Loading...
Report ZOZ2- 002O NOTICE OF TYPE I DECISION MINOR MODIFICATION MMD2022-00030 1114 NVision PCC229 TIGARD 120 DAYS = November 23, 2022 SECTION I. APPLICATION SUMMARY FILE NAME: NVision PCC229 CASE NO.: Minor Modification (MMD) MMD2022-00030 PROPOSAL: The applicant proposes a change of use to an existing tenant space (Suite 100) at 7000 SW Redwood Lane.The tenant space is 9,157 square-foot in size. The former use was office.The proposed use is medical office. No changes arc proposed to the exterior of the building or the site. APPLICANT: GMA Architects Attn:Joseph E. Moore,AIA 240 N Broadway, Suite 203 Portland, OR 97227 OWNER: Pacific Realty Associates,LP. Attn: Sam K. Briggs 15350 SW Sequoia Parkway, Suite 300 Portland, OR 97224 LOCATION: 7000 SW Redwood Lane,Suite 100 WCTM 2S112DA,Tax Lot 700 ZONING DESIGNATION: I-P: Industrial Park zone. The I-P zone provides appropriate locations for combining light manufacturing, office, and small-scale commercial uses, such as restaurants,personal services,and fitness centers,in a campus-like setting with no nuisance characteristics such as noise,glare, odor, or vibration. APPLICABLE REVIEW CRITERIA: Tigard Community Development Code (TCDC) Chapter 18.765 Modifications SECTION II. DECISION Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request. The findings and conclusions on which the decision is based are noted in Section IV. MMD2022-00030 NVision 1 • SECTION III. BACKGROUND INFORMATION Site Information: The subject site is located at 7000 SW Redwood Lane; east of SW 72'd Avenue, south of SW Redwood Lane,and west of SW Sequoia Parkway.The 4.76-acre site is developed with three nonresidential buildings, parking, landscaping, and other associated improvements. Adjacent properties to the north, south, and cast arc zoned Industrial- Park (I-P). Adjacent properties to the west are zoned Light Industrial (I-L). The site is part of a larger business complex, Pacific Corporate Center. The site was recently approved for site and landscaping modifications (MMD2022-00015). SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS 18.765 Modifications: 18.765.060 Minor Modifications A. Definition.A minor modification has the following characteristics: 1. It has minimal impacts on surrounding properties, sensitive lands, or public facilities; and FINDING: The applicant proposes a change of use to an existing tenant space at 7000 SW Redwood Lane, Suite 100 from an office use to a medical office usc. This proposal does not include any exterior changes to the building or site and is primarily being reviewed due to the effect on off-street parking requirements. This will have no effect on surrounding properties or public facilities. The site does not contain any sensitive lands. Accordingly, staff finds the proposal will have minimal impacts on surrounding properties, sensitive lands, or public facilities. 2. It does not cause the development to go out of conformance with any applicable standard or further out of conformance if already nonconforming, except where an adjustment has been approved. FINDING: Because the proposed use requires the application of a higher parking quantity standard than the previous use, a review is required to ensure that the site as a whole continues to comply or does not go further out of conformance with the off-street vehicle parking quantity standards. The tables below calculates the minimum and maximum off-street parking spaces required for the site based on the multi- tenant formula in TCDC 18.410.030.D. The existing and proposed