Permit CITY OF TIGARD MECHANICAL PERMIT
a q Permit#: MEC2022-01050
COMMUNITY DEVELOPMENT
Date Issued: 12/19/2022
T IGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S126CC00200
Jurisdiction: Tigard
Site address: 10069 SW CASCADE AVE
Project: Tesla Subdivision: None Lot: None
Project Description: Install(2)new rooftop units on shell building.
Contractor: VIKING HEATING&SHEETMETAL LLC Owner: 10065 SWC LLC
15779 SE JANSIK CT BY ALSTON &BIRD LLP
DAMASCUS, OR 97089 BANK OF AMERICA PLAZA
101 SOUTH TRYON ST STE 4000
CHARLOTTE, NC 28280
PHONE: 503-679-8096 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 12/19/2022 $398.51
Class of Work: NEW Type of Const: VB Plan Review 12/19/2022 $99.63
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 12/19/2022 $47.82
Stories: 1 Info Process/Archiving-Lg$2.00(over 12/19/2022 $8.00
Project Valuation: $12,000.00 11x17)
Fuel Air Handlers
Fuel Types: Natural Gas Units< 10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $553.96
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: 2 Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rul adopted by the Oregon
Utility Notification Center. Those rules
hoserules are set forth in OAR 952-001-0010 through OAR 952-001-0090. Yo a obtain a co of Reps
Issued By: 'f AIL." /ermittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available ins ection ate.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial&Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof
Note: All new commercial buildings require 2 sets of plans.
I\Building\'ermits\MEC_PdmitApp_040113.doc
2
City of Tigard RECEIVED
IIa COMMUNITY DEVELOPMENT DEPARTMENT NOV 08 2022
C
T I G A R D Building Permit Review — Commercial - g F at g ' ' ,e
Building Permit #: /14 ECD--0e?- 0 ( 0 5 C)
Site Address: /( q S/,.) CAlscA0c / Suite/Bldg#:
Project Name: -/- Lior
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review )
Proposal: -�T V
Existing Business Activity: �9��
Proposed Business Activity: /`N
erify site address/suite # exists and active in permit system
0 Riv errace Neighborhood: ❑ Yes teNo
Id oning: nu c//.
Zil ,pe`rmitted Use: IQ Yes 0 No ❑ Spec Space
0 Confirm no land use required.
ustness c .
Exists: ❑ Yes ❑ No,applicant was provided a business license application
Notes: RTU INS"1*C eY6 r 3L.'/
Approved by Planning: — ""— '. Date: ///?/Z-2
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: I1 (8/} -
Site Plans:
Building Plans: # ?-
Building Permit#: ( Enter building permit#above.
Workflow Routing: Sr Planning 0 Permit Coordinator Building
Workflow Sign-off: V Sign-off for Planning(include notes from planning review)
Route Application Documents: X Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: "' Date: I//c//.)?.
I:\Building'Porms\BldgPennitRvw_COM_NoLand vse_09072022.docx