Loading...
Permit. CITY OF TIGARD MASTER PERMIT _ - COMMUNITY DEVELOPMENT Permit#: MST2022-00156 Date Issued: 07/28/2022 T IGA1 i? 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S1070001300 Jurisdiction: Tigard Site address: 16796 SW COLORADO LN Subdivision: Lot: Project: South River Terrace, Lot 6 Project Description: New detached dwelling. NO FINAL UNTIL DEFERRED SDC FEES ARE PAID. REPRINT to add 190 sf deck. BUILDING Floor Areas Required Setbacks Required Stories: 2 Bedrooms: 5 First: 1353 sf Basement: 0 sf Left: 3 Parking Spaces: 0 Height: 25.5 Bathrooms: 3 Second: 1852 sf Garage: 439 sf Front: 12 Smoke Yes Dwelling Units: 1 Third: 0 sf Right: 3 Detectors: Total: 3205 sf Value: $445,892.42 Rear: 15 PLUMBING Sinks: 1 Water Closets: 3 Washing Mach: 1 Laundry Trays: 0 Rain Drain: 1 Urinals: 0 Lavatories: 5 Dishwashers: 1 Floor Drains: 0 Sewer Lines: 100 SF Rain Drains: 0 Storm Sewer: 100 Tubs/Showers: 4 Garbage Disp: 1 Water Heaters: 1 Water Lines: 100 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 100 Ice Maker: 1 Hose Bib: 2 Backwater Value: 1 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Tvpes Air Conditioning: Y Vent Fans: 5 Clothes Dryers: 1 Natural Gas Heat Pump: N Hoods: 1 Other Units: 0 Fum<100K: 1 Vents: 0 Woodstoves: 0 Gas Outlets: 3 Fum>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 1 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add!500 sf: 6 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Y Other: N Other Description: Ecompasing: BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: NEW SF VB R-3 3205 Owner: Contractor: TAYLOR MORRISON NORTHWEST LLC WILLIAM LYON HOMES INC Required Items and Reports(Conditions) 703 BROADWAY ST STE 510 703 BROADWAY STREET,SUITE 510 1 Ersn Cntrl 503-639-4175 VANCOUVER,WA 98660 VANCOUVER,WA 98660 PHONE: PHONE: 360-695-7700 FAX: Total Fees: $28,443.43 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTE ON: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR Qc9-rinLnn1n thin h(lA oc%rin111non V brain row of than Jac nr riira t nuaefinne tn ru Ii.M by rallinn ring 919 10A'r nr 1 SAlt t9 914A �� Permittee Signature: $C 2 7,) I , GA'(;c -? Issued By: r Call 503.639.4175 7:00 a.m.for the next available inspection date. This permit card shall be kept i conspicuous place on the job site until completion of the project. Approved plans are required on the lob site at the time of each Inspection. FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1 _ " Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.l;ov TO: Allyson Armstrong DATE RECEIVE,% G� DEPT: BUILDING DIVISION c ' G1� AU(, 3 7t�?r FROM: Chris Roberts PRU 01A`l O G D\11S101 COMPANY: Taylor Morrison BOO IN PHONE: 503-313-9449 By:20 EMAIL: crobertsl@taylormorrison.com RE: t(o j ED COL W )4ST gp22r out SL (Site Address)' I r (Permit Number) SOu— (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: I Description: I Copies: I Description: Additional set(s) of plans. x Revisions: Adding a deck. Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: Bulletins to add a deck to the submitted plans. t 01 IL- 1 cli.D FO OF CE USE ONLY Routed to Pe Technician: Date: ��Q� Z Initials: kii— Fees Due: Ai Yes ❑No Fee Descnption: Amount Due: Qe /2 1 c..n r t'-c t,) $ `-Ls $ Special Instructions: Reprint Permit(per PE): / Yes ❑No ❑ Done Applicant Notified: s./ Date: Li 12.$ [a-}Eima'le 4 CG ►S 11c++h Initials:_P City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Residential TIGARD Building Permit #: 717-5 22 a�/s60' Site Address: \ b 1"t 50 5vJ ( 0\°I .0(0 Lvt Project Name: `7 10c QAtt W li Lot #: C2 Planning Review Q3Oe (i_ , e Proyosal: J '�), 12". fVerify address/suite#active in Accela. In River Terra e: 0 No C3" Yes,River Terrace Review Addendum Silan Elements: Erosion Control .L 3,epies of site plan on 8-1/2"x 11"or 11 x 17"paper liRe aired trees with drip line and tree protection measures to scale(standard architect or engineer scale)ri ototprint of new structure (including decks)and FFE arrow tiliry locations&easements(required for new and additions) lei to •.