square footagcs and uses were provided by the applicant. Minimum Number of Parking Spaces Required Use Category Min. Multi- Existing Min. Proposed Min. Spaces/ Tenant % Square Spaces Square Spaces 1,000 SQFT Required Footage Required Footage Required Office 2.7 100% 46,155 125 36,998 100 Medical Office 3.9 85% 15,367 51 24,524 81 TOTAL 176 181 Maximum Number of Parking Spaces Allowed Use Category Max. Spaces/ Existing Max. Proposed Max. 1,000 SQFT Square Spaces Square Spaces Footage Allowed Footage Allowed Office 4.1 46,155 189 36,998 152 Medical Office 5.9 15,367 91 24,524 145 TOTAL 280 297 MMD2022-0003U NVision 2 Based on these calculations, a minimum of 181 parking spaces are required and a maximum of 297 parking spaces are allowed for the site to accommodate the proposed change of use. According to the applicant's materials the site contains 295 parking spaces, and therefore satisfies the minimum parking requirement and brings the site into compliance with the maximum parking requirement. D. Approval criteria. The approval authority will approve or approve with conditions a minor modification application when all of the following criteria are met: 1. The proposed modification qualifies as a minor modification as defined in Subsection 18.765.060.A; FINDING: As demonstrated in the findings above, this proposal qualifies as a minor modification as defined in TCDC 18.765.060.A.This standard is met. 2. If the proposal involves the modification of a condition of approval, at least one of the following criteria is met: a. The condition cannot be implemented for reasons outside the control of the applicant or property owner; b. The condition is no longer needed or warranted because circumstances have changed; or c. A new or modified condition better accomplishes the purpose of the original condition. FINDING: The applicant is not proposing to modify a condition of approval. This standard does not apply. CONCLUSION: This proposal qualifies as a minor modification to an existing development, as defined in TCDC 18.765.060.A,and is in compliance with all applicable standards of this Title. SECTION V. PROCEDURE AND APPEAL INFORMATION Notice: Notice was posted at City Hall and mailed to: X The applicant and owners Final Decision: A minor modification is a Type I procedure. As such, this decision is final for purposes of appeal on the date it is mailed or otherwise provided to the applicant, whichever occurs first. This decision is not appealable locally and is the final decision of the City. THIS DECISION IS FINAL ON AUGUST 11, 2022 AND BECOMES EFFECTIVE ON AUGUST 12, 2022 Questions: If you have any questions, please contact Gino Victoria at (503) 718-2680 or Gino.Victoria@tigard- or.gov. August 11, 2022 APPROVED BY: Gino Victoria,Assistant Planner Community Development Director's Designee MMD2022-00030 NVision 3 TDT/TSDC Estimate 11/16/2022 7000 SW Redwood BUP2022-00208 HMP TDT& RESIDENTIAL TSDC RATES EFFECTIVE 7/1/22 NON-RES:TSDC CITYWIDE EFFECTIVE 7/1/22 0 Yes Project is in River Terrace ? (I) No * For TDT and residential formula has been replaced with published rate per unit. Former Use ITE Rate per Rate per TDT/TSDC Rate Type Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 710 $10,494 9.16 $96,093.56 9,157 sf gen office TSDC-Imp 1 710 1.49 $10,330 $15,392 9.16 $72,681.42 TSDC-Reim 1 710 1.49 $596 $888 9.16 $4,193.43 TSDC-RT 1 0 $0 0.00 $0.00 TDT 2 0 $0 0.00 $0.00 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 $0 0.00 $0.00 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 No Total TDT and TSDCs