Loading...
Permit FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter TIC;Ait D ', 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Allyson Armstrong DATE RECEIVEED: DEPT: BUILDING DIVISION RECEIVE® FROM: Chris Roberts AUG 3 1022 CITY OF TIGARD Taylor Morrison COMPANY: Y BUILDING DIVIsip PHONE: 503-313-9449 EMAIL: croberts1@taylormorrison.com COLo G y.) tg_ko a L-•3 }obi Zo- I-'' o01 c z, RE: �0�� v (Permit Number) (Site Address) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS:I Copies Description: Copies: I Description: Additional set(s) of plans. x Revisions: Adding a deck. Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: Bulletins to add a deck to the submitted plans. I;&I ( 41 O -43 O,R OFFICE USE ONLY `/C /'.LZ Initials: Routed to Per Tit Technician: Date: [[ Amount Due: Fees Due: Yes ❑No Fee Descript on: $ VI AG.,,-N iea/0,41— $ L'1,A $ Special Instructions: No [] Done Reprint Permit (per PE):/ Yes J �a)- �urla•led �� �"� Initials: J Applicant Notified: V Date: t �I City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Residential TIGARD Building Permit #: (n57 1a --' 0 j53 Site Address: 1 (0'6 (ot S ) Cpk0(6' O l h SoJ�h Rl✓�rl -vepo ace Lot #: 2 Project Name: ( +�Planning Review ew of t�k& dW'{ L k' l Proposal: Verify address/suite#active in Accela. `4 In River Terrace: 0 No 'Yes,River Terrace Review Addendum Site Plan Elements: rosion Control ec copies of site plan on 8-1/2"x 11"or 11 x 17"paper oo tint of new structure(including decks)and FFE Drawn to scale(standard architect or engineer scale) Utility locations&easements (required for new and additions) orth arrow Site address,project or subdivision name and lot number idewalk/driveway approach pplicant information(name and phone number) s / hot dimensions and building setback dimensions Street tree size,type and location quare oo Wtreet names ,9Exftstrg—tlMCMr5Trgite Corner elevations(2'contours if more than 4'differential)yp,' i.ot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced?e[�r es ONo impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? ?Yes ❑No a Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): Required: ❑ Yes,applicant was notified t'tS)No Received: 0 Yes 0 No Water Meter Fixture Unit Worksheet—Additions,Remodels and ADUs Required: 0 Yes,applicant was notified , No Received: 0 Yes ❑ No SDC Exemption for ADU applied for: 0 Yes p No Received: 0 Yes 0 No IA Public Facilities Improvement(PH)Permit: Applied For: ❑ Yes ❑ No,stop intake Required: 0 Yes,applicant wasn notified �„NO � Zoning:�' IP Land Use Case#: F P 1`"2Vn2'Y 0 (8 c Garage: 20` �j Street Side: go Required Setbacks: Front: 1 Z t Rear:l J5� Side: `%v, p Building Height: Max. Height: l Actual He ht: ALandscape Area: 2,6 % Fa) Lot Coverage Max: Entrance M Set back no more than 8'from street-facing wall eo Parallel to street or offset 45 degrees or less Windows 1 Minimum 12%of area of all street-facing facades Garage Cp,ki, Garage door is behind widest street-facing wall /f2 Yes ❑ No,one of the following is met: ❑ Door extends no more than 5'from wall and there is a covered porch extending beyond garage. ❑ Door extends no more than 5'from wall and there is a 12 sq ft.window above garage on 2°floor. ,g0Garage door width is 0 12'or less eig 50%or less of facade 0 60%or less and includes 7 of following. O Covered porch 0 Recessed entrance 0 Wall offset 0 1'Roof cave 0 Roof offset ❑ Fire shingles 0 Lap Siding 0 Roof pitch 0 Gable,hip,or gambrel roof 0 Dormer O Accent siding D Window trim 0 Window recess 0 Window projection ❑ Balcony !Fib Visual Clearance ia Urban Forestry Plan ® Sensitive Lands: ❑ Yes M No Type: Condi 'o s met iprior to issuance of building permit Zo2 -CJ�CJU3 Notes: EWAUWt ylon U ii`ed ( Z Approved By Planning: Date: Date Revisions (afte 'Ming Submittal only) Reviewer �13 I ZZi Revision 1: Approved 0 Not Approved ,--.,----------Revision 2: Approved 0 Not Approved I:lBuilding\Fotms1BldgPermitRvw_RE S_122419.docx Building Permit Submittal Original Submittal Date: Site Plans: �$ Building Plans: $# Building Permit#: ❑ Enter building permit#above. Workflow Routing: ❑ Planning 0 Engineering 0 Permit Coordinator ❑ Building Workflow Sign-off: 0 Sign-off for Planning(include notes from planning review) Route Application Documents: ❑ Engineering (1) copy of permit application, (1)site plan, (1)building plan and original plan review routing form. ❑ Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: En neering Review Slope at building pad: /14i "Conditions "Met"prior to issuance of building permit Easements (encroachments)per engineering conditions of approval and plat VWater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes No Assess Water Quantity Fee in-lieu: 0 Yes 'No LIDA Facility on lot: ❑ Yes e No ', Final Plat Recorded: ❑ NOT Approved by Engineering: Date: Notes: Approved by Engineering: Date: f /2a Revisions(after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Permit Coordinator Review Vg Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant Revision Notice 2: Date Sent to Applicant: 1`1 SDC Exemption: ❑ Received ❑ Does not apply SDC Fees Entered: Wash Co Trans Dev Tax: yes ❑ N/A Tigard Trans SDC: Yes ❑ N/A Parks SDC: Yes ❑ N/A LIDA 0 Yes N/A gfriM1 OK to Issue PermitI Approved by Permit Coordinator: l ' Vp << .y C\ Date: Le - I:\Building\Fonns\BldgPermitRvw RES_122419.docx