Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT ill z COMMUNITY DEVELOPMENT Permit#: MEC2022-01077 T[CARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: Parcel: 2S 103 DA00700 Jurisdiction: Tigard Site address: 13205 SW WATKINS AVE Project: Anderson Subdivision: DERRY-DELL Lot: 7 Project Description: new gas line for furnace,converted from oil. Contractor: Owner: ANDERSON, DENNISE 10595 SW 71ST AVE PORTLAND, OR 97223 PHONE: PHONE: FAX: FEES Specifics: Description Date Amount Fuel Piping 11/17/2022 $14.15 Type of Use: SF 12%State Surcharge-Mechanical 11/17/2022 $10.80 Class of Work: ALT Type of Const: Minimum Fee Adjustment-Mechanical 11/17/2022 $75.85 Occupancy Grp: Stories: Fuel Fuel Types: Natural Gas Gas Pressure: Total $100.80 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth inOAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: ,� r'/4--7) A// Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE USE ONLY City of Tigard Received al Date/By: I I/)7/: - 1 �bd Permit No.: ti (7 n. 1 c q 1 -c 13125 SW Hall Blvd.,Tigard,OR 97223 II Phone: 503.718.2439 Fax: 503.598.1960 DateBy1ev Other Permit: T I G A R D Inspection Line: 503.639.4175 Date Ready/By: Jeris: See Internet: www.tigard-or.gov Page 2 for Notified/Method: Supplemental Information TYPE OF WORK COMMERCIAL FEE* SCHEDULE — USE CHECKLIST ❑New construction Mechanical permit fees*are based on the value of the work -�alddition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑ Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. CATEGORY OF CONSTRUCTION Value:$ RESIDENTIAL EQUIPMENT/SYSTEMS FEES* I-and 2-family dwelling ❑Commercial/industrial ❑Accessory building For special information use checklist ❑Multi-family ❑Master builder ❑Other: Description Qty, Fa. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Job site address: ` Air conditioning 46.75 � �'�(z U� 7T� Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: Y_, --�1 e"� q 7 `7 3 Furnace 100,000+BTU(ducts/vents) / 54.91 Suite/bldg./apt.no.: Project name: a��//��/ �Gt,. m -I uDuct pump 61.06 �4- Duct work 23.32 Cross street/directions to job site: .71 ,-_,_,(,),Dit..tk k./14.- Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 „ .. . DESCRIPTION OF WORK Gas fireplace/insert 33.39 /� G Fluer vent for water heater or gas (e' C�` ' �. fireplace 23.32 /Y./'e Log lighter(gas) 23.32 / Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 pl PROPERTY OWNER, 0 TENANT Other: 23.32 '• I Environmental exhaust and ventilation: Name: i�- `I % )'`(i\1i1 0_,..f- e /- Range hood/other kitchen Address: 604 \` � equipment 33.39 Z Clothes dryer exhaust 33.39 City/State/ZIP: e 47 e/ i 7 Single-duct exhaust(bathrooms, "'t Fax: toilet compartments,utility rooms) 23.32 Phone:(" ;) 1. (.1IQ� ( ) Attic/crawlspace fans 23.32 ❑ APPLICANT ❑ CONTACT PERSON Other: 23.32 Business name: Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: Furnace,etc. Address: Gas heat pump WalUsuspended/unit heater City/State/ZIP: Water heater Phone:( ) Fax: :( ) Fireplace E-mail: Range Barbecue CONTRACTOR Clothes dryer(gas) Business name: Other: t I QVt_%,u.c MECHANICAL PERMIT FEES* Address: Subtotal City/State/ZIP: Minimum permit fee($90.00) Phone: Plan review(25%of permit fee) ( ) Fax:( ) State surcharge(12%of permit fee) CCB lic.: TOTAL PERMIT FEE I(D, IC' This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature * Fee methodology set by Tri-County Building Industry Service Board Print name: Date: 1 1,1 117 1:1Building'Ecrmits\MEc 011 .doc 1k46 7I(IV 'COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial& Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. 1:\Buildiug\Perinits\MEC_PermitApp_040113.doc 2 Property Owner Statement Regarding Construction Responsibilities Oregon Law requires residential construction permit applicants who are not licensed with the Construction Contractors Board to sign the following statement before a building permit can be issued. (ORS 701.325 (2)) This statement is required for residential building, electrical, mechanical, and plumbing permits. Licensed architect and engineer applicants, exempt from licensing under ORS 701.010(7), need not submit this statement.This statement will be filed with the permit. Please check the appropriate box: v____A 'own, reside in, or