Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT 11111 " COMMUNITY DEVELOPMENT Permit#: MEC2022-00948 Date Issued: 11/3/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel 1S136DC04600 Jurisdiction: Tigard Site address: 7255 SW DARTMOUTH ST Project: Planet Fitness Subdivision: 1995-013 PARTITION PLAT Lot: 3 Project Description: Mechanincal for TI: Install(7)RTU's,(3)exhaust fans,and duct work. Contractor: VIKING HEATING &SHEETMETAL LLC Owner: COMMERCIAL NET LEASE REALTY, INC 15779 SE JANSIK CT 450 S ORANGE AVE, STE 900 DAMASCUS, OR 97089 ORLANDO, FL 32801 PHONE: 503-679-8096 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 11/03/2022 $1,861.71 Class of Work: ALT Type of Const: VB Plan Review 11/03/2022 $465.43 Occupancy Grp: A-3 Occupancy Load: 12%State Surcharge-Mechanical 11/03/2022 $223.41 Stories: 1 Info Process/Archiving-Lg$2.00(over 11/03/2022 $8.00 Project Valuation: $70,000.00 11x17) Info Process/Archiving-Sm$0.50(up to 11/03/2022 $8.00 11x17) Fuel Air Handlers Fuel Types: Natural Gas Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: 3 Vent Systems: Total $2566.55 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law, All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001- 9 Y ay o ai op of the rul Issued By: Permittee Signature: X J Call 503. 39.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Applicati0 I11is 111 11t I 1 .I 'Psi \ City of Tigard DECEIVE , Receie Datevd G DateBy: l/7 If Q /� �j�1 V 1,74�� —Ki') / A • 13125 SW Hall Blvd.,Tigard,OR 97223 ' i Phone: 503.718,2439 Fax: 503.598.1960 OCT -6 2022 Plan Review Date/By: JO'i ci.„2,2 Other Permit: II,:,is,, Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: turfs: 0 See Page 2 for Internet: www.tigerd-or.gov BUILDING DIVISION Notiled/Method: r;,g3 /1r /)_ - Supplemental Information �'I e-/�►074/14J� TYPE OF WORK C(DYfM11ERCIAL FEE* SCHEDULE— USE CHECKLI5T ❑New construction p G�t,sJv: Mechanical of the work performed.Indicate the vaermit fees*alue(rounded to the on the nearest dollar)of all ❑Addition/alteration/re lacement ❑Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ -1 O OQO CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling [ ,Cotnmercial/industrial ❑Accessory building For special information use checklist: ❑Multi-family ❑ Master builder 0 Other. Description Qty. pg, Total JOB SITE INFORMATION AND LOCATION Heating/cooling:`, .l �,,�T�,,� ccll — Air conditioning 46.75 Job site address: ,2- 5 3t. ) �&(' �S Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: el) o Furnace 100,000+BTU(ducts/vents) 54.91 �(-� nL `h^`� Heat pump 61.06 Suite/bldg./apt,no.: Project name: F"\Av4 . .. t V e.% Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23,32 Residential boiler(radiator or hydonic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 _ Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 a� � Flue vent for water heater or gas .�Y15113u . 7 Ur rtoFA 2 �\AAYexA �a(5, fireplace 23.32 r 7 Log lighter(gas) 23.32 Vet A- (1.4")c Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 0 PROPERTY OWNER 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility moms) 23.32 Phone:( ) Fax:( ) Attic%rawlspace fans 23.32 0 APPLICANT 0 CONTACT PERSON Other: 23.32 Fuel piping: Business name: V t I t te4,4.,e,r2.2) ,Ina (v a_„ -D S14.15 for first four;S4.03 for each additional Contact name: tl"S\.`l\�tA � V r'e1 G(�` Furnace,etc. Address: ...-11. 's s t �� Gas heat pump Wall/suspended/unit heater City/State/ZIP: cb-1 VaOl'_Ci r Or 'I —) LA (..+ Water heater Phone:(So',) g,5—(o. '?cf`.t.l Fax::( ) Fireplace Range - E-mail: aV1.(1 VLlLA/rk 1 SVc42 MQ AC C ._ 9h— Barbecue NTRACTOR Clothes dryer(gas) •Business name: V 1 w�,( p \ t(1 S � _ yi Other: � , at t t Y�C�V MECHANICAL PERMIT FEES* Address: Subtotal City/State/ZIP: Minimum permit fee($90.00) Phone:( ) Fax:( ) Plan review(25%of permit fee) State surcharge(12%of permit fee) CCB lie.: t 9O? TOTAL PERMIT FEE Thin permit application expires If a permit is not obtained within 180 days after it has been accepted as complete. Authorized si�atlire: '� * Fee methodology set by Tri-County Building Industry Service Board Print name: `tea` +v— G - Date: q( t c11,2 I:I Building lPermnAM1EC PennitApp 04011J.doc 440-4617T(I 1/02/COM/WEB) City of Tigard 41 COMMUNITY DEVELOPMENT DEPARTMENT ' . C TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: ��� Z, /,U,L/i— Site Address: 5'c c) miy Suite/Bldg#: Project Name: YVA "Fti i jCk, (Name o commercial business occuPying the space. If vacant,enter Spec Space.) Planning Review Proposal: L ? r(*C. h c-wrn-€41,+. Existing Business Activity: \� % Proposed Business Activity: //N.. -A Verify site address/suite# exists and active in permit system. D River Terrace Neighborhood: ❑ Yes ❑ No lQ Zoning: 'MU k..3 Permitted Use: ❑ Yes D No ❑ Spec Space 4 Confirm no land use required. \,Business License: \\ Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: /AA\\ LAY kk , ^O (,-,'n Approved by Planning: {� JCAA r ADate: I v'Le 7 Revisions (after Building Submittal only) \` Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: t' ' GC t /2-z_ Site Plans: ## Building Plans: # , Building Permit#: -U Enter building permit#above. Workflow Routing ring oor ator. $Building Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review) Route Application Documents: ❑ Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: /0/&72 2 I:1Building\Forms\131dgPermitRvw_COM_NoLandUse 09072022.docx Permit Coordinator Review ❑ Conditions "Met" prior to issuance of permit ❑ Approved,NOT Released: Date. ❑ ENG Revisions Required: ate: Notes: ❑ SDC Exemption E Applied for 0 Received • Does not apply ❑ Fees Entered: Wash Co Trans Dev Tax: 0 Yes ❑ N/A ❑ Deferred Tigard Trans SDC: ❑ 'es ❑ N/A ❑ Deferred Parks SDC: ■ Yes ❑ N/A ❑ Deferred LIDA Fee: ❑ Yes 0 N/A ❑ OK to Issue/Approved by Permit C. :rdinator: Date: Revisions (after Building Submittal • ly) Reviewer Date Revision 1: ❑ Approve. 0 Not Approved Revision 2: ❑ Ap.•.vcd 0 Not Approved Revision 3: ❑ ' pproved 0 Not Approved 1:\Building\Fonns\B1dgPermitRvw_COM_NolandUse_08162022.docx