Permit CITY OF TIGARD MECHANICAL PERMIT
': . COMMUNITY DEVELOPMENT Permit#: MEC2022-01030
T G G f\H.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/29/2022
Parcel: 2S112DA01400
Jurisdiction: Tigard
Site address: 15350 SW SEQUOIA PKWY 280
Project: PCC 280 Corridor Subdivision: Lot: 2
Project Description: Demo existing duct,install new duct and diffusers.
Contractor: PROTEMP ASSOCIATES INC Owner: PACIFIC REALTY ASSOCIATES
9788 SE 17TH AVE ATTN: N PIVEN
PORTLAND, OR 97222 15350 SW SEQUOIA PKWY#300
PORTLAND, OR 97224
PHONE: 503-233-6911 PHONE:
FAX: 503-238-9767
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 12/09/2022 $614.41
Class of Work: OTR Type of Const: VA Plan Review 12/09/2022 $153.60
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 12/09/2022 $73.73
Stories: 1 Info Process/Archiving-Lg$2.00(over 12/09/2022 $4.00
11x17)
Project Valuation: $20,460.00
Fuel Air Handlers
Fuel Types: Units<10000 cfm:
Gas Pressure: Units>10000 cfm:
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $845.74
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work: 100
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
Issued By: Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the Job site at the time of each inspection.