Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (2)
zur 2022- 00017 OFFICE COPY COMcheck Software Version 4.1.5.3 Mechanical Compliance Certificate RECEIVED Project Information APR 04 2022 Energy Code: 2018 IECC CITY OF TIGARD Project Title: AVA Mixed Use BUILDING DIVISION Location: Tigard, Oregon Climate Zone: 4c Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: I25L173-i337 SW Main St Neek Engineering MFIA Tigard, OR 4770 SW Hall Blvd 2007 SE Ash St Beaverton, OR 97005 Portland, OR 97214 503-234-0548 Additional Efficiency Package(s) Credits: 1.0 Required 0.0 Proposed Mechanical Systems List Quantity System Type& Description 1 RTU-1 (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficiency=80.00%Et, Required Efficiency: 80.00% Et or 80%AFUE Cooling: 1 each-Single Package DX Unit,Capacity=24 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=14.00 SEER,Required Efficiency: 14.00 SEER Fan System: Unspecified 1 IHP/OHP-1 (Single Zone): Split System Heat Pump Heating Mode:Capacity=21 kBtu/h, Proposed Efficiency= 11.20 HSPF, Required Efficiency=8.20 HSPF Cooling Mode:Capacity=18 kBtu/h, Proposed Efficiency=20.50 SEER,Required Efficiency: 14.00 SEER Fan System: Unspecified 1 IHP/OHP-2(Single Zone): Split System Heat Pump Heating Mode:Capacity=18 kBtu/h, Proposed Efficiency=8.20 HSPF, Required Efficiency=8.20 HSPF Cooling Mode:Capacity=14 kBtu/h, Proposed Efficiency=14.50 SEER, Required Efficiency: 14.00 SEER Fan System: Unspecified 1 IHP/OHP-3(Single Zone): Split System Heat Pump Heating Mode:Capacity=18 kBtu/h, Proposed Efficiency=10.00 HSPF,Required Efficiency=8.20 HSPF Cooling Mode:Capacity=17 kBtu/h, Proposed Efficiency=18.00 SEER, Required Efficiency: 14.00 SEER Fan System: Unspecified 1 IAC/OAC-1 (Single Zone): Cooling: 1 each-Split System,Capacity=12 kBtu/h,Air-Cooled Condenser,No Economizer, Economizer exception:None Proposed Efficiency=15.20 SEER,Required Efficiency: 13.00 SEER Fan System: Unspecified 22 Water Heater 1: Electric Storage Water Heater,Capacity:50 gallons Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 1 of 15 Quantity System Type&Description Proposed Efficiency:0.84 SL,%/h(if>12 kW), Required Efficiency:0.84 SL,%/h(if>12 kW) Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Bryan Gregory Bryan Gregory 3-21-2022 Name -Title Signature Date Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 2 of 15 - COMcheck Software Version 4.1.5.3 11 Inspection Checklist Energy Code: 2018 IECC Requirements: 81.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions & RagID C103.2 Plans, specifications, and/or ;EComplies Requirement will be met. [PR2]1 calculations provide all information EDoes Not with which compliance can be ❑Not Observable Location on plans/spec: MO.1 determined for the mechanical :systems and equipment and :❑Not Applicable document where exceptions to the ;standard are claimed. Load :calculations per acceptable I ;engineering standards and ;handbooks. C103.2 ;Plans, specifications, and/or EComplies ,Requirement will be met. [PR3]1 :calculations provide all information EDoes Not ;with which compliance can be ❑Not Observable Location on plans/spec: P0.1 :determined for the service water :heating systems and equipment and ENot Applicable document where exceptions to the ;standard are claimed. Hot water system sized per manufacturer's sizing guide. C406 Plans,specifications, and/or ElComplies [PR9]1 :calculations provide all information ❑Does Not ;with which compliance can be determined for the additional energy !❑Not Observable ;efficiency package options. ❑Not Applicable i Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 3 of 15 Section # I Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID C403.12.2 Snow/ice melting system and freeze ❑Complies Exception: Requirement does not apply. protection systems have sensors and ❑Does Not C403.12.3 controls configured to limit service for (FO9]3 pavement temperature and outdoor ❑Not Observable' temperature.future connection to ❑Not Applicable controls. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:INEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 4 of 15 r Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Req.ID C404.5, Heated water supply piping conforms I❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume '❑Does Not C404.5.2 requirements. Refer to section details. Location on plans/spec: NA [PLOP [Not Observable .