Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT ✓" COMMUNITY DEVELOPMENT Permit#: FPS2022-00145 � ` l €lc;A R.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/12/2022 Parcel: 2S112DA01400 Jurisdiction: Tigard Site address: 15350 SW SEQUOIA PKWY 280 Project: PCC 241 Subdivision: Lot: 2 Project Description: Add and relocate heads for TI. Contractor: WYATT FIRE PROTECTION INC. Owner: PACIFIC REALTY ASSOCIATES 9095 SW BURNHAM ATTN: N PIVEN TIGARD, OR 97223 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-684-2928 PHONE: FAX: 503-684-9657 FEES Description Date Amount Specifics: Permit Fee-COM 12/08/2022 $91.44 12%State Surcharge-Building 12/08/2022 $10.97 Type of Use: COM Plan Review-Fire Life Safety-COM 12/08/2022 $36.58 Class of Work: ADD Type of Const: I I IA Info Process/Archiving-Lg$2.00(over 12/08/2022 $2.00 Occupancy Grp: B Height: 25 ft 11x17) Stories: 1 Info Process/Archiving-Sm$0.50(up to 12/08/2022 $6.00 11x17) Commercial Sprinkler System: Sprinkler Required: Yes Sprinkler Type: Wet Standpipe Required: No Hazard: LT Density: 0.1 Design Area: 1500 K Factor: 5.6 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $146.99 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: �c %?r _ Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.