Former Uses $172,968 Proposed Use ITE Rate per Rate per TDT/TSDC Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 710 $10,494 9.16 $96,093.56 Considered office fof� TSDC-Imp 1 710 1.49 $10,330 $15,392 9.16 $72,681.42 (i% �"' t'� etic TSDC-Reim 1 710 1.49 $596 $888 9.16 $4,193.43 S'.)tL%€Ai t TSDC-RT 1 0.00 $0 $0 0.00 $0.00 KX(4-" M ��/C@ � TDT 2 0.00 $0.00 •J 3 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 0.00 $0 $0 0.00 $0.00 TDT 3 0.00 $0.00 TSDC-Imp 3 0.00 $0 0.00 $0.00 TSDC-Reim 3 0.00 $0 0.00 $0.00 TSDC-RT 3 0.00 $0 0.00 $0.00 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 No Use 3 No Total All TDTs&TSDCs Proposed Uses $172,968.40 Less: Total All TDTs &TSDCs Former Uses $172,968.40 Total All TDTs&TSDCs Net Increase $0.00 Total Net County TDT $0.00 No TDT Total Net TSDC-Imp $0.00 Total Net TSDC-Reim $0.00 Total Net TSDC RT Overlay $0.00 TDT TSDC Imp + Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $0 $0 Estimated Unmitigated Impact $0 $0 All TDT&TDSC TSDC RT Overlay Target Recovery Rate #DIV/0! 30% Estimated Total Impact $0 $0 Estimated Unmitigated Impact $0 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Extended Combination SDC Calculator-091018-I:\Community Development\Permit Coordinator\SDC Calculators TDT/TSDC Estimate 9/14/2022 7000 SW Redwood BUP2022-00208 AML 1 TDT&RESIDENTIAL TSDC RATES EFFECTIVE 7/1/22 NON-RES:TSDC CITYWIDE EFFECTIVE 7/1/22 �`� 0 Yes Project is in River Terrace ? QQ No (, \L 5 * For TDT and residential formula has been replaced with published rate per unit. `� p C Former Use ITE Rate per Rate per TDT/TSDC \� )CiCyl\ Rate Type Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 710 $10,494 9.16 $96,093.56 9,157 sf gen office TSDC-Imp 1 710 1.49 $10,330 $15,392 9.16 $72,681.42 TSDC-Reim 1 710 1.49 $596 $888 9.16 $4,193.43 TSDC-RT 1 0 $0 0.00 $0.00 TDT 2 0 $0 0.00 $0.00 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 $0 0.00 $0.00 Did total TSDC need to be reduced to 80% of TDT? Use 1 Yes Use 2 No Total TDT and TSDCs Former Uses $172,968 Proposed Use ITE Rate per Rate per TDT/TSDC Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 630 $28,099 9.16 $257,302.54 Converted to 9,157 TSDC-Imp 1 630 3.99 $10,330 $41,217 9.16 $194,613.60 clinic TSDC-Reim 1 630 3.99 $596 $2,378 9.16 $11,228.43 TSDC-RT 1 0.00 $0 $0 0.00 $0.00 TDT 2 0.00 $0.00 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 0.00 $0 $0 0.00 $0.00 TDT 3 0.00 $0.00 TSDC-Imp 3 0.00 $0 0.00 $0.00 TSDC-Reim 3 0.00 $0 0.00 $0.00 TSDC-RT 3 0.00 $0 0.00 $0.00 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 No Use 3 No Total All TDTs &TSDCs Proposed Uses $463,144.58 Less: Total All TDTs&TSDCs Former Uses $172,968.40 Total All TDTs&TSDCs Net Increase $290,176.17 Total Net County TDT $161,208.99 Total Net TSDC-Imp $121,932.18 Total Net TSDC-Reim $7,035.00 Total Net TSDC RT Overlay $0.00 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $575,746 $429,891 Estimated Unmitigated Impact $414,537 $300,923 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 29% 30% Estimated Total Impact $1,005,637 $0 Estimated Unmitigated Impact $715,461 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Extended Combination SDC Calculator-091018-I:\Community Development\Permit Coordinator\SDC Calculators TDT & TSDC Discounts 9/14/2022 7000 SW Redwood 'aU p/4)Z.,Z r AM L Adjustment for TDT Change-in-Use Discount Building Age: 20 Years (2001) $257,302.54 TDT Proposed Use $96,093.56 TDT Prior Use $161,208.99 TDT Pre-Discount 9,157 Total Square Feet(Enter) 5,000 Square Feet Eligible for Discount