Permit FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
TIC;Ait D ', 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Allyson Armstrong DATE RECEIVEED:
DEPT: BUILDING DIVISION RECEIVE®
FROM:
Chris Roberts AUG 3 1022
CITY OF TIGARD
Taylor Morrison
COMPANY: Y BUILDING DIVIsip
PHONE: 503-313-9449
EMAIL: croberts1@taylormorrison.com
COLo
G y.) tg_ko a L-•3 }obi Zo- I-'' o01 c z,
RE: �0�� v (Permit Number)
(Site Address)
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:I Copies Description:
Copies: I Description:
Additional set(s) of plans.
x Revisions: Adding a deck.
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other (explain):
REMARKS: Bulletins to add a deck to the submitted plans.
I;&I ( 41 O -43
O,R OFFICE USE ONLY
`/C /'.LZ Initials:
Routed to Per Tit Technician: Date: [[ Amount Due:
Fees Due: Yes ❑No Fee Descript on: $
VI AG.,,-N iea/0,41— $ L'1,A $
Special
Instructions: No [] Done
Reprint Permit (per PE):/ Yes
J �a)- �urla•led �� �"� Initials: J
Applicant Notified: V Date: t �I
City of Tigard
' COMMUNITY DEVELOPMENT DEPARTMENT
Building Permit Review — Residential
TIGARD
Building Permit #: (n57 1a --' 0 j53
Site Address: 1 (0'6 (ot S ) Cpk0(6' O l h
SoJ�h Rl✓�rl -vepo ace Lot #: 2
Project Name: ( +�Planning Review ew of t�k& dW'{ L k' l
Proposal:
Verify address/suite#active in Accela. `4 In River Terrace: 0 No 'Yes,River Terrace Review Addendum
Site Plan Elements:
rosion Control
ec
copies of site plan on 8-1/2"x 11"or 11 x 17"paper oo tint of new structure(including decks)and FFE
Drawn to scale(standard architect or engineer scale) Utility locations&easements (required for new and additions)
orth arrow
Site address,project or subdivision name and lot number
idewalk/driveway approach
pplicant information(name and phone number)
s
/ hot dimensions and building setback dimensions Street tree size,type and location
quare oo Wtreet names
,9Exftstrg—tlMCMr5Trgite Corner elevations(2'contours if more than 4'differential)yp,'
i.ot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced?e[�r es ONo
impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? ?Yes ❑No
a Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995):
Required: ❑ Yes,applicant was notified t'tS)No Received: 0 Yes 0 No
Water Meter Fixture Unit Worksheet—Additions,Remodels and ADUs
Required: 0 Yes,applicant was notified , No Received: 0 Yes ❑ No
SDC Exemption for ADU applied for: 0 Yes p No
Received: 0 Yes 0 No
IA Public Facilities Improvement(PH)Permit: Applied For: ❑ Yes ❑ No,stop intake
Required: 0 Yes,applicant wasn notified �„NO � Zoning:�'
IP Land Use Case#: F P 1`"2Vn2'Y 0 (8 c Garage: 20`
�j Street Side:
go Required Setbacks: Front: 1 Z t Rear:l J5� Side: `%v,
p Building Height: Max. Height: l Actual He ht:
ALandscape Area: 2,6 % Fa) Lot Coverage Max:
Entrance M Set back no more than 8'from street-facing wall eo Parallel to street or offset 45 degrees or less
Windows 1 Minimum 12%of area of all street-facing facades
Garage Cp,ki, Garage door is behind widest street-facing wall /f2 Yes ❑ No,one of the following is met:
❑ Door extends no more than 5'from wall and there is a covered porch extending beyond garage.
❑ Door extends no more than 5'from wall and there is a 12 sq ft.window above garage on 2°floor.
,g0Garage door width is 0 12'or less eig 50%or less of facade 0 60%or less and includes 7 of following.
O Covered porch 0 Recessed entrance 0 Wall offset 0 1'Roof cave 0 Roof offset
❑ Fire shingles 0 Lap Siding 0 Roof pitch 0 Gable,hip,or gambrel roof 0 Dormer
O Accent siding D Window trim 0 Window recess 0 Window projection ❑ Balcony
!Fib Visual Clearance ia Urban Forestry Plan
® Sensitive Lands: ❑ Yes M No Type:
Condi 'o s met iprior to issuance of building permit Zo2 -CJ�CJU3
Notes: EWAUWt ylon U ii`ed ( Z
Approved By Planning: Date:
Date
Revisions (afte 'Ming Submittal only) Reviewer �13 I ZZi
Revision 1: Approved 0 Not Approved
,--.,----------Revision 2: Approved 0 Not Approved
I:lBuilding\Fotms1BldgPermitRvw_RE S_122419.docx
Building Permit Submittal
Original Submittal Date:
Site Plans: �$
Building Plans: $#
Building Permit#: ❑ Enter building permit#above.
Workflow Routing: ❑ Planning 0 Engineering 0 Permit Coordinator ❑ Building
Workflow Sign-off: 0 Sign-off for Planning(include notes from planning review)
Route Application Documents: ❑ Engineering (1) copy of permit application, (1)site plan, (1)building plan and
original plan review routing form.
❑ Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date:
En neering Review
Slope at building pad: /14i
"Conditions "Met"prior to issuance of building permit
Easements (encroachments)per engineering conditions of approval and plat
VWater Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: 0 Yes No
Assess Water Quantity Fee in-lieu: 0 Yes 'No
LIDA Facility on lot: ❑ Yes e No
', Final Plat Recorded:
❑ NOT Approved by Engineering: Date:
Notes:
Approved by Engineering: Date:
f /2a
Revisions(after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: 0 Approved 0 Not Approved
Permit Coordinator Review
Vg Conditions"Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant
Revision Notice 2: Date Sent to Applicant:
1`1 SDC Exemption: ❑ Received ❑ Does not apply
SDC Fees Entered: Wash Co Trans Dev Tax: yes ❑ N/A
Tigard Trans SDC: Yes ❑ N/A
Parks SDC: Yes ❑ N/A
LIDA 0 Yes N/A gfriM1
OK to Issue PermitI
Approved by Permit Coordinator: l ' Vp << .y C\ Date: Le -
I:\Building\Fonns\BldgPermitRvw RES_122419.docx