Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT -! COMMUNITY DEVELOPMENT Permit#: FPS2022-00134 Date Issued: 10/26/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S1156A00100 Jurisdiction: Tigard Site address: 16200 SW PACIFIC HWY M Project: Trader Joe's Subdivision: None Lot: None Project Description: Fire alarm permit for TI:24 devices. Contractor: ADT COMMERCIAL LLC Owner: TECOLOTE RESOURCES INC PO BOX 310702 KELLY'S LEGACY LLC ET AL BOCA RATON, FL 33431 BY HESLIN HOLDINGS INC 23421 SOUTH POINTE DR STE 270 LAGUNA HILLS, CA 92653 PHONE: 503-936-6742 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-COM 10/25/2022 $112.96 12%State Surcharge-Building 10/25/2022 $13.56 Type of Use: COM Plan Review-Fire Life Safety-COM 10/25/2022 $45.18 Class of Work: ALT Type of Const: VA Info Process/Archiving-Lg$2.00(over 10/25/2022 $4.00 Occupancy Grp: M Height: 25 ft 11x17) Stories: 1 Info Process/Archiving-Sm$0.50(up to 10/25/2022 $22.50 11x17) Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Yes Alarm Type: Automatic Pull Station Required: Yes Smoke Detectors Req: Yes Battery Calcs Provided: Yes Cut Sheets Required: Yes Total $198.20 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $3,700.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follpw the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Permittee Signature: Call . .4175 by 7:00 a.m.for the next available' spectiomd a. This permit card shall be kept in a conspicuous place on the job si until co le' n of the project. Approved plans are required on the job site at the ti ach' action. City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information Describe work to be done: ' 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: El New system Number of sprinkler heads: Number of alarm devices: ❑ Addition or El 1-10 heads: Affidavit required and El 1-5 devices: Affidavit required and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system ❑ 11+ heads: Plan review required and 1Z14+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: Type of System (Complete A, B, C or D as applicable) A.) Commercial Sprinkler :. Sprinkler Type ❑ Wet ❑ Dry Additional Standpipes Information: Sprinkler Supply Line ❑ Yes El No Hazard Group Density Design Area K. Factor Sprinkler Project Valuation: $ B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations Yes include: Individual Component El, Yes Cut Sheets Fire Alarm Project Valuation: $ 3 ?0 c. D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal (see A, B & C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review(40% of permit fee): $ TOTAL: $ I:\Building\Permits\FPS_PermitApp_031016.doc 2