❑Not Applicable C404.5, Heated water supply piping conforms ,❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. Location on plans/spec: MO.1 ['Not Not Observable '❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies ;Exception: Requirement does not apply. C404.5.1, to pipe length and volume EDoes Not C404.5.2 requirements. Refer to section details. Location on plans/spec: M0.1 [PL6]3 ❑Not Observable ENot Applicable C404.5, Heated water supply piping conforms EComplies ,Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404,5.2 requirements. Refer to section details. Location on plans/spec: NA [PL6]3 I❑Not Observable ❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ElDoes Not C404.5.2 requirements. Refer to section details. ••Location on plans/spec: NA [PL6]3 ['Not Observable ❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies I Requirement will be met. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. [PL6]3 Ill Not Observable ❑Not Applicable j C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to ❑Not Observable Location on plans/spec: NA <= 5 minutes after end of heating cycle. ❑Not Applicable C404.6.3 Pumps that circulate water between a ❑Complies ;Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls :❑Does Not that limit operation from startup to ❑Not Observable Location on plans/spec: M0.1 <= 5 minutes after end of heating cycle. ❑Not Applicable C404.6.3 :Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to Location on plans/spec: MO.1 <= 5 minutes after end of heating ENot Observable cycle. ❑Not Applicable C404.6.3 I Pumps that circulate water between a I❑Complies Exception: Requirement does not apply. [PL7]3 ;heater and storage tank have controls ❑Does Not that limit operation from startup to !❑Not Observable',Location on plans/spec: NA <= 5 minutes after end of heating cycle. ,❑Not Applicable C404.6.3 !Pumps that circulate water between a ❑Complies ;Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to Location on plans/spec: NA <= 5 minutes after end of heating ❑Not Observable cycle. ❑Not Applicable i C404.6.3 Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to Location on plans/spec: NA <= 5 minutes after end of heating Not Observable cycle. ❑Not Applicable j 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 5 of 15 Section I # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Req.ID1 _ I C404.7 Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 have controls that start the pump ❑Does Not upon receiving a signal from the 'Location on plans/spec: NA action of a user of a fixture or Not Observable ❑Not Applicable appliance and limits the temperature of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems '❑Complies Exception: Requirement does not apply. [PL8]3 have controls that start the pump ❑Does Not ❑Not Observable upon receiving a signal from the Location on plans/spec: MO.1 action of a user of a fixture or appliance and limits the temperature ❑Not Applicable of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems '❑Complies :Exception: Requirement does not apply. [PL8]3 have controls that start the pump ❑Does Not upon receiving a signal from the Location on plans/spec: MO.1 action of a user of a fixture or ENot Observable appliance and limits the temperature ❑Not Applicable of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems ❑Complies 'Exception: Requirement does not apply. 3 [PL8] 'have controls that start the pump '❑Does Not upon receiving a signal from the [Not Observable Location on plans/spec: NA action of a user of a fixture or ❑Not Applicable erva appliance and limits the temperature of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 have controls that start the pump ❑Does Not upon receiving a signal from the Location on plans/spec: NA action of a user of a fixture or ❑Not Observable appliance and limits the temperature ❑Not Applicable of the water entering the cold-water piping to 104°F. , C404.7 Demand recirculation water systems :❑Complies :Exception: Requirement does not apply. [PL8]3 have controls that start the pump !