Loading...
Permit U 2azz-007,53 6660 ZweArr-c- Qm) RECEIVED nrr 6 2n?7 NOTICE OF TYPE I DECISIQ�`,�PING7YOF TIG DIVISIOARD N MINOR MODIFICATION MMD2022-00038 ART RUTKIN ELEMENTARY SCHOOL T I cA R D 120 DAYS = January 27, 2023 SECTION I. APPLICATION SUMMARY FILE NAME: Art Rutkin Elementary School CASE NO.: Minor Modification(MMD) MMD2022-00038 PROPOSAL: The applicant is requesting approval for a minor modification to build an approximately 480 square foot covered structure adjacent to the Art Rutkin Elementary School community garden located at 15600 SW River Terrace Boulevard. APPLICANT: Otak CPM Attn:Debbie Pearson 808 SW Third Avenue,Suite 800 Portland, OR 97204 OWNER Tigard Tualatin School District 6960 SW Sandburg Street Tigard,OR 97223 LOCATION: 15600 SW River Terrace Boulevard.WC1 M2S108CC,Tax Lot 00300 ZONING DESIGNATION: RES-C APPLICABLE REVIEW CRITERIA: Community Development Code (CDC) Chapters 18.350,and 18.765. SECTION II. DECISION Notice is hereby given that the City of Tigard Community Development Director's designee has APPROVED the above request.The findings and conclusions on which the decision is based are noted in Section IV. simmeik MMD2022-00038 Art Rutkin klementary School 1 _. SECTION III. BACKGROUND INFORMATION Site Information: The subject property is located north of SW Beef Bend Road, east of SW River Terrace Boulevard, south of SW Bull Mountain Road,and west of SW Finis Lane. The site is zoned Residential C (RES- C) and is within the River Terrace Plan District, as are surrounding properties to the north and east. Additionally,the property is designated as Public Institution within the City of Tigard Comprehensive Plan.The site abuts unincorporated Washington County rural agriculture land to the west and south that is not within the Urban Growth Boundary (UGB). There are currently no existing structures on the subject site. The northern edge of the site contains a stand of large mature trees, and there is significant elevation gain (approximately 80 feet) from the south property line to the north property line. The applicant is requesting approval to locate a covered structure within the Art Rutkin Elementary School;a 51,300 square foot elementary school development approved under Conditional Use Permit CUP2014-00001 on an approximately 10.5-acre property known as Parcel 1 of Minor Land Partition MLP2018-00004. The applicant is now applying separately for a minor modification of the existing Conditional Use Permit for the purpose of adding an approximately 480 square foot covered structure adjacent to elementary school's future community garden. This covered structure will be used by the school to conduct science and agriculture classes. SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS Chapter 18.765 Minor Modifications Chapter 18.350 Residential Zone Development Standards Chapter 18.640 River Terrace Plan District 18.765 Modification 18.765.060 Minor Modifications A. Definition.A minor modification has the following characteristics: L It has minimal impacts on surrounding properties,sensitive lands,or public facilities; and FINDING: The proposed covered structure will be located within the Art Rutkin Elementary School development, adjacent to the school's community garden. The community garden is located at the southeast corner of the subject site and is approximately 60 feet from the side property line and will be more than 100 feet from the existing sensitive lands on the southeast corner of the subject site, therefore the proposal has minimal impacts on surrounding properties and sensitive lands.There are already adequate facilities in place to serve the Art Rutkin site and the proposed building, so the impacts to public facilities by this proposal are expected to be minimal. The proposal meets the definition of a minor modification. 2. It does not cause the development to go out of conformance with any applicable standard or further out of conformance if already nonconforming, except where an adjustment has been approved. MMD2022-00038 Art Rutkin I ltAncutary School 2 FINDING: The proposed modification meets all of the applicable development standards as outlined in the findings below and therefore, does not cm-Ise the development to go further out of conformance with the applicable standards. 18.350 Residential Zone Development Standards 18.350.040 Development Standards A. Setbacks. 