Loading...
Permit Support Document CITY OF TIGARD ELECTRICAL PERMIT a ELECTRICAL ELC2022-00512 COMMUNITY DEVELOPMENT T f G AP T) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 8/1/2022 Parcel: 1 S 136DD03800 Jurisdiction: Tigard Site address: 11675 SW 66TH AVE Project: Mountain wood homes office Subdivision: WEST PORTLAND HEIGHTS Lot: 4-8&27 Project Description: Tenant improvement: REPRINT address corrected. Contractor: MOUNTAINWOOD HOMES INC Owner: TANGLEWOOD DEVELOPMENT LLC frit PO BOX 2257 ATTN WOOD, ROBERT BEAVERTON, OR 97075-2257 8324 SW NIMBUS AVE BEAVERTON, OR 97008 PHONE: 503-746-7338 PHONE: FAX: FEES Quantity Description Date Amount 42 ort Branch Circuits wo/Purchase 08/01/2022 $360.40 Specifics: Service or Feeder 1 ea Signal circuit or Limited 08/01/2022 $75.00 Type of Use: COM Energy Panel Class of Work: ALT 1 ea 12%State Surcharge- 08/01/2022 $52.25 Type of Const: Electrical Occupancy Grp: 45 Address Fee 11/17/2022 $45.00 Total $532.65 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through 0 952-001-0090.� ou��r\ mjfv oyt n a coov of the rules or direct auestions to OUNC by callina 503.232.1987 or 1.800.332.2344 Issued By: �1 C '„� W` l - Permittee Signature: -�' G\‘ i OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNERS SIGNATURE: Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC'N Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.