❑Does Not upon receiving a signal from the ❑Not ObservableLocation on plans/spec: NA action of a user of a fixture or appliance and limits the temperature ❑Not Applicable of the water entering the cold-water piping to 104°F. , Additional Comments/Assumptions; Q High Impact(Tier 1) ®Medium Impact(Tier 2) ©Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:WEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 6 of 15 Section # Mechanical Rough-In Inspection 1 Complies? Comments/Assumptions & Req.ID C402.2.6 Thermally ineffective panel surfaces of'.❑Complies Exception: Requirement does not apply. [ME41]3 sensible heating panels have ❑Does Not i insulation >= R-3.5. 'Location on plans/spec: NA ❑Not Observable ❑Not Applicable C403.11.3',HVAC piping insulation insulated in ❑Complies Requirement will be met. (ME61]2 accordance with Table C403.11.3. ;DDoes Not Insulation exposed to weather is protected from damage and is ❑Not Observable provided with shielding from solar ❑Not Applicable radiation. C403.11.3 HVAC piping insulation insulated in •❑Complies Requirement will be met. (ME61]2 accordance with Table C403.11.3. ❑Does Not Insulation exposed to weather is • protected from damage and is ['Not Observable; provided with shielding from solar ❑Not Applicable radiation. C403.11.3 HVAC piping insulation insulated in ❑Complies !Requirement will be met. [ME61]2 accordance with Table C403.11.3. ❑Does Not Insulation exposed to weather is protected from damage and is ❑Not Observable provided with shielding from solar ❑Not Applicable 1 radiation. ; 1C403.11.3 HVAC piping insulation insulated in :OComplies Requirement will be met. I[ME61]2 accordance with Table C403.11.3. ❑Does Not Insulation exposed to weather is protected from damage and is [Not Observable provided with shielding from solar ,❑Not Applicable , radiation. C403.8.1 HVAC fan systems at design ❑Complies Requirement will be met. [ME65]3 conditions do not exceed allowable ❑Does Not fan system motor nameplate hp or fan j Location on plans/spec: MO.1 system bhp. ❑Not Observable; ❑Not Applicable ;See the Mechanical Systems list for values. C403.8.1 HVAC fan systems at design :❑Complies Requirement will be met. [ME65]3 conditions do not exceed allowable ❑Does Not fan system motor nameplate hp or fan ❑Not Observable;Location on plans/spec: MO.1 system bhp. ❑Not Applicable :See the Mechanical Systems list for values. C403.8.1 HVAC fan systems at design ❑Complies ,Requirement will be met. [ME65]3 conditions do not exceed allowable ❑Does Not fan system motor nameplate hp or fan Location on plans/spec: MO.1 system bhp. ,❑Not Observable ❑Not Applicable :See the Mechanical Systems list for values. C403.8.1 HVAC fan systems at design ;❑Complies Requirement will be met. [ME65]3 conditions do not exceed allowable ;❑Does Not fan system motor nameplate hp or fan i Location on plans/spec: MO.1 system bhp, Not Observable j❑Not Applicable :See the Mechanical Systems list for values. C403.8.1 HVAC fan systems at design !❑Complies Requirement will be met. [ME65]3 conditions do not exceed allowable ;❑Does Not fan system motor nameplate hp or fan iLocation on plans/spec: MO.1 system bhp. j❑Not Applicable See the Mechanical Systems list for values. C403.8.3 Fans have efficiency grade (FEG) >_ ❑Complies Exception: Fans integral to equipment listed under Section [ME117]2 67.The total efficiency of the fan at ❑Does Not C403.2.3. the design point of operation <= 15% [Not Observable of maximum total efficiency of the Location on plans/spec: MO.1 fan. ❑Not Applicable C403.8.3 Fans have efficiency grade (FEG) >_ ❑Complies Exception: Fans integral to equipment listed under Section [ME117]2 67.The total efficiency of the fan at ❑Does Not C403.2.3. the design point of operation <= 15% of maximum total efficiency of the ❑Not Observable l Location on plans/spec: M0.1 fan. ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 7 of 15 • Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.8.3 Fans have efficiency grade (FEG) >= ❑Complies Exception: Fans integral to equipment listed under Section [ME117]2 67.The total efficiency of the fan at Does Not C403.2.3. the design point of operation <= 15% of maximum total efficiency of the ❑Not Observable Location on plans/spec: MO.1 fan. ;❑Not Applicable i C403.8.3 Fans have efficiency grade (FEG) >= !