e'Y x = - ; '- Y Y ✓. r :.E �._ 1 � 1.
1�
,. ..:...... . • . ..� -_. .:__.. ::... , ..l.:, .:,.,.. .. , ,•:.112-0 11/16 . . - it:.: ;:� � ^`'.=_.�'�•'�:' .< -
:-nth::.,C,ii:•rJ.. -.z :J...n.l... .y.� -{_ .1>�.t..;':: ,>... - 'y,i, -.ti. ':i.i I Y �). — ,S\:'N'��<iw-,:: l4.
, .,� •r :rte;;"ad�ny n_r,•_,: ,y<-i�r , .'+{: -^]:.:a. L ! _ ..:y,
.i::CJ:^J...... .Krni w.Y':v. J. -, lF': YuIY r. i4 ! .J.•,i;
ip:�w:f L�', •:7 '::`>• .Ai:p':)'Z vj a' si'. •f
v
I
I
t r y!`tt
I .LY. � 'Sz T ) '�4yy:dg.• _ :=L•:AJ �
Y !
"t.:'i: iij4:'�:��y';. [ �.. 'Y J sv ) r'�✓ �-�� ::v' � .w". 'r✓::.j ?>�v �` `t [
I :�:`,% [ Y r ,. '♦ t.'v, 0 y \ ,v 1 ? t y .,.;:.�^,'7...f:`� �1't F] �r 7` I 1 5
17
O
I
co
pe
RIDGE
:r..[
Y.. ..
SL
< s
PLAN KEY.
t
c _. :~4 t ( + r a „s, Y, � J -{-. tt.`� �`r1.:+'�:�' �.J ' f :;•y, +�' {� � 't Yi r``J'��' „ . ! 4:,>r j,i; r
.h°i' ( 1 { .., , 4A y a ` �'.' y t!l. ) ✓ '} 1 r 3C 1 •f� Y:i\ ft t ,
:'1 t•� /�.' 4Yt �., C a s .! ,) > - r 'f e a r+. .,
, :7.tJ f Y 4 ) f �\, a .>5 t Jit°p��+,.:V ,if ri ..1�'�tI t, 0 5`„Y S i ✓ � �'.. ] I.
` ' 1.
S•. tl ' 4,r'e ,� a { , { `J. ` J% svJ _ \^ ~ .J�'r v 4Yt - '�)
y,
U EL L
CONFERENCE CENTER i
r
Issue Revision Date
LJ
100% CONSTRUCTION DOCUMENTS
. y
✓i a:
•rJ` _
f:
SECTOR DEMO RCP -
CONFERENCE CENTER
Scale As indicated
N
Date 09/11/2020
- DEMO REFLECTED CEILING PLAN - CONFERENCE CENTER � Sheet No. A D 2 0 2
CEILING DEMO PLAN NOTES
1, ALL ITEMS EXISTING U.N O
deca
2. NOT ALL CEILING ITEMS ARE SHOWN.
CONTRACTOR TO VERIFY EXISTING CONDITIONS. a r c h 1 t, e c t, it r e I n c
935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 fax 503 239 6558 deca-inc.com
DEMO RCP LEGEND
��gED ARCS
2919 f�
EXISTING CEILING DAVID T. YMAN 117*
tJPORTLAND, CON
r - - � 0Fp���o
EXISTING CEILING TO
BE REMOVED
L — — J TIGARD-TUALATIN SCHOOL
DISTRICT
TEMPLETON PRE-K,CONFERENCE CENTER,AND
DISTRICT SERVICES
9500 SW Murdock St.
Tigard, OR 97224
6 7 8 9 10 11
27'-1" 16-5 1/8" 27'-9" 26'-11 5/8" 2T-8"
I - - - - - - - - - - - - - - - - - - -
LU
WLU
4
U
Z
W
- - - - - - - - - - - - - - - - - O�rE- - - _ - - - _ - _ -
I I I
11 1111111 Hill 1 11 Hill
I I
ITF r 1 -1 1 1 1111 Ill 1 11 1 1 1 J I I I I I I I I I I I I I ti I I I FFF17_1_1 PLAN KEY:
(E)STRUCTURE AND METAL DECI
I II 1111111H H1
I
4A
REMOVE(E)AWNING ABOVE DOOR.
REPAIR EXTERIOR WALL -
i
rT' 7
Issue Revision Date
3 .
I I
SECTOR DEMO RCP -
LOWER CONFERENCE
CENTER AND GYM
Scale As indicated
N 09/11/2020
-
(DI
DEMO REFLECTED CEILING PLAN - LOWER CONFERENCE CENTER AND GYM Date
1/8" = 1'-0" Sheet No. A D 2 0 3
16 17
— — — — — — — 1 CEILING DEMO PLAN NOTES
1. ALL ITEMS EXISTING U.N.O.. d e c a
2. NOT ALL CEILING ITEMS ARE SHOWN. architecture . i n c
CONTRACTOR TO VERIFY EXISTING CONDITIONS.
935 SE Alder Street : Portland Oregon 97214
tel 503 239 1987 tax 503 239 6558 deca-inc.com
DEMO RCP LEGEND
2919 C�rfa
EXISTING CEILING
DAVID T. YMAN C�
tJ�1aRTLAND, GONr�
OF
EXISTING CEILING TO
BE REMOVED
L — — J TIGARD-TUALATIN SCHOOL
I
DISTRICT
REMOVE ALL(E) TEMPLETON PRE-K,CONFERENCE CENTER,AND
\ LIGHT FIXTURES,
TMP DISTRICT SERVICES
9500 SW Murdock St.
Tigard, OR 97224
I
/ REMOVE ALL (E)
SUSPENDED ACT
CEILING, TYP
C :1 C �
i
II U U
p � II u
I u ii
C :l C
- o- 0
I
PLAN KEY:
I
I
I
/ 1 Issue Revision Date
100% CON STRUCTION DOCUMENTS
i
i I
I
I
COORDINATE EXTENT OF ROOF DEMO WITH STRUCTURAL
SECTOR DEMO RCP -
PORCH BUILDING
L2 Scale As indicated
N
Date 09/11/2020
_ �$ O
MO REFLECTED CEILING PLAN - PORCH BUILDING Sheet No. A D 2 04