1. The minimum setback from any street property line is 15 feet. 2. The minimum setback from side and rear property lines is 20 feet. FINDING: The proposed modifications to the Art Rutkin Elementary School site will consist of an approximately 480 square foot covered structure. According to the applicant's site plan,the covered structure is approximately 550 feet from the street property line on River Terrace Boulevard,approximately 60 feet from the side property line,and approximately 200 feet from the rear property line. This standard is met. B. Height.The maximum height is 45 feet FINDING: The proposed covered structure has a height of 15 feet which is below the maximum height of 45 feet.This standard is met. C. Lot coverage. The maximum lot coverage is 85 percent. FINDING: The previously approved Conditional Use Permit indicated that 48 percent of the overall site is developed,including all buildings and impervious surfaces. Considering the covered structure will be sited within the existing developed area and is only 480 square feet, it will not increase the overall lot coverage of the site beyond 85 percent This standard is met D. Landscaping and screening.All required landscaping,including landscaping used to meet screening or tree canopy standards,is subject to the general provisions of Chapter 18.420, Landscaping and Screening. 1. A minimum of 15 percent of the site must be landscaped. Landscaping standards are provided in Section 18.420.040.Any landscape area that meets the L-2 standard may count toward meeting the minimum area standard. FINDING: As demonstrated on the landscape and planting plans within the previously approved Conditional Use Permit (Sheets L100 — L201); all areas of the school site not occupied by buildings,parking lots,and drive aisles will be landscaped with a combination of hardscape plazas, landscape areas, existing vegetation (at the north end of the site), and vegetated storm-water facilities (at the south end of the site). Approximately 52 percent (237,837 square feet) of the 10.5 acre site (457,380 square feet) will be landscaped(including existing vegetation that will be preserved). The addition of the 480-square foot covered MMD2022-00038 Art Rutkin Elementary School 3 structure will reduce the landscaping to 51 percent (237,357 square feet). Staff finds that with the reduction of landscaping,the standard continues to be met. 18.350.050 Design Standards D. Materials. 1. The following materials are prohibited as exterior finish materials: a. Vinyl PVC siding, b. T-111 plywood, c. Exterior insulation finishing (EIFS), d. Corrugated metal, e. Plain concrete or concrete block, f. Spandrel glass, or g. Sheet pressboard. 2. Foundation material may be plain concrete or plain concrete block where the foundation material is not revealed for more than 2 feet above grade at any point. FINDING: According to the applicant's plans, the exterior finish materials utilised for the coveted structure will not consist of any of the prohibited materials. The foundation material will not be revealed for more than 2 feet above grade at any point and will have 20-inch diameter concrete backfill columns below grade.These standards are met. D. Approval criteria. The approval authority will approve or approve with conditions a minor modification application when all of the following criteria are met 1. The proposed modification qualifies as a minor modification as defined in Subsection 18.765.060.A; FINDING: As demonstrated in the findings above,this proposal qualifies as a minor modification as defined in CDC 18.765.060A.This criterion is met. 2. If the proposal involves the modification of a condition of approval, at least one of the following criteria is met: a. The condition cannot be implemented for reasons outside the control of the applicant or property owner, b. The condition is no longer needed or warranted because circumstances have changed;or c. A new or modified condition better accomplishes the purpose of the original condition. FINDING: The applicant is not proposing to modify a condition of approval.This criterion does not apply. MMD2022-00038 Art Rutkin Elementary School 4 CONCLUSION: This proposal qualifies as a minor modification to an existing development,as defined in CDC 18.765.060.A, and as conditioned, is in compliance with all applicable standards of this Title. SECTION V. PROCEDURE AND APPEAL INFORMATION Notice: Notice was provided to: X The applicant and owner Final Decision: A minor modification is a Type I procedure.As such, this decision is final for purposes of appeal on the date it is mailed or otherwise provided to the applicant, whichever