Loading...
Permit CITY OF TIGARD BUILDING PERMIT ` i COMMUNITY DEVELOPMENT Permit#: BUP2022-00287 Date Issued: 12/13/2022 T i G AR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102AC01701 Jurisdiction: Tigard Site address: 12700 SW PACIFIC HWY Project: Real Property Management Solutions Subdivision: None Lot: None Project Description: Adding(2)new offices in existing warehouse. Contractor: DEGEER CONSTRUCTION Owner: GALAXY HOMES LLC 11555 SW 155TH TERRACE 12700 SW PACIFIC HWY BEAVERTON,OR 97007 TIGARD, OR 97223 PHONE: 503-329-9365 PHONE: FAX: FEES Specifics: Date Amount Description Type of Use: COM Permit Fee-Additions,Alterations, 12/13/2022 $377.90 Class of Work: ALT Type of Const: VB Demolition Occupancy Grp: B Occupancy Load: 4 12%State Surcharge-Building 12/13/2022 $45.35 Dwelling Units: 0 Plan Review 11/22/2022 $245.64 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 12/13/2022 $110.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 12/13/2022 $8.00 Value: $20,000 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $786.89 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if worlf is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notificati•• --r • Th.se rulcis are set forth in OAR 952-001-0010 through OAR 52-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 54 j • :t0.3' .23,4. Issued By: <--C% Permittee Signature: .. - Alf Call 503.639.4175 by 7:00 a.m,for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. EriCity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent (25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [I] $ 20,000 MULTIPLIER(25°A barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 5,000 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 5,000 (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ 5,000 I:AB ilding\Pemvts1,B[P_C01\1_PermitApp.dec Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T 1 v A K D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. 0 map&tax lot# ® project name © site address ❑ suite number Q zoning ® applicant name ] phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 1:ABuilding\Permits\BUP_COM_Pcrmirdpp.doc Rcv.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ° Plan Submittal Requirements equ ements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 File Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire & Rescue),if applicable. I:ABuilding\Permits\BUP_CONI_Permitapp.doc Rev.03/05/2019 RECEIVED City of Tigard 74 ' 1UZ2 ■ , COMMUNITY DEVELOPMENT DEPARTMENT Nft ' 2 TIGARD Building Permit Review — Commerciai36113i LI i&Use • Building Permit #: 3g).)-0af.-- C30a- fl Site Address: 111-o0 CIA) Taut-6c lAWy Suite/Bldg#: Project Name: ?-ect\ �i(oPe Makl t 6wi-ldns ` 1 • (Name of commercial business occupying the If vacant,enter Spec Space.) Planning Review • q Proposal: (1 . kfritd 14 Cyr Mk t0 ut (C Z nPUIoffice( AA in 014014jde OWCR . fp(er w }-Dk I milli Toney to- Existing Business Activity: O Proposed Business Activity: ( TCP Verify site address/suite#exists and active in permit system. ` 1River Terrace Neighborhood: E Yes No Zoning: MU--C41 P JK Permitted Use: ,Yes ❑ No ❑ Spec Space 0 Confirm no land use required. Business License: Exists: 0 Yes 'jNo,applicant was provided a business license application Notes: 9K -r� ow A• g(1`At, Fiimil qq ", wt InduliMlal Avoce5 Yt rf aftsed ;n toe. WAl3 dee*€4 Oz M Dp4)-19 --00oO't Approved by Planning: Date: (I t 22 ( 2L Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: Ji/ 7a Site Plans: # 3 Building Plans: # 3 Building Permit#: [2 Enter building permit#above. Workflow Routing: t(Planning D"1Sermit Coordinator 12—Building Workflow Sign-off: 4K sign-off for Planning(include notes from planning review) Route Application Documents: D-Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 1< (T \\ Date: 1(6.41.1r I:\Building\Forms\BldgPermitRvw_COM_NoLandUse 09072022.docx Permit Coordinator Review (Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: SDC Exemption ❑ Applied for ❑ Received /Does not apply zr Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A ❑ Deferred Tigard Trans SDC: ❑ Yes / N/A ❑ Deferred Parks SDC: ❑ Yes ? N/A 0 Deferred LIDA Fee: 0 Yes N/A JZirOK to Issue/Approved by Permit Coordinator: Date: 11 JfroL2_ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved I:\Building\Forms\BldgPennitRvw_COM_NoLandUse_08162022.docx