Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
8uPz02.2.- 0o208 /000 SW REDWOOD Lti) COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate office COPY RECEIVED Project Information Energy Code: 90.1 (2019) Standard AUG T 5 'AR Project Title: NVision Redwood Lane CITY OF TIGARD Project Type: Alteration BUILDING DIVISION' • Construction Site: Owner/Agent: Designer/Contractor: Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts /ft2 Watts 1-Eyecare Clinic (Office) 9157 0.64 5860 Total Allowed Watts = 5860 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Eyecare Clinic (Office. 9157 sq.ft.) LED: A: LED Troffer: LED Panel 33W: 1 64 33 2112 LED: C/E: LED Recessed Downlight: LED Other Fixture Unit 16W: 1 30 16 480 LED: UC: LED Undercabinet: LED Undercabinet Unit 4W: 4 17 16 272 Total Proposed Watts= 2864 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2019) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. $p I l.E'4 13 , DPI G NIEIe �`� ly In Name-Title Signature Date Project Title: NVision Redwood Lane Report date: 07/12/22 Data filename: Page 1 of 5 COMcheck Software Version COMcheckWeb Inspection Checklist I Energy Code: 90.1 (2019) Standard Requirements: 15.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID' '4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ENot Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies 9.4.3, 9.7 calculations provide all information EDoes Not [PR4]1 with which compliance can be ❑Not Observable determined for the interior lighting and electrical systems and equipment ElNot Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices, Additional Comments/Assumptions: 1 High Impact (Tier 1) r2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: NVision Redwood Lane Report date: 07/12/22 Data filename: Page 2 of 5 Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and EComplies Requirement will be met. [EL10]2 20-Amp receptacles are controlled by ❑Does Not an automatic control device. ❑Not Observable ❑Not Applicable '8.4.3 New buildings have electrical energy ❑Complies Exception: Individual tenant spaces less than 10,000 ft2. [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable buildings with a digital control system ENot Applicable the energy use is transmitted to to control system and displayed graphically. 9.4.1.1 Automatic control requirements EComplies [ELi)2 prescribed in Table 9.6.1, for the ❑Does Not appropriate space type, are installed. LiNot Observable Mandatory lighting controls (labeled as 'REQ') and optional choice controls ENot Applicable (labeled as'ADD1' and 'ADD2') are implemented. 9.4.1.1a Independent lighting controls installed EComplies [EL2]2 per approved lighting plans and all ❑Does Not manual controls readily accessible and visible to occupants. ❑Not Observable ENot Applicable 9.4.1.1b No lighting shall be automatically EComplies [EL26]2 turned on- restriced to manual. ❑Does Not ❑Not Observable ENot Applicable 9.4.1.1c <= 50%of general lighting power EComplies [EL27]2 shall be allowed to be automatically ❑Does Not turned on. [Not Observable ❑Not Applicable 9.4.1.1d Bilevel lighting control- <= 50%of EComplies [EL28]2 general lighting controlled with one ❑Does Not intermediate step between full off and full on. [Not Observable ENot Applicable 9.4.1.1e Automatic daylight responsive EComplies [EL29]2 controls for sidelighting >= 150 watts ❑Does Not controlled by photocontrols. ENot Observable ENot Applicable 9.4.1.1f Automatic daylight responsive ❑Complies [EL30]2 controls for toplighting >= 150 watts ❑Does Not controlled by photocontrols. ❑Not Observable ❑Not Applicable 9.4.1.1g Automatic partial OFF: lighting shall ❑Complies [EL31]2 be reduced >= 50%within 20 minutes ❑Does Not of zero occupancy. DNot Observable ❑Not Applicable 9.4.1.1h Automatic full OFF: lighting shall be ❑Complies [EL32]2 shut off within 20 minutes of zero ❑Does Not occupancy. ❑Not Observable ❑Not Applicable 9,4.1.1i Scheduled shutoff: all lighting shall be DComplies [EL33I2 shut off when scheduled to be ❑Does Not unoccupied. ENot Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact (Tier 3) Project Title: NVision Redwood Lane Report date: 07/12/22 Data filename: Page 3 of 5 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 9.4.1.3 Separate lighting control devices for EComplies [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: NVision Redwood Lane Report date: 07/12/22 Data filename: Page 4 of 5 Section Final Inspection Complies? i Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies [F116]3 electric power systems within 30 days ❑Does Not of system acceptance. ['Not Observable ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies [FI17]3 systems and equipment to the ❑Does Not building owner or designated representative. ENot Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture Complies See the Interior Lighting fixture schedule for values. (F118)1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts [Not Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75%of all permanently ❑Complies - [F120J1 installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a >= 45 Im/W total luminaire efficacy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3) Project Title: NVision Redwood Lane Report date: 07/12/22 Data filename: Page 5 of 5 CITY OF TIGARD BUILDING PERMIT , COMMUNITY DEVELOPMENT Permit#: BUP2022-00208 T f G A R.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/1/2022 Parcel: 2S112DA00700 Jurisdiction: Tigard Site address: 7000 SW REDWOOD LN Project: NVision Subdivision: PACIFIC CORPORATE CENTER Lot: 3 Project Description: TI for new vision care clinic Contractor: HUMPHRIES CONSTRUCTION Owner: PACIFIC REALTY ASSOCIATES LP 758 LAUREL PL ATTN: N PIVEN ALBANY, OR 97321 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 541-223-3323 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Plan Review 08/15/2022 $1,705.20 Occupancy Grp: B Occupancy Load: 51 DC Provision Review,COM TI-Ping 11/23/2022 $434.00 Dwelling Units: 0 Info Process/Archiving-Lg$2.00(over 11/23/2022 $14.00 11x17) Stories: 0 Height: 0 ft Permit Fee-Additions,Alterations, 11/23/2022 $3,542.31 Bedrooms: 0 Bathrooms: 0 Demolition Value: $503,635 Additional Plan Review 11/23/2022 $597.30 12%State Surcharge-Building 11/23/2022 $425.08 Plan Review Addl-Fire Life Safety 11/23/2022 $1,416.92 Floor Areas: Plan Review 11/23/2022 $597.30 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $8,732.11 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may oy opy,of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 i00 a.m.for the next available inspection-date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. • Building Permit Application Commercial r ```' +' FOR OFFICE/ USE ONLY �/� Q City b REC�1 Y `$ DateBya ���5 �� � � t..�W [7.G -��i�lU� of Tigard Permit No.:-.1 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503-718-2439 Fax: 503-598-1960 �UG 1 a ?��? Date/8y: g' ��' `�� Related Permit: TIGARD Inspection Line: 503-639-4175 ITY OF TIGAR Date Ready/By: { Sr: Scc Page 2 fur a Internet: www.tigard-or.gov C D Notified/Method:/D/SIde Vt/4 Supplemental Information BUILDING DIVISI01\ TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ID Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑X Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. dwellingValuation: $ ❑ 1-and 2-family El ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7000 SW Redwood Lane New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suiteibldg./apt.4: Project name: NVision Redwood Lane Covered porch area: square feet Cross street/directions to job site: Deck area:. square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot 4: Permit fees*are based on the value of the work performed. Tax map/parcel#: 25 1 12DA 00700 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Tenant improvement of existing building for eyecare clinic. Valuation: $ 503,635 Design-build MEP, No new building area, no change of occupancy Existing building area: 9,157 square feet New building area: 0 square feet Di] PROPERTY OWNER ❑ TENANT Number of stories: 1 Name: PacTrust Type of construction: 5BS Address: 15350 SW Sequoia Parkway Occupancy groups: City/State/ZIP: Portland, OR 97224 Existing: B Phone:( 503)624-6300 Fax:( ) New: B - Medical t7 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: GMA Architects (Please refer to fee schedule) Structural plan review fec(or deposit): i r70 5. ac' Contact name; Joseph E Moore, AIA FLS plan review fee(if applicable): Address: 240 N Broadway, Ste 203 Total fees due upon application: City/State/ZIP: Portland, OR 97227 Amount received: Phone:( 503)687-5777 Fax: :( ) PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: imoore@gma-arch.com ' Commercial and residential prescriptive installation of . CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: Humphries Construction LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 7S� u,/G(fi Solar Installation Specialty Code checklist. City/State/ZiP: �j� Permit fee(includes plan review "' �� r�Y , 7.s'L1 and administrative fees): $180.00 Phone:(541)223-3323 x:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: 219323 Wi Total fee due upon application: $201.60 Authorized sign‘ 41 if / / This permit application expires iI a permit is not obtained �t within 