❑Complies :Exception: Fans integral to equipment listed under Section [ME117]2 67.The total efficiency of the fan at ❑Does Not C403.2.3. the design point of operation <= 15% ❑Not Observable of maximum total efficiency of the :Location on plans/spec: MO.1 fan. ❑Not Applicable C403.8.3 Fans have efficiency grade (FEG)>_ •❑Complies :Exception: Fans integral to equipment listed under Section I[ME11712 67.The total efficiency of the fan at ❑Does Not C403.2.3. the design point of operation <= 15% of maximum total efficiency of the ❑Not Observable Location on plans/spec: MO.1 I fan. ,❑Not Applicable i C403.12.1 Systems that heat outside the building:❑Complies ,Exception: Requirement does not apply. [ME71]2 envelope are radiant heat systems j❑Does Not controlled by an occupancy sensing !Location on plans/spec: NA device or timer switch. Not Observable' ❑Not Applicable C403.2.3 HVAC equipment efficiency verified. !❑Complies See the Mechanical Systems list for values. .[ME55]2 ;❑Does Not ENot Observable ti ❑Not Applicable C403.2.2 :Natural or mechanical ventilation is ❑Complies :Requirement will be met. [ME59]1 !provided in accordance with ;❑Does Not ;International Mechanical Code Location on plans/spec: MO.1 ;Chapter 4. Mechanical ventilation has ['Not Observable !capability to reduce outdoor air supply ❑Not Applicable to minimum per IMC Chapter 4. C403.7.1 :Demand control ventilation provided I❑Complies Exception: Requirement does not apply. [ME59]1 for spaces >500 ft2 and >25 ❑Does Not ;people/1000 ft2 occupant density and ['Not Observable;Location on plans/spec: NA ;served by systems with air side economizer, auto modulating outside !❑Not Applicable ;air damper control, or design airflow i>3,000 cfm. • C403.7.2 Enclosed parking garage ventilation I❑Complies Exception: Requirement does not apply. [ME115]3 has automatic contaminant detection ❑Does Not and capacity to stage or modulate ❑Not Observable:Location on plans/spec: NA fans to 50%or less of design capacity. ❑Not Applicable j C403.7.6 HVAC systems serving guestrooms in ❑Complies Exception: Requirement does not apply. [ME141]3 Group R-1 buildings with > 50 ❑Does Not guestrooms: Each guestroom is ENot Observable Location on plans/spec: NA provided with controls that ❑Not Applicable erva automatically manage temperature setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2). C403.7.4 Exhaust air energy recovery on EComplies Exception: Requirement does not apply. [ME57]1 ,systems meeting Table C403.7.4(1) ❑Does Not ;and C403.7.4(2). I ❑Not Observable j❑Not Applicable C403.7.5 Kitchen exhaust systems comply with '❑Complies Exception: Requirement does not apply. 1 [ME116]3 replacement air and conditioned ❑Does Not supply air limitations, and satisfy hood Location on plans/spec: NA rating requirements and maximum ❑Not Observable exhaust rate criteria. Observable, Applicable 1 High Impact(Tier 1) 2 I Medium Impact(Tier 2) L3J Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 8 of 15 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Reg.II3 C403.11.1 HVAC ducts and plenums insulated in ❑Complies Requirement will be met. accordance with C403.11.1 and ❑Does Not C403.11.2 constructed in accordance with [ME60]2 C403.11.2,verification may need to ❑Not Observable occur during Foundation Inspection. `❑Not Applicable C403.4.3. Closed-circuit cooling tower within ❑Complies Exception: Requirement does not apply. 3.2 heat pump loop have either automatic ❑Does Not [ME121]3 bypass valve or lower leakage positive ❑Not Observable Location on plans/spec: MO.1 closure dampers. Open-circuit tower within heat pump loop have automatic ❑Not Applicable valve to bypass all heat pump water flow around the tower. Open-or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open- or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop. , C403.4.3. Closed-circuit cooling tower within ❑Complies 'Exception: Requirement does not apply. 3.2 heat pump loop have either automatic ❑Does Not i[ME121]3 bypass valve or lower leakage positive ❑Not Observable:Location on plans/spec: MO.1 closure dampers. Open-circuit tower within heat pump loop have automatic!❑Not Applicable valve to bypass all heat pump water flow around the tower. Open-or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open-or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop. C403.4.3. Closed-circuit cooling tower within ❑Complies Exception: Requirement does not apply. 