Permit CITY OF TIGARD BUILDING PERMIT
III i • COMMUNITY DEVELOPMENT Permit#: BUP2022-00303
'J•{G ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/4/2023
Parcel: 2S112DB00300
Jurisdiction: Tigard
Site address: 7257 SW KABLE LN 100
Project: Trane Subdivision:HERN PACIFIC TIGARD INDUSTRIAL Lot: 5
Project Description: TI for existing tenant: Demolition,new partition walls,doors,and suspended ceiling.
Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES
15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN
PORTLAND, OR 97224 15350 SE SEQUOIA PKWY#300
PORTLAND, OR 97224
PHONE: 503-624-6300 PHONE:
FAX: 503-624-7755
Specifics: FEES
Description Date Amount
Type of Use:
Class of Work: Type of Const: Permit Fee-Additions,Alterations, 01/04/2023 $509.05
Occupancy Grp: Occupancy Load: Demolition
12%State Surcharge-Building 01/04/2023 $61.09
Dwelling Units: Plan Review 12/07/2022 $330.88
Stories: Height: it DC Provision Review,COM TI-Ping 01/04/2023 $110.00
Bedrooms: Bathrooms: Info Process/Archiving-Lg$2.00(over 01/04/2023 $8.00
Value: $30,000 11x17)
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $1,019.02
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire If work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 95 -001-0090. Yo may obtain copy of the ules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittea Signature: C/ h�4KrX
Call 503.639.4175 by 7:00 a.m.for the next available inspection date. LG XI
This permit card shall be kept in a conspicuous place on the Job site until completion of the project.
Approved plans are required on the Job site at the time of each Inspection.
City of Tigard
UPIIlCOMMUNITY DEVELOPMENT DEPARTMENT
l
TIcnRD Building Permit Review — Commercial - No Land Use
Building Permit #: F7 )72-- 00303
Site Address: -12S1 sW 6Z-0119le ewe. Suite/Bldg#: I00
Project Name: -Irmo,. 1s'`ti✓'oc I l _
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review _
Proposal: `J��(jlnc/ ( l "tD GA VLA/ e In5ids 4l81i7 Pow She.
-pr -r,ct i -cMk
Existing Business Activity: Off/ce
Proposed Business Activity: ((,e
Verify site address/suite# exists and active in permit system.
'River Terrace Neighborhood: ❑ Yes )2(No
Zoning: i — (-'.
Permitted Use: 4i Yes ❑ No ❑ Spec Space
21-2onflrm no land use required.
Business License:
Exists: Yes 0 No, applicant was provided a business license application
Notes: 1\3p ho11 If Ste vilid ' .
Approved by Planning: t,g7 .
Date: rxhi2--
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: /2/07/22.
Site Plans: #
Building Plans: # 3
Building Permit#: ..2 Enter building permit# above.
Workflow Routing: planning JamPermit Coordinator ' Building
Workflow Sign-off: . -off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: 61- Date: it/0-22oz
I:1BuildingForms\BldgPermitRvw_COM_No LandUse_09072022.docx
Permit Coordinator Review
nitConditions "Met"prior to issuance of permit
E Approved,NOT Released: Date:
❑ ENG Revisions Required: Date:
Notes:
SDC Exemption E Applied for ❑ Received Does not apply
Fees Entered: Wash Co Trans Dev Tax: ❑ Yes �N/A ❑ Deferred
Tigard Trans SDC: ❑ Yes ,Z N/A ❑ Deferred
Parks SDC: 0 Yes X N/A ❑ Deferred
LIDA Fee: 0 Yes ,zr N/A
OK to Issue/Approved by Permit Coordinator: 1 v,,, „ Date: I J 41 2,0 2,3
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
I:\Building\FormslBldgPemitRvw_COM_NoLandUse_08162022.docx