Loading...
Permit Support Document (n5T 2oz2 - 06357 City of Tigard ' Deferral Until Occupancy Request Washington County Transportation Development Tax (IDT),Transportation and Parks System Development Charges (SDCs) This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then upon land use approval(TMC 3.24,as amended by Ordinance No.21-09). Date: 10/3/2022 Site Address: 16893 SW Colorado Lane Project South River Terrace Land Use Case of Name: Bldg 5 Unit 3 Building Permit##: MST2022-00357 Tax Lot 2S107AD05200 Total Parks $6,336.00 #: Tract H Amount*: TDT N/A Total TSDC Amount: Amount*: $7,002.00 *The total TSDC amount shown above is the sum of$ 4,527.00 for TSDC-Improvement, $261.00 for TSDC- Reimbursement,and$2 214.00 for TSDC-River Terrace,if applicable.. *The total Parks SDC amount shown above is the sum of$5.129.00 for Parks-Improvement,$ 1,207.00 for Parks- Reimbursement,and either$ N/A for Parks-Neighborhood or$ N/A for Parks-Neighborhood River Terrace. This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs, as provided above, until occupancy. Payment of the TDT,TSDC, and Parks SDCs may be deferred until issuance of the occupancy permit. In requesting this option, I understand that any deferred TDT,TSDC, and Parks SDCs must be paid prior to final inspection or issuance of an occupancy permit. TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. Property Owner: Ow�a-r ALawi Alyvt afS (Taylor Morrison NW) Date: 10/03/2022 Developer:Qmcw Alaww Abo a (Taylor Morrison NW) Date: 10/03/2022 Permit Coordinator: ,A 4MAM& Date: 10/3/2022