Permit CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2022-00288
T[C„ARID 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/15/2022
Parcel: 2S102AB05200
Jurisdiction: Tigard
Site address: 9185 SW BURNHAM ST
Project: XAG Solutions Subdivision: None
Lot: None
Project Description: Cladding repair/replacement, roof repair replacement,window replacement and additions and canopy
replacement.
Contractor: PACIFIC CONSTRUCTION SOLUTIONS INC Owner: THAENN PROPERTIES LLC
PO BOX 338 11795 SW GREENBURG RD
WOODBURN, OR 97071 PORTLAND, OR 97223
PHONE: (503) 800-8049 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/12/2022 $1,160.31
Occupancy Grp: B Occupancy Load: 0 Demolition
12%State Surcharge-Building 12/12/2022 $139.24
Dwelling Units: 0 Plan Review 11/23/2022 $754.20
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 12/12/2022 $274.00
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 12/12/2022 $40.00
Value: $108,530 11x17)
Metro CET 12/12/2022 $130.24
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,497.99
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: rmittee Signature:
all 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the Job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
r
prCity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Bather Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_CObt_PcrrnitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
11 . . Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ® map&tax lot# ® project name ® site address ❑ suite number
® zoning ® applicant name ® phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
I:ABuilding\Permits\I HUI'_COM_YermitApp.doc Rev-.03/05/2019
RECEIVED
City of Tigard DEC 0 1 2022
liq �� COMMUNITY DEVELOPMENT DEPARTMENT
e DEC
OFN TIGARD����
TICARD Building Permit Review — Commercial —L `t75�9 1VIU�zone
Building Permit #: (it p -Oa P-8 0
Site Address: q) '5 St") eo\ th9TSuite/Bldg#:
Project Name: A & ,tin(:)0
(Name of commercial business occupying the space. if vacant,enter Spec Space.)
Planning Review
Proposal: ;D(j '(L I oUz Fi :DEZ ( N Ch.) t,/liVrAtJI 12t- C 114C
VAIsittP6 ' cAiIDOI Alb , Rep LAt,e -x farm uan t'y
Verify site address/suite# exists and active in permit system.
❑ r Terrace Neighborhood: ❑ Yes No
Use Case#: 'illl� 0a.^CiDitOZ
Planstch Approved Land Use:
ra Site Plan ❑ I.fredScape Plan ❑ Other:
ii an Forestry Plan Elevation Plan
: sildingHeight: Maximum Height /4 Actual Height ItM
c-1fAY��w�
ro C `dons Met: ❑ Prior to Submittal El Prior to Permit Issuance
us. ss License:
xists: ❑ Yes l� No,applicant was provided a business license application
Public Facilities Improvement (PFl) Permit:
Required: ❑ Yes,applicant was notified No Applied For: ❑ Yes ❑ No,stop intake
Notes:
Approved by Planning: Date: JJ/3h2
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved E Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal /
Original Submittal Date: (3' /! I d-,: -
Site Plans: # ,-
Building Plans: #
Building Permit#: J. Enter building permit#above.
Workflow Routing: , . Planning V Engineering Permit Coordinator L Building
Workflow Sign-off: 18:1 Sign-off for Planning(include notes from planning review)
Route Application Documents: '\�7 Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: ? Date: It)--(t /.2-ek
1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_09072022.docx
Engineering Review
YriSlope at building pad: 2�Go
• PFI Permit#:
Y.-Conditions "Met"prior to issuance of permit it(✓
[ 'Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP)
I/Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: El Yes Er No
Assess Water Quantity Fee in-lieu: El Yes Er-No
LIDA Facility on lot: ❑ Yes [ No Add Fee: ❑ Yes ❑ No
E NOT Approved by Engineering: Date
Notes:
Approved by Engineering: � i— Date: 12// (2022
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved El Not Approved
Revision 3: ❑ Approved El Not Approved
Permit Coordinator Review
Conditions "Met"prior to issuance of permit
❑ Approved,NOT Released: Date:
❑ ENG Revisions Required: Date:
Notes:
\I SDC Exemption ❑ Applied for ❑ Received ❑ Does not apply
ees Entered: - Wash Co Trans Dev Tax: ❑ Yes N/A ❑ Deferred
\b
CY\°\\(\Lt
Tigard Trans SDC: CI Yes N/A ❑ Deferred
\n Parks SDC: CIYes N/A ❑ Deferred
\\ Z- ` � LIDA Fee: ❑ Yes N/A
OK to Issue/Approved by Permit Coordinator: $ �O1\N�V Date: \
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: El Approved ❑ Not Approved
1:\Building\Forms\B1dgPennitRvw_COM_W ithLandUse_08162022.docx