Enter) 54.60% Eligible as%of Total Square Feet $88,025.00 TDT on eligible sq.ft. 29 Age of Building (Enter) 75% Percentage discount $66,018.75 Discount: 75%/20 years; 50%/3 years. $95,190.24 Revised TDT Post-Discount Adjustment to TSDC if greater than 80% of TDT $205,842.03 Total TSDC Proposed Use $76,874.85 Total TSDC Prior Use $128,967.19 Total TSDC Pre-Discount Yes Does 80% maximum TSDC Apply? $76,152.19 Total TSDC Post-Discount Plus Application of TOD Discount if Relevant. Enter amount of TOD Discount, if any. $121,932 Revised TSDC-I after TOD $7,035 Revised TSDC-R aafter TOD $0 Revised TSDC-RT after TOD $128,967 Net Revised Total TSDC after TOD -$52,815 TOD Discount $224,157 Revised Total TDT&TSDC after TOD Total TSDC-1 Pre-80% Discount $121,932.18 Total TSDC-R Pre-80% Discount $7,035.00 TOTAL $128,967.19 Total TSDC Post-80% Discount Revised TSDC-I $71,998.18 Revised TSDC-R $4,154.01 $76,152.19 I L/'/l K ITTELSON 851SW 6th AVENUE,SUITE 600 \` & ASSOCIATES P PORTLAN 204 503.28.52330 g7F 503.273.8169 MEMORANDUM Date: November 4, 2022 Project#: 28423 �&.D PROFFssi To: Paul Hernandez, NVISION (� F,N GINEF9 04 Cc: Matt Oyen and Dick Krippaehne, PacTrust e 93661PE Pprtelly wed ey« uy orv.c=us, Kristine Connolly='1=°' From: Kristine Connolly, PE, Chris Brehmer, PE, & Carla K eyn ans ORE019f�"'"' za Project: NVISION Tigard (BUP2022-00208) 9/s 4,4y 8, 2 ��� rINfM. CD�� Subject: Trip Generation for TDT and TSDC Assessment EXPIRES:12/31/2023 Kittelson & Associates, Inc. (Kittelson) performed a trip generation study of the existing NVISION facility located at 9975 SW Nimbus Avenue in Beaverton, Oregon. The existing business is to be relocated to a building located at 7000 SW Redwood Lane in Tigard, Oregon.This memorandum presents the results of a trip generation analysis prepared to inform the Washington County Transportation Development Tax (TDT) and City of Tigard Transportation System Development Charges (TSDC) assessments associated with the proposed site in Tigard. NVISION Trip Generation Both the County TDT Ordinance and the City TSDC assessments are predicated on trip generation estimates developed using different editions of the nationally recognized Institute of Transportation Engineers' (ITE) Trip Generation Manual'. Based on our review, there is no land use category provided within past editions or the current Trip Generation Manual, 11th Edition (Reference 1) that is directly representative of the NVISION facility. The TDT and TSDC calculations provided by the City of Tigard'classified NVISION under ITE land use code 630 — Clinic. A clinic is described in the ITE Trip Generation Manual as "a facility that provides limited diagnostic and outpatient care but is unable to provide prolonged in-house medical and surgical care". NVISION is an eye specialist facility with general consultations and laser eye surgery. While initial ' The Washington County TDT is based on the Trip Generation Manual, 7`^ Edition (source: https://www.washingtoncountyor.gov/lut/documents/tdt-procedures-manual)while the City of Tigard TSDC is based on the Trip Generation Manual,9`h Edition. 