•dress,project or subdivision name and lot number3idewalk/driveway approach .plicant information(name and phone number) []Location of wells/septic systems II .t dimensions and building setback dimensions eet tree size,type and location Square footage of buildings to be demolished eet names E ring structures on site Corner elevations(2'contours if more than 4'diff tial) tot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced? .I l Yes ❑�Noo impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? ❑Yes Jd'1Qo Clean Water Services—Service Provider Letter...Al ot platted prior to 9/10/1995): R uired: 0 Yes,applicant was notifiedarNo Received: ❑ Yes ❑ No Water Meter Fixture Unit Worksheet—Additios,Remodels and ADUs Re uired: 0 Yes,applicant was notified No / Received: El Yes 0 No DC Exemption for ADU applied for: ❑ Yes .❑"No Received: ❑ Yes ❑ No Public Facilities Improvement(PFI)Permit: Required: 0 Yes,applicant was notified YJ No Applied For: ❑ Yes ❑ No,stop intake ❑ Land Use Case#: ?G1g-V l/'— OOOO 2 ❑ Zoning: c--- ❑ Required Setbacks: Front: 1ti Rear 1 S Side: 3 Street Side: $ Garage: 2-0 ❑ Building Height: Max.Height: 5 Actual Height: 25 •5 ❑ Landscape Area: % 0 Lot Coverage Max: 00 fyo Entrance '1 Set back no more than 8'from street-facing wall 0 Parallel to street or offset 45 degrees or less Windows Minimum 12%of area of all street-facing facades Garage Garage door is behind widest street-facing wall ❑ Yes ❑ No,one of the following is met: ❑ Door extends no more than 5' from wall and there is a covered porch extending beyond garage. ❑ Door extends no more than 5' from wall and there is a 12 sq ft.window above garage on 2,d floor. ❑ Garage door width is ❑ 12'or less ❑ 50%or less of facade ❑ 60%or less and includes 7 of following: ❑ Covered porch ❑ Recessed entrance ❑ Wall offset El 1'Roof eave ❑ Roof offset ❑ Fire shingles ❑ Lap Siding ❑ Roof pitch ❑ Gable,hip,or gambrel roof ❑ Dormer ❑ Accent siding ❑ Window trim 0 Window recess ❑ Window projection ❑ Balcony Visual Clearance ❑ Urban Forestry Plan ❑ Sensitive Lands: ❑ Yes ❑ No Type: ❑ Conditions met prior to issuance of building permit Notes: 2 �pproved By Planning: Date: Revisions(after B 'lding Submittal o y) Reviewer Date Revision 1: Approved 0 Not Approved '13 J LZ Revision 2: Approved ❑ Not Approved I:\Buildingwonns\BldgPeanitRvw_REs_122419.docx Building Permit Submittal Original Submittal Date: S-7 7/2Z Site Plans: # Building Plans: # Building Permit#: nter building permit#above. Workflow Routing: et-Planningeta-Engineering ) -Permit Coordinator "'ET Building Workflow Sign-off: -Er-Sign-off for Planning(include notes from planning review) Route Application Documents: .e-Engineering: (1) copy of permit application,(1) site plan, (1)building plan and original plan review routing form. ❑ Building original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: /f.�/L���� By Permit Technician: ��/J(�lf �/(/J�/ Date: S /2_2 Engineering Review Slope at building pad: <6,i Conditions"Met"prior to issuance of building permit if.YEasements (encroachments)per engineering conditions of approval and plat 'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes I'No Assess Water Quantity Fee in-lieu: ❑ Yes Vg.No '/ LIDA Facility on lot: ❑ Yes le' No Yd Final Plat Recorded: 0 NOT Approved by Engineering: Date: Notes: ['Approved by Engineering: Date: ,__ Revisions(after BuildingSubmittal only) e Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Permit Coordinator Review Cej Conditions"Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: Revisions(after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: `�ffe SDC Exemption: 0 Received II I oes not apply ySDC Fees Entered: Wash Co Trans Dev Tax: It Yes ❑ N/A Aee • i' / fi oi I Tigard Trans SDC: II Yes 0 N/A Parks SDC: II Yes 0 N/A y11 LIDA 0 Yes V N/A (JJl v /' I rOK to Issue Permit pproved by Permit Coordinator: Vb ‘\CK( , Date: ' CO . Ze,27 I:113uildmgTonnslBldgPermitRvw RES 122419.docx