Loading...
Report City of Tigard Building Division 13125 SW Hall Blvd,Tigard, OR 97223 Phone: 503.718.2439 Fax: 503.598.1960RECEIVED TIGARD Inspection Line: 503.639.4175 NOV 1 2022 www.tigard-or.gov CITY OF TIGARD BUILDING DIVISION 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 14345 SW Fanno Creek Loop City: Tigard Zip: 97224 Owner's Name: Nancy Neet Date: 10-31-2022 Contractor's Name: ION Developer LLC CCB #: 230394 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation ❑ Yes qualify for the Area Located in a flood prescriptive path, follow plain/flood way? 0 No OSSC or ORSC for design requirements. Is the wind exposure Yes If Wind Exposure "Yes", qualifies for "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes x❑ Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structures other than If"Yes", qualifies for above ElYes the prescriptive path. ❑ No 1 I:Building/Forms/Photovoltaic-Checklist02-01-I l.docx Is the construction Type of material wood and does Yes the construction qualify If"Yes", qualifies for Construction as "conventional light El the prescriptive path. frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. X❑ Yes If"Yes", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for E Yes the prescriptive path. ❑ No Is the combined weight X❑ Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance Yes with Section 305.4(3) of If"Yes", qualifies for the 2010 Oregon Solar ❑ No the prescriptive path. Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood Yh one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. x❑ of composition shingle. Is the roof mounted X❑ Yes Connections of solar assembly the solar assembly connected to roof If"Yes", qualifies for ❑ No the prescriptive path. to the roof framing or blocking directly? 2 1:Building/Fonns/PhotoVoltaic-Checklist02-01-11.docx ❑ Yes If"Yes", qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? ❑ If"Yes", qualifies for Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? El Yes "Yes", qualifies for Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 inches inches qualifies for the directly to Maximum 60 inches standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? El Yes the prescriptive path. ❑ No Is the roof decking of WSP min. ''A"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12"o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes",qualifies for solar modules module to the roof X❑ Yes the prescriptive path. surface. ❑ No 3 I:/Building/Foams/Photovoltaic-Checklist02-01-1 l.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: sILFAB Model Number: SIL-380 He Listing Agency: 4 11Building/Forms/Photovoltaic-Checklist02-01-1 l.docx P-i Oi'iti Jiili iitiiiii i'iiiiiii•;4;ti -;' •ii iiii'iii'i'ii i i'iii;ii'i�'i'ii'ii'i'iiii i'iiiti L':i'i;;;1i"::iP r Signature Certificate :.•::' ..., pO;1 Reference number:56SPJ-AGKER-WQZRK-UQKHV :';•;•: 0 '.•., ••: Al Signer Timestamp �'�• ❖.� Signature y W. :; Dustin Davidson 1 ... f:X Email:dustin.davidson@ionsolar.com 1 '004 44 /� .� / 14., Sent: 31 Oct 2022 19:19:26 UTC �.�.; :: Signed: 31 Oct 2022 19:19:26 UTC V':•iS IP address:66.219.246.14- �... ' �;�; Location:Provo,United States !�• ;•��; Document completed by all parties on: :::::: ;•;•;; 31 Oct 2022 19:19:26 UTC ,•;; ,•❖� Page 1 of 1 :':•.; ,• . �♦•i .•••.•• i•i. ❖.•. ..1. a. :4d•: AN. '.•, ;';fi :•'!� •s.. 0••• :•.: SO'. .v. 0❖i i•.: ii:: .•0: ♦•• �... 4, ::: : d.. •., .•A. .4.. 5t•• .4.• ,.•• •� 0 :0•i: : ♦.. ', iii ••. MA Si..., AN �••,t• •,•,.� s❖i ..•.0' �•.. '•4 !N ♦.• ;.;0• Signed with PandaDoc '44:' :, PandaDoc is a document workflow and certified eSignature , -y' •r ;:�:;. :• ,.,0'I' solution trusted by 30,000+companies worldwide. i !El— d••.. me, i•:4, .•. ,•., .•�•�': LO.. • .•. 4•. L• ii1, $1 .1 '••� iP'•ii •'1 iii ii K.:;.i�W:1-1i�1�i�4,4 i.i�i�;.;..n�iii�iiiJi'iii iiiiitiiiiiiiiiiiii�iiii iiiiiiii'iii'iii'iiii';•;44'•