180 days after it has been accepted as complete. Print name: Nialli ) Date: I * Fee methodology set by Tn-County Building Industry Service Board. I:\Building\Permit6\B h _ _ -l •pp.doc Rev.04/21/2014 440-4613T(1 t/02/COM/WEB) FrilCity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT il Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD® 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations arc disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 503,635 MULTIPLIER(25%barrier removal requirement): x )5 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 125,908 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ Existing (b) An accessible entrance: $ Existing (c) An accessible route to the altered area: $ 55,000 (d) At least one accessible restroom for each sex or a single unisex restroom: $ Existing, 12,000 (e) Accessible telephones: $ N/A (I) Accessible drinking fountains:and, $ N/A (g) When possible,additional accessible elements such as storage and alarms: $ 36,000 TOTAL(shall equal line [2] of Valuation Computation): $ 103,000 note: all other provided elements existing accessible, no other valuation I:\,Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 71 q CITY OF TIGARD FEE AND PAYMENT HISTORY 2 ' • 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 TIGARD BUP2022-00208 - 7000 SW REDWOOD LN, TIGARD, OR 97224 NVision Fee Description Revenue Fee Amount Invoiced Paid Date Paid Payment Receipt# Due Account Number Method 12%State Surcharge-Building 100-0000-24001 $425.08 $425.08 $0.00 $425.08 Additional Plan Review 230-0000-43106 $597.30 $597.30 $0.00 $597.30 DC Provision Review, COM TI-Ping 100-0000-43112 $434.00 $434.00 $0.00 $434.00 Info Process/Archiving-Lg $2.00 (over 230-0000-43135 $14.00 $14.00 $0.00 $14.00 11x17) Permit Fee-Additions,Alterations, 230-0000-43104 $3,542.31 $3,542.31 $0.00 $3,542.31 Demolition Plan Review 230-0000-43106 $1,705.20 $1,705.20 $1,705.20 8/15/2022 Credit Card 441970 $0.00 Plan Review Addl-Fire Life Safety 230-0000-43108 $1,416.92 $1,416.92 $0.00 $1,416.92 Totals for Fees $8,134.81 $8,134.81 $1,705.20 $6,429.61 Receipt# Payment Method Check# Payor: Receipt Date Receipt Amount 441970 Credit Card anonymous 08/15/2022 $1,705.20 Total Payments: $1,705.20 Balance Due: $6,429.61 City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use CP Building Permit #: Na�av ,A— ()CaO%3 Site Address: bud s'w 'cen4.40©� LAJ Suitc/Bldg#: 3c."D Project Name: Af 1s IDNJ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: " �, Vsite address/suite# exists and active in permit system. ❑r',River Terrace Neighborhood: ❑ Yes J N o ICI nd Use Case #: M 0 OZo7 2 - c� '--y Planszbatch Approved Land Use: Site Plan 0 Landscape Plan 0 Other: ❑ Urban Forestry Plan ❑ Elevation Plan ❑ Building Height: Maximum Height Actual Height `I" Conditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance siness License: Exists: ❑ Yes iNo,applicant was provided a business license application 0 [ 1 Public Facilities Improvement(PFI)Permit: Required: 0 Yes,applicant was notified 0 No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: ----- Date: $ >> /2, Revisions (after Building Submittal only) Reviewer Date . Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: -'-�(FA 3, Site Plans: # Building Plans: # Building Permit#: L Enter building permit#above. Workflow Routing: ®- Planning 0 Engineering SE Permit Coordinator Building Workflow Sign-off: . Sign-off for Planning(include notes from planning review) Route Application Documents: N -Building: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 1•41 N CA k Ohl ` Date: ti II(p( I:\Building\Forms\B ldgPermitRvw_COM_W ithLandUse_111819.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and pla t typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ N Assess Water Quantity Fee in-lieu: 0 Yes 1111 o LIDA Facility on lot: ❑ Y-: ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineerin:• Date Notes: Approved by En • eering: Date: Revisions er Building Submittal only) Reviewer Date R - ion 1: ❑ Approved ❑ Not Approved evision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Imit Coordinator Review tv. '�l� onditions "Met"prior to issuance of building permit - V Approved, NOT Released: Ve\ (6k Date: q.I,.-4 ^'7 Notes: ���`� Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: ,y Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: s N/A 1nb 1n v' _, `"' Tigard Trans SDC: s N/A _tor _v Parks SDC: ❑ Yes N/A 'Wl 1 �J LIDA Fee: ❑ Yes N/A Cr "'` l L�' OKto Issue Permit IL t\ • ` (-Q•7,"L /Approved by Permit Coordinator: A\ c3 T� Date: IV' "Z-Z_. I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 111819.docx