Permit CITY OF TIGARD MECHANICAL PERMIT
COMMUNITY DEVELOPMENT Permit#: MEC2022-01 1 1 0
Ttd;tiR.C]
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/14/2022
Parcel: 2S101 BB01400
Jurisdiction: Tigard
Site address: 12176 SW GARDEN PL
Project: Fastsigns Subdivision: CROW PARK 217 Lot: 2
Project Description: Installing 5 ton condensing unit and gas furnace.
Contractor: LONG BUILDING TECHNOLOGIES INC Owner: BKM PARK BC 252 LLC
5001 S ZUNI ST BY SLK GLOBAL SOLUTIONS AMERICA
LITTLETON, CO 80120 2727 LBJ FREEWAY STE 806
DALLAS,TX 75234
PHONE: 303-975-2100 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 12/09/2022 $571.23
Class of Work: ALT Type of Const: VB Plan Review 12/09/2022 $142.81
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 12/09/2022 $68.55
Stories: 1
Project Valuation: $18,800.00
Fuel Air Handlers
Fuel Types: Natural Gas Units<10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>=100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $782.59
Hoods: Comm Incinerators:
Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions)
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a co y of the rules
Issued By: o/
/ Permittee Signature: 'l // r/ i
Call 5 3.639.41 75 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
City of Tigard
14 _ 1' COMMUNITY DEVELOPMENT DEPARTMENT
Building Permit Review — Commercial - No Land Use
TIGARD
Building Permit #: lfrjfG sJ_ oat 0
Site Address: / 21 7-to S w &men/ f L. Suite/Bldg#:
Project Name: SrS Si4\S
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: ` li
Existing Business Activity: V - k
Proposed Business Activity:
Verify site address/suite # exists and active in permit sysste_m.
❑-Ri v Terrace Neighborhood: ❑ Yes El'�o
Y ng: C-V
ermitted Use: Yes ❑ No ❑ Spec Space
Confirm no land use required.
Exists: 0 Yes 0 No,applicant was provided a business license application
Notes:
Approved by Planning: --Tfirs--
Date: ///Z 3/2
Revisions (after Building Submittal only) Reviewer Date
Revision 1: D Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: ❑ Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: #//�/2Z
Site Plans: f
Building Plans: #
Building Permit#: X Enter building permit#above.
Workflow Routing: -* Planning Permit Coordinator Building
Workflow Sign-off: -K Sign-off for Planning(include notes from planning review)
Route Application Documents: ;2"-"Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: 6r47 Date: 1 1 t 5c127
l:\Building\Fonns\BldgPermitRvwCOM NolandUse_09072022.docx
Permit , oordinator Review
❑ Condition "Met"prior to issuance of permit
❑ Approved, I T Released:
Date:
❑ ENG Revisions ' equired:
Date:
Notes:
❑ SDC Exemption Applied for El Received ❑ Does not apply
❑ Fees Entered: Wa • Co Trans Dev Tax: El yes El N/A ❑ Deferred
Tigard' rans SDC: ❑ Yes ❑ N/A ❑ Deferred
Parks SD . El Yes ❑ N/A ❑ Deferred
LIDA Fee: El Yes ❑ N/A
❑ OK to Issue/Approved by Permit Coors •ator: Date:
Revisions (after Building Submittal only) Reviewer
Date
Revision 1: ❑ Approved El Not Approve.
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: 0 Approved ❑ Not Approved
L\BuildingFommBldgpertnitRvw_COM_NotandUse 08162022.docx