will reside in the completed structure and my general contractor is: Name CCB# Expiration Date I will inform my general contractor that all subcontractors who work on the structure must be licensed with the Construction Contractors Board. or taI will be performing work on property I own, a residence that I reside in, or a residence that I will reside in. If I hire subcontractors, I will hire only subcontractors licensed with the Construction Contractors Board. If I change my mind and hire a general contractor, I will select a contractor who is licensed with the CCB and will immediately give the name of the contractor to the office issuing this Building Permit. I have read and understand the Information Notice to Homeowners About Construction Responsibilities, and I hereby certify that the information on this homeowner statement is true and accurate. Print Name of Permit Applicant /I( /77 /Z° '2 Signal a of Permit Applicant Date Permit#: •S Address: r �-fi --,:, Issued by: Date: This Copy for Permit Offices i ` Information Notice to Owners About -;:n7:� .,� Construction Responsibilities Fri (ORS 701.325 (3)) Homeowners acting as their own general contractors to construct a new home or make a substantial improvement to an existing structure, can prevent many problems by being aware of the following responsibilities: • Homeowners who use labor provided by workers not licensed by the Construction Contractors Board, may be considered an employer, and the workers who provide the labor may be considered employees. As an employer, you must comply with the following: • Oregon's Withholding Tax Law: Employers must withhold income taxes from employee wages at the time employees are paid. You will be liable for the tax payments even if you don't actually withhold the tax from your employees. For more information, call the Department of Revenue at 503-378-4988. • Unemployment Insurance Tax: Employers are required to pay a tax for unemployment insurance purposes on the wages of all employees. For more information, call the Oregon Employment Department at 503-947-1488. • Oregon's Business Identification Number (BIN): is a combined number for both Oregon Withholding and Unemployment Insurance Tax. To file for a BIN, call 503-945-8091 or go to http://wvwa.oregon.gov/DOR/BUS/docs/211-055.pdf for the appropriate forms. • Workers Compensation Insurance: Employers are subject to the Oregon Workers Compensation Law, and must obtain Workers Compensation Insurance for their employees. If you fail to obtain Workers Compensation Insurance, you could be subject to penalties and be liable for all claim costs if one of your workers is injured on the job. For more information, call the Workers Compensation Division at the Department of Consumer and Business Services at 503-947-7815. • Tax Withholding: Employers must withhold Social Security Tax and Federal Income Tax from employee wages. You may be liable for the tax payment, even if you didn't actually withhold the tax. For a Federal EIN number, call the IRS at 1-800-829-4933 or visit their website at www.irs.aov. Other Responsibilities of Homeowners: • Code Compliance: As the permit holder for a construction project, the homeowner is responsible for notifying building officials at the appropriate times, so that the required inspections can be performed. Homeowners are also responsible for resolving any failure to meet code requirements that may be found through inspections. • Property Damage and Liability Insurance: Homeowners acting as their own contractors should contact their insurance agent to ensure adequate insurance coverage for accidents and omissions, such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that must be redone. Liability Insurance must be sufficient to cover injuries to persons on the job site who are not otherwise covered as employees by Workers Compensation Insurance. • Expertise: Homeowners should make sure they have the skills to act as their own general contractor, and the expertise required to coordinate the work of both rough-in and finish trades. CONSTRUCTION CONTRACTORS BOARD PO Box 14140, Salem, OR 97309-5052 Telephone: 503-378-4621 —Fax: 503-373-2007 Website Address: www.oreoon.gov/ccb f/property owner adopted 9-23-08 This Copy for Permit Applicant