Loading...
Permit (2) FOR OFFICE USE ONLY—SITE ADDRESS: Thisla eform o is recognized this form when submitting building inforrmation for plan repartments in the ounty area for view responssesrandrrevting isionsformation. asf comp This form and the information it .rovides hel.s the review .rocess and res•onse to our •ro ect. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Ihi w Transmittal Letter TUGARE, 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www' tit!ard-or.aov DATE RECEIVED: TO: Allyson Armstrong DEPT: BUILDING DIVISION RECEIVED AUG 3 202? FROM: Chris Roberts CITY OF TIGA , COMPANY: Taylor Morrison CITY DI '/ i g, PHONE. 503-313-9449 EMAIL: crobertsl@taylormorrison.com C.0 L� i �r�zzr CX� 1 a RE: tom^' (Permit Number) ( Address) c �_ chi v � ��hCc ( roject name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Co ies: Descri lion: Co des: Descri i lion: Addis a deck. XRevisions: 9 Additional sets) of plans. — Wall bracing and/or lateral analysis. _ Cross section(s) and details. Basement and retaining walls. Floor/roof framing. -- Engineer's calculations. Beam calculations. Other (explain): REMARKS: Bulletins to add a deck to the submitted plans. FO___________ OF ICE USE ONLY _ Routed to Per it Technician: Date: •Q Amount Due: Mail Fees Due: FA Yes II No Fee Descri.tion: 1011111Mill ���A.......P-11111N11 11111111111111111111111.11111111111111111 Special Instructions: 111111 • No ❑ Done Re.rint Permit •er PE : VYes �� A..licant Notified: Date: City of Tigard 1111 COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Residential TICIARD Building Permit #: 1'Ta i u' '%sn 1, Site Address: 1lo1I o Sup CvA1(17(40 (in Project Name: So'M f,VtI( `Lent( tc.e ,SA Wist Lot#: i L Planning Review WOldtrr d Proposal: S\ �,{ iiovbc Verify address/suite#active in Accela. —n River Terrace: ❑ No I&Yes,BSverTetrace&viewAddend on roston Control Site p Elements: ❑RR9med trees with drip line and tree protection measures i'1 copies es of site plan on 8-1/2"x 11"or 11 x 17"paper Foo Tint of new structure(including decks)and FFE ��Drawn to scale(standard architect or engineer scale) Uty locations&easements(required Eor new and additions) is, orth arrowie;C Sjdewallr/driveway ite address,project or subdivision name and lot number .Mid walkation do wells/septic approachp systems pplicant information(name and phone number) treat tree size,type and systems hot dimensions and building setback dimensions trees names Ettlre otage of buildings to be demolished orner elevations(2'contours if more than 4'differential) ittVIg,buildinggs on rsite 0 sf of impervious area created or replaced? Yes ❑No of area, coverage area,percentage of coverage and Q P Impervious area(applicable if R 7 R-12 R-25&R-40) If yes,is a storm water quality facility shown? es ° O Clean Water Services—Service Provider Letter(lot platted poor to 9/10R/119e9v5>d: ❑ Yes ❑ No Required: ❑ Yes,applicant was notifiedNo ❑ Water Meter Fixture Unit Worksheet-Additions,Remodels and ADU Received: ❑ Yes ❑ No Required: ❑ Yes,applicant was notified1 No Received: ❑ Yes 0 No ❑ SDC Exemption for ADU applied for: 0 Yes ❑ No iti_Public Facilities Improvement (PFI)Permit: Applied For: �1 es ❑ No,stop intake Required: 'Yes,applicant was notified 0 No Land Use Cas _, e#: � ti0�� ' 00003 Zoning: (D Side: .1 Street Side:— — Garage:�— Fr'Required Setbacks: Front: �`L Rear: N Actual Height I& Building Height: Max.Height: 95 Landscrea: Max:t Lo Coverage _ Entrance Set back no more than 8'from street-facing wall Parallel to street or offset 45 degrees or less Windows Minitrlum 12%of area of all street-Facing facades 0YespNo,one of the following is met: Garage Garage door is behind widest street-facing wall1°� g y garage ow ❑ poor extends no more than 5'from wall and there is a covered porch extendin beyond ❑ Door extends no more than 5'from wall and there is a 12 sq ft.window above garage on 2°d floor. 0 Garage door width is 0 12'or less 50°/0 or less of facade 0 60%or less and includes Roof o llo s wing: ❑ Covered porch 0 Recessed entrance 0 Wall offset 0 1'Roof eave ❑ Fire shingles ❑ Lap Siding 0 Roof pitch 0 Gable,hip,or gambrel roof 0 Dormer ❑ Accent siding ❑ Window trim 0 Window recess 0 Window projection 0 Balcony Visual Clearance7 0 U�an Sensitive Lands: ❑ Yes o Type: f�CConditions met prior to issuance of building p t 1 Notes: 6I / H Date: 5 I 2-111 2 2 Approved By Planning. I Date , Revisions(after Building Submittal only) Reviewer �j�/�/'_!� Revision 1: Approved 0 Not Approved Revision 2: /❑ Approved 0 Not Approved —_— I:\Building\Forms\BldgPermitRvw_RES_122419.docx Building Permit Submittal Original Submittal Date: S7241/22,.. Site Plans: # Building Plans: ## Building Permit#: ri nter building Workflow Routing: permit#above. � � Q.-MT-ling neering err t Coordinator eQ—Ernitdin Workflow Sign-off: 1�,d-St�'-off for Planning(include notes from planning review) g Route Application Documents: a E eerie : (1)copyof�' $ permit application, (1) site plan, (1)building plan and on i. , al plan review routing form. Lidding: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: i/ T—, ' Date: s` ,/21'-_ Engineering Review ge Slope at building pad: ,,,A/i le/Conditions "Met"prior to issuance of building permit ['Easements (encroachments)per engineering conditions of approval and plat VZ-Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes Lib. Assess Water Quantity Fee in-lieu: ❑ Yes ®�lo o LIDA Facility on lot: ❑ Yes [ No Q] Final Plat Recorded: ❑ NOT Approved by Engineering: Date: Notes: Approved by Engineering: ��Ld��2 Date: Revisions(after Building Submittal only Revision 1: 0 Approved ❑ Not Approved Reviewer Date 'Revision 2: 0 Approved ❑ Not Approved Permit Coordinator Review 4 Conditions "Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: ' Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: 4 SDC Exemption: 0 Received e Does not apply o r SDC Fees Entered: Wash Co Trans Dev Tax: yes ❑ N/A bn� °t(16e/1/14) Tigard Trans SDC: Yes ❑ N/A Parks SDC: Yes ❑ N/A LIDA ❑ Yes 7, N/A OK to Issue Permit pproved by Permit Coordinator: q)lt�i( Date: CQ ' 0 ��:Z...- 1:1Building\Fams1131dgPetmitRvw_RES 122419.docx