2 Refer to Attachment A FILENAME H:128128423- TIGARD NVISION TRIP GENERA TIONIREPORTI FINAL 128423 TRIPGENERATION MEMO 11-04-2022.DOCX NVISION Tigard—Trip Generation Project#:28423 November 4,2022 Page 2 selection of "clinic" as a representative land use is understandable, our review of the comparatively smaller size and patient capacity of NVISION limit the peak hour trip generation potential of the facility as compared to a typical clinic with an average size of approximately 20,000 SF. Given the lack of representative land uses in the Trip Generation Manual, the trip generation of the existing NVISION facility in Beaverton (to be relocated to the proposed site in Tigard) was measured to provide a better understanding of site trips to inform the TDT and TSDC calculations. All vehicle trips entering and existing the existing NVISION facility were counted for three consecutive midweek days in October 2022 between the hours of 7:00- 9:00 AM and 4:00—6:00 PM. The three-day average morning peak hour and evening peak hour trip counts were measured to be: • Average AM peak hour rate: 1.18 trips per 1,000 SF • Average PM peak hour rate: 0.91 trips per 1,000 SF The traffic count data is included as Attachment B. The City's TSDC trip rates are based on the average weekday PM peak hour rates while the County TDT is predicated on daily trip generation. Both fee programs allow for a trip credit for the existing building use. TDT and TSDC Assessment Table 1 provides a suggested calculation of the City TSDC assessment for the site under the former general office use (using Trip Generation Manual, 9th Edition) and the measured NVISION use. For TDT assessment purposes, the selection of land use categories is limited3. Given the measured NVISION peak hour trip generation is less than the general office trip rates for the same period and reviewing the land use options available per the TDT Procedures Manual, one could conclude that the daily trip rate of NVISION should also be less than or equal to that of a general office use and thus a general office use classification could be assumed for NVISION assessment purposes. 3 Per Section 3.17.050 of the Countywide Transportation Development Tax Procedures Manual:"In the event the Director determines that a particular use does not have a basis for TDT calculation stated in Appendix B the Director shall either: 1. Determine the TDT based on the use listed in Appendix B most similar in trip generation; or 2. At the election (and expense) of the applicant, consider an alternate TDT based on a traffic study to estimate the weekday average person trip generation of a same or similar use verified by a registered traffic engineer. In the event an alternate TDT is utilized, the Director may make such adjustments as deemed applicable in consideration of location,size and other appropriate factors."We recommend use of the General Office trip category as the land use listed in Appendix B most similar in trip generation based on the measured NVISION trip rates. Kittelson&Associates,Inc. Portland,Oregon NVISION Tigard—Trip Generation Project#:28423 November 4,2022 Page 3 Table 1:TDT and TSDC Calculations Charges PM Peak Hour Vehicle Trip Ends(PHVT) Rate per PHVT Rate per unit Number of units Amount TDT $10,494' 9.16 $96,125.04 TSDC—Improvement 1.49 $10,330' 9.16 $140,987.97 TSDC—Reimbursement 1.49 $596' 9.16 $8,134.45 Total Former Use Charges $245,247.46 Proposed NVISION Use TDT $10,494' 9.16 $96,125.04 TSDC—Improvement 0.91 $10,330' 9.16 $86,106.75 TSDC—Reimbursement 0.91 $596' 9.16 $4,968.02 Total Proposed Use Charges $187,199.81 Total Net Charges(Proposed NVISION Use—Former Office Use) ($58,047.65) 'TDT Rate Table(Reference 2).Although the trip rate for the proposed NVISION use is lower than the trip rate for the former office use,the TDT rate for office was conservatively applied to the proposed use. 