Loading...
Permit CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit#: BUP2022-00297 TIGARD13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/4/2023 Parcel: 2S101 DA00102 Jurisdiction: Tigard Site address: 13221 SW 68TH PKVVY 450 Project: ECI Subdivision: None Lot: None Project Description: TI for new tenant:New walls,cabinetry, and finishes. Contractor: WALEN CONSTRUCTION Owner: G&I X TRIANGLE CORPORATE PARK LLC 20915 SW 105TH AVE BY DRA ADVISORS LLC TUALATIN, OR 97062 ATTN TAX DEPT 575 FIFTH AVENUE 38TH FL NEW YORK, NY 10017 PHONE: 503-718-6680 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: I I B Permit Fee-Additions,Alterations, 12/20/2022 $630.27 Occupancy Grp: B Occupancy Load: 24 Demolition Dwelling Units: 0 12%State Surcharge-Building 12/20/2022 $75.63 Stories: 0 Height: 0 fit Plan Review 12/01/2022 $409.68 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 12/20/2022 $110.00 Value: $40,462 Plan Review-Fire Life Safety 12/20/2022 $252.11 Info Process/Archiving-Lg$2.00(over 12/20/2022 $8.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1.485.69 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 232.1987 or 1.800.332.2344. Issued By: Permittee Signature: ry Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 114 ■ Accessibility; Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, 40,462 excluding painting and wallpapering: [11 $• MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 10,115.50 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 Permit Coordinator Review 0-Conditions "Met"prior to issuance of permit ❑ Approved, NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: jzie SDC Exemption ❑ Applied for ❑ Received Does not apply gFees Entered: Wash Co Trans Dev Tax: ❑ Yes /A ❑ Deferred Tigard Trans SDC: ❑ Yes 7 N/A ❑ Deferred Parks SDC: ❑ Yes /N/A ❑ Deferred LIDA Fee: ❑ Yes /N/A OK to Issue/Approved by Permit Coordinator: 4 Date: 12-12I7023 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved ❑ Not Approved I:\Building\Forms\BldgPennitRvw_COM_NoLandU se_081 62022.docx