3.2 heat pump loop have either automatic .❑Does Not [ME121]3 bypass valve or lower leakage positive Location on plans/spec: NA closure dampers. Open-circuit tower ❑Not Observable within heat pump loop have automatic ❑Not Applicable valve to bypass all heat pump water flow around the tower. Open-or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open-or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:WEEK Engineering110000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 9 of 15 Section Mechanical Rough-In Inspection Compliess. Comments/Assumptions I & Req.ID C403.4.1. Heating for vestibules and air curtains ❑Complies :Exception: Requirement does not apply. 4 with integral heating include ❑Does Not [ME63]2 automatic controls that shut off the Location on plans/spec: NA heating system when outdoor air ❑Not Observable temperatures > 45F. Vestibule I❑Not Applicable heating and cooling systems controlled by a thermostat in the 'vestibule with heating setpoint <= 60F and cooling setpoint>= 80F. C403.3.3 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. [ME35]1 kBtu/h - 50% >240 kBtu/h -25% ❑Does Not ❑Not Observable Location on plans/spec: NA ❑Not Applicable C403.3.3 :Hot gas bypass limited to: <=240 I❑Complies Location on plans/spec: NA [ME35]1 kBtu/h - 50% >240 kBtu/h -25% IDDoes Not ❑Not Observable ❑Not Applicable C408.2.2. :Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. ElDoes Not [ME53]3 ['Not Observable'; ❑Not Applicable C403.5, Refrigerated display cases, walk-in IDComplies Exception: Requirement does not apply. C403.5.1, coolers or walk-in freezers served by ❑Does Not C403.5.2 remote compressors and remote Location on plans/spec: NA [ME123]3 condensers not located in a Not Observable condensing unit, have fan-powered ❑Not Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. • Additional Comments/Assumptions: 1 High Impact(Tier 1) ,2-, Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 10 of 15 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.6 Low-voltage dry-type distribution ❑Complies [EL26J2 electric transformers meet the ❑Does Not minimum efficiency requirements of Table C405.6. ['Not Observable' ❑Not Applicable 'C405.7 Electric motors meet the minimum '❑Complies [EL27]2 efficiency requirements of Tables '❑Does Not C405.7(1)through C405.7(4), :Not Observable Efficiency verified through certification under an approved certification ❑Not Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.8.2, Escalators and moving walks comply ❑Complies C405.8.2. with ASME A17.1/CSA B44 and have ❑Does Not 1 automatic controls configured to (EL28]2 reduce speed to the minimum ❑Not Observable permitted speed in accordance with ;❑Not Applicable ASME A17.1/CSA B44 or applicable local code when not conveying passengers. C405.9 Total voltage drop across the ❑Complies [EL29]2 combination of feeders and branch ❑Does Not circuits <= 5%. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 ` Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 11 of 15 Section # Final Inspection J Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M manuals for HVAC ,EComplies C408.2.5. ,systems within 90 days of system Does Not 3 acceptance. [Fl8]3 ENot Observable'. ❑Not Applicable C403.2.2 HVAC systems and equipment EComplies ,Requirement will be met. [FI27]3 capacity does not exceed calculated ❑Does Not Toads. Location on plans/spec: M01 ENot Observable ❑Not Applicable C403.2.4. !,Heating and cooling to each zone is ❑Complies .Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device .ENot Observable Location on plans/spec: M2.3 per installed humidification/dehumidification '❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device Location on plans/spec: M2.X per installed Not Observable 1 humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is :❑Complies I Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 'Minimum one humidity control device ENot Observable Location on plans/spec: M2.X per installed humidification/dehumidification ENot Applicable system. C403.2.4. :Heating and cooling to each zone is EComplies .Requirement will be met. 1 :controlled by a thermostat control. ;❑Does Not [FI47]3 'Minimum one humidity control device Location on plans/spec: M2.X per installed humidification/dehumidification 'ENot Applicable system. C403.2.4. Heating and cooling to each zone is ;EComplies .Requirement will be met. 1 'controlled by a thermostat control. ;❑Does Not , [FI47]3 Minimum one humidity control device per installed Not Observable humidification/dehumidification •❑Not Applicable system. C403.2.4. Heat pump controls prevent ❑Complies Exception: Requirement does not apply. 