'Fees&Charges Schedule(Reference 3) As shown in Table 1, the suggested TDT and TSDC calculations for the proposed NVISION use are lower than the credits calculated for the former office use.Thus, no additional charges should be required for the proposed use (note that neither the City nor County offer refunds in the event that a new use generates fewer trips than a prior use). We trust that this memorandum adequately addresses the trip generation of the proposed NVISION facility and offers a reliable basis for assessing the TDT and TSDC charges for the site. Please contact us if you have any questions or comments. REFERENCES 1) Institute of Transportation Engineers. Trip Generation Manual, 11t1'Edition. 2021. 2) Washington County. TDT Rate Table. Fiscal Year 2022-2023. 3) City of Tigard. Fees& Charges Schedule. Fiscal Year 2022-2023. ATTACHMENTS A. City of Tigard TDT&TSDC Charges B. Traffic Count Data Kittelson&Associates,Inc. Portland,Oregon Attachment A: City of Tigard TDT & TSDC Charges CITY OF TIGARD FEE AND PAYMENT HISTORY - 4 it 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 T[GA.RD BUP2022-00208 - 7000 SW REDWOOD LN, TIGARD, OR 97224 NVision Fee Description Revenue Fee Amount Invoiced Paid Date Paid Payment Receipt# Due Account Number Method 12%State Surcharge-Building 100-0000-24001 $425.08 $425.08 $0.00 $425.08 Additional Plan Review 230-0000-43106 $597.30 $597.30 $0.00 $597.30 DC Provision Review, COM TI-Ping 100-0000-43112 $434.00 $434.00 $0.00 $434.00 Info Process/Archiving-Lg $2.00 (over 230-0000-43135 $14.00 $14.00 $0.00 $14.00 11x17) Permit Fee-Additions,Alterations, 230-0000-43104 $3,542.31 $3,542.31 $0.00 $3,542.31 Demolition Plan Review 230-0000-43106 $1,705.20 $1,705.20 $1,705.20 8/15/2022 Credit Card 441970 $0.00 Plan Review Addl-Fire Life Safety 230-0000-43108 $1,416.92 $1,416.92 $0.00 $1,416.92 Tigard Trans SDC Improvement 415-0000-43300 $71,998.18 $71,998.18 $0.00 $71,998.18 Tigard Trans SDC Reimbursement 415-0000-43301 $4,154.01 $4,154.01 $0.00 $4,154.01 Wash Co Trans Dev Tax 405-0000-43320 $95,190.24 $95,190.24 $0.00 $95,190.24 Totals for Fees $179,477.24 $179,477.24 $1,705.20 $177,772.04 Receipt# Payment Method Check# Pavor: Receipt Date Receipt Amount 441970 Credit Card anonymous 08/15/2022 $1,705.20 Total Payments: $1,705.20 Balance Due: $177,772.04 Attachment B: Traffic Count Data a,..7. 40.. ,, Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/18/2022 Site Code: 15981601 Start Time Entering Exiting 7:00 AM 0 0 7:05 AM 1 0 7:10 AM 0 0 7:15 AM 0 0 7:20 AM 1 0 7:25 AM 0 0 7:30 AM 0 0 7:35 AM 0 0 7:40 AM 0 0 7:45 AM 0 0 7:50 AM 2 0 7:55 AM 3 0 8:00 AM 0 0 8:05 AM 1 1 8:10 AM 2 0 8:15 AM 0 0 8:20 AM 1 0 8:25 AM 0 0 8:30 AM 0 0 8:35 AM 0 0 8:40 AM 1 0 8:45 AM 0 0 8:50 AM 0 0 8:55 AM 0 0 Total 12 1 Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/18/2022 Site Code: 15981602 Start Time Entering Exiting 4:00 PM 1 0 4:05 PM 0 0 4:10 PM 0 0 4:15 PM 0 0 4:20 PM 0 0 4:25 PM 0 1 4:30 PM 0 1 4:35 PM 0 1 4:40 PM 0 0 4:45 PM 0 0 4:50 PM 0 0 4:55 PM 0 1 5:00 PM 0 2 5:05 PM 0 1 5:10 PM 0 0 5:15 PM 0 1 5:20 PM 0 0 5:25 PM 0 0 5:30 PM 0 0 5:35 PM 0 0 5:40 PM 0 0 5:45 PM 0 0 5:50 PM 0 0 5:55 PM 0 0 Total 1 8 Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/19/2022 Site Code: 15981603 Start Time Entering Exiting 7:00 AM 2 0 7:05 AM 0 0 7:10 AM 0 0 7:15 AM 0 0 7:20 AM 0 0 7:25 AM 0 0 7:30 AM 0 0 7:35 AM 0 0 7:40 AM 0 0 7:45 AM 0 0 7:50 AM 0 0 7:55 AM 1 0 8:00 AM 0 0 8:05 AM 0 0 8:10 AM 1 0 8:15 AM 1 0 8:20 AM 0 0 8:25 AM 0 0 8:30 AM 0 0 8:35 AM 0 0 8:40 AM 0 1 8:45 AM 2 0 8:50 AM 0 0 8:55 AM 0 0 Total 7 1 Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/19/2022 Site Code: 15981604 Start Time Entering Exiting 4:00 PM 0 0 4:05 PM 0 0 4:10 PM 0 0 4:15 PM 0 0 4:20 PM 0 1 4:25 PM 0 1 4:30 PM 0 0 4:35 PM 0 1 4:40 PM 0 0 4:45 PM 0 0 4:50 PM 0 1 4:55 PM 0 1 5:00 PM 0 0 5:05 PM 0 1 5:10 PM 0 0 5:15 PM 0 0 5:20 PM 0 0 5:25 PM 0 0 5:30 PM 0 0 5:35 PM 0 0 5:40 PM 0 0 5:45 PM 0 0 5:50 PM 0 0 5:55 PM 0 0 Total 0 6 vw► Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/20/2022 Site Code: 15981605 Start Time Entering Exiting 7:00 AM 0 0 7:05 AM 0 0 7:10 AM 0 0 7:15 AM 0 0 7:20 AM 0 0 7:25 AM 0 0 7:30 AM 0 0 7:35 AM 0 0 7:40 AM 0 0 7:45 AM 0 0 7:50 AM 0 0 7:55 AM 0 0 8:00 AM 1 0 8:05 AM 0 0 8:10 AM 1 0 8:15 AM 0 0 8:20 AM 0 0 8:25 AM 1 0 8:30 AM 1 0 8:35 AM 0 0 8:40 AM 1 0 8:45 AM 0 0 8:50 AM 0 1 8:55 AM 0 0 Total 5 1 Quality Counts DATA THAT DRIVES COMMUNITIES Location: Beaverton INVISION Front Door Date: 10/20/2022 Site Code: 15981606 Start Time Entering Exiting 4:00 PM 0 0 4:05 PM 0 0 4:10 PM 0 1 4:15 PM 0 0 4:20 PM 0 1 4:25 PM 0 0 4:30 PM 0 0 4:35 PM 0 0 4:40 PM 0 0 4:45 PM 0 0 4:50 PM 0 0 4:55 PM 0 0 5:00 PM 0 0 5:05 PM 0 0 5:10 PM 0 0 5:15 PM 0 2 5:20 PM 0 0 5:25 PM 0 0 5:30 PM 0 0 5:35 PM 0 0 5:40 PM 0 0 5:45 PM 0 0 5:50 PM 0 0 5:55 PM 0 0 Total 0 4 3-dav Average Trip Generation Rate Current GFA 6,200 Future GFA 9,157 W.I.3-day average trips per hour 3-day Average Trip Rate per Four PM 34ay average trips per hour 3-day Average Trip.Rete per.hour 06:05-07.05 0.11 03:05-04.05 0 0.05 06:10-07:10 0.16 03:10-04:10 0 0.05 06:15-07:15 0.16 03.15-04:15 1 0.11 06:20-07:20 0.16 03:20-04:20 1 0.11 06:25-07:25 0.22 03:25-04:25 1 0.22 06:30-07:30 0.22 03:30-04:30 - 2 0.32 06:35-07:35 0.22 03:35-04:35 2 0.38 06:40-07:40 0.22 03:40-04:40 3 0.48 06:45-07:45 0.22 03:45-04:45 3 0.48 06:50-07:50 0.22 03:50-04:50 3 0.48 06:55-07:55 2 0.32 03:55-04:55 3 0.54 07:00-08:00 3 0.54 04:00-05:00 4 0.65 07:05-08:05 3 0.48 04:05-05:05 4 0.70 07:10-08:10 3 0.54 04:10-05:10 5 0.81 07:15-08:15 5 0.75 04:15-05:15 5 0.75 07:20-08:20 5 0.81 04:20-05:20 6 0.91 07:25-08:25 5 0.81 04:25-05:25 5 0.81 07:30-08:30 5 0.86 04:30-05:30 4 0.70 07:35-08:35 6 0.91 04:35-05:35 4 0.65 07:40-08:40 6 0.91 04:40-05:40 3 0.54 07 45-08:45 7 1.08 04:45-05:45 3 0-54 07:50-08:50 7 1.18 04:50-05:50 3 0.54 07:55-08:55 7 1.13 04:55-05:55 3 0.48 08:00-09:00 6 0.91 05:00-08:00 2 0.38 10/5/22, 1:01 PM Fee List BUP2022-00208 - NVision Menu Add Delete Void Invoice Invoice&Pay ReCalc Help Fee Celt.Factor: Job Value(Contraclor)$503,635.00 v Fee Total $177,483.17 Showing 1-9 of 9 ❑ lmookeit Date Assessed pee Item uanlity, pact Fees Status Adjusted Balance Due Notes Subgroup D 09/21/2022 Wash Co Trans Dev Tax 95,190.24 Dollar Amt $95,190.24 NEW $95,190.24 ❑ 09/21/2022 Tigard Trans SDC Improvement 71.998.18 Dollar Amt $71,998.18 NEW $71,998.18 ❑ 09/21/2022 Tigard Trans SDC Reimbursement 4,154.01 Dollar Amt $4,154.01 NEW $4,154.01 ❑ 233172 08/15/2022 Plan Review 1 Each $1,705.20 INVOICED $0.00 BPERMIT O 233598 08/17/2022 DC Provision Review COM TI-Ping 1 Each $434.00 INVOICED $434.00 ❑ 233598 08/17/2022 plan Review-Fire Life Safely 1 Each $1,049.35 INVOICED $1,049.35 BPERMIT ❑ 233598 08/17/2022 Info Process/Archiving_L9$2.00(over 11x17) 7 Each $14.00 INVOICED $14.00 ❑ g33598 08/15/2022 Permit Fee-COM r, 11 New Construction ) 1 Each $2,623.38 INVOICED $2,623.38 BPERMIT,SURTAX ❑ 233598 08/15/2022 12%State Surcharge-Building G��t1 Each �\$314.81 INVOICEDI/ � $314.81 SURTAX • Page 1 of1 � 40 se -jTIJG/.l %u `Gv:'�''`.,I'� 1 I4 1r.`�,c,L_ �c q / C\ (), a �evQ �— irk 7,- - 2 i^�ya _-3\ https://tigard-proday.accela.com/portlets/web/en-us/#/core/spacev360/tigard.bup202200208 1/1