1.1 supplemental electric resistance heat ❑Does Not i[FI42]3 from coming on when not needed. ENot Observable,Location on plans/spec: MO.1 ENot Applicable C403.2.4. Heat pump controls prevent '❑Complies Exception: Requirement does not apply. 1.1 supplemental electric resistance heat !❑Does Not [FI42]3 from coming on when not needed. ❑Not Observable',Location on plans/spec: MO.1 :ENot Applicable C403.2.4. Heat pump controls prevent ❑Complies Exception: Requirement does not apply. 1.1 'supplemental electric resistance heat ❑Does Not [FI42]3 ;from coming on when not needed. ENot Observable Location on plans/spec: M0.1 ENot Applicable C403.4.1. Thermostatic controls have a 5 °F I❑Complies Requirement will be met. 2 deadband. Oboes Not [FI38]3 ['Not Observable ❑Not Applicable ; 1 High Impact(Tier 1) 2 'i Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000 AVA Mixed Use\Energy Forms110000 AVA Mixed Use.cck Page 12 of 15 Section Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Temperature controls have setpoint ❑Cornplies Requirement will be met. 1.3 overlap restrictions. ❑Does Not [FI20]3 ❑Not Observable• ENot Applicable C403.2.4. Each zone equipped with setback ❑Complies ,Requirement will be met. 2 controls using automatic time clock or ❑Does Not [FI39]3 programmable control system. ENot Observable ENot Applicable ; C403.2.4. Automatic Controls: Setback to 55°F ❑Complies ;Requirement will be met. 2.1, (heat)and 85°F (cool); 7-day clock, 2- ❑Does Not C403.2.4. hour occupant override, 10-hour 2.2 backup ENot Observable [F140]3 ❑Not Applicable C404.3 Heat traps installed on supply and ❑Complies ;Requirement will be met. [F111]3 discharge piping of non-circulating :❑Does Not systems. ENot Observable ❑Not Applicable C404.4 All piping insulated in accordance with ❑Complies !Requirement will be met. [F125]2 section details and Table C403.11.3. EDoes Not ENot Observable' ENot Applicable C408.1.1 'Building operations and maintenance ❑Complies [FI57]1 documents will be provided to the ❑Does Not owner. Documents will cover manufacturers' information, ,❑Not Observable !specifications, programming ❑Not Applicable procedures and means of illustrating • ;to owner how building, equipment and :systems are intended to be installed, ;maintained, and operated. C408.2.1 ;Commissioning plan developed by j❑Complies [FI28]1 registered design professional or EDoes Not ;approved agency. ENot Observable ENot Applicable • C408.2.3. ,HVAC equipment has been tested to ❑Complies 1 ensure proper operation. ;❑Does Not [FI3171 !ENot Observable ENot Applicable C408.2.3. !HVAC control systems have been '❑Complies 2 ;tested to ensure proper operation, :❑Does Not [FI10]1 calibration and adjustment of controls. ENot Observable; ENot Applicable C408.2.4 ;Preliminary commissioning report ❑Complies [FI29]1 completed and certified by registered :❑Does Not design professional or approved agency. ;ENot Observable ❑Not Applicable C408.2.5. !Furnished HVAC as-built drawings ;❑Complies 1 submitted within 90 days of system `❑Does Not • [F17]3 acceptance. ENot Observable ❑Not Applicable C408.2.5. !An air and/or hydronic system :❑Complies 3 ;balancing report is provided for HVAC i❑Does Not [FI43]1 systems. • !ENot Observable i ENot Applicable 1 (High Impact (Tier 1) I'' Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 13 of 15 Section pComplies?i Final Inspection Comments/Assumptions & lie ID C408.2.5. Final commissioning report due to .❑Complies 4 building owner within 90 days of •❑Does Not [F130]1 receipt of certificate of occupancy. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) ;,2;'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: AVA Mixed Use Report date: 03/21/22 Data filename: G:\NEEK Engineering\10000_AVA Mixed Use\Energy Forms\10000 AVA Mixed Use.cck Page 14 of 15