occurs first. This decision is not appealable locally and is the final decision of the City. THIS DECISION IS FINAL ON OCTOBER 5, 2022 AND BECOMES EFFECTIVE ON OCTOBER 6, 2022. Questions: If you have any questions,please contact Nikki Tuason at (503) 718-2450 or NikkiT@,tigard-or.gov. October 5, 2022 APPROVED Y: Nikki Tuason,Assistant Planner Community Development Director's Designee MMD2022-00038 Art Rutkin Elementary School 5 CITY OF TIGARD BUILDING PERMIT ■ Permit#: BUP2022-00253 COMMUNITY DEVELOPMENT T I G A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/15/2022 Parcel: 2S108CC00300 Jurisdiction: Tigard Site address: 15600 SW RIVER TERRACE BLVD Project: Art Rutkin Elementary School Subdivision:ART RUTKIN ELEMENTARY SCHOOL Lot: 1 Project Description: 480 sq ft garden storage shet. Contractor: M &W BUILDING SUPPLY CO INC Owner: TIGARD-TUALATIN SCHOOL DISTRICT 23J PO BOX 220 6960 SW SANDBURG ST CANBY, OR 97013 TIGARD, OR 97223 PHONE: 503-263-9000 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 11/15/2022 $508.18 Occupancy Grp: S-2 Occupancy Load: 0 12%State Surcharge-Building 11/15/2022 $60.98 Dwelling Units: 0 Plan Review 10/06/2022 $330.32 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 11/15/2022 $110.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 11/15/2022 $12.00 11x17) Value: $45,487 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,021.48 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: • Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain opy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. , Issued By: Permittee Signature: c-C r f/27/// 9()/) —7 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVED FOR OFFICE USE ON.I 1 City of Tigard Received III 13125 SW Hall Blvd.,Tigard,OR 9722g C T - 6 ' DatcPh /Bev-rt C.) 14 , ,1 tNo.: —tea 53 2 Phone: 503-718-2439 Fax: 503-598-1960 pateBy. 1� • I 1 ''��: TIGARD Inspection Line: 503-6394175 CITY OF TIGARDDate Ready/Ety: fa See Page Zfor Internet: www.tigard-orgov BUILDING DIVISION N 1t i[t 1)-1.}$ g nit lInferma�n Vh4Ri(«E &r171)4e!" '7 I(//t�,, TYPE OF WORK REQUIRED DATA:I-AND 2-FAMMY DWELLING ® New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ ®C1-and 2-familydwellingValuation: S ommerciaUmdustrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number ofbathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:15777 Qw T*yr•Q-lane- 0Q -r-- New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 15Zotan - ''''tz......) I lU�` Garage/carport area: square feet Suite/bldg./apt.#: Project name:Art Rutkin Elementary School-Sun Shade Covered porch area: square feet Cross street/directions to job site:SW Beef Bend Rd to SW April Lane Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#:100 Permit fees*are based on the value of the work performed. Tax map/parcel#:2S108CC00 4000 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. `I CS-0 5,=a ST t,(-4(24 S hp_r-)/S`avA T _ Valuation: S45,487.00 (J Existing building area square feet New building area:480 square feet ❑ X PROPERTY OWNER ❑ TENANT Number of stories:1 Name: Tigard Tualatin School District Type of construction:Wood&metal Address:6960 SW Sanberg St Occupancy groups:Group E City/State/ZIP:Tigard,OR 97223 Existing: Phone:( 503)431-4000 Fax:( New- X APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:M&W Building Supply CO.,Inc (Please.efersofa,scircthrre) Structural plan review fee(or deposit): j Contact name:Gregg Peterson FLS plan review fee(if applicable): Address:P.O.Box 220/22175 S Hwy 99E City/State/ZIP:Canby,OR 97013 Total fees due upon application: Phone:( 503)263-9000 Fax Amount received: E-mail:gregg a(mwbsc.om PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:M&W Building Supply Co.,Inc. Submit two(2)sets of roof plan with connection details Address:22175 S Hwy 99E Sol fire lar Installation department a ty alongchecklist 2010 Oregon City/State/ZIP:Canby,OR 97013 Permit fee(includes plan review S180.00 and administrative fees): Phone:( 503)263-9000 Fax:( ) State surcharge(12%of permit fee): S21.60 CCB Lie.:79450 Total fee due upon application: S201.60 Authorized signature: ( c ?? .. _ This permit application expires if a permit is not obtained !!�� /p within 180 days after it has been accepted as complete. Print name: L r ��.)-, .f5o vL Date: /(2/(o/Zy *Fee methodology set by Tri-County Building Industry ! Service Board. I:1Building\Pemhits\BUP COM_PemutApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) RECEIVED City of Tigard ocT -6 2u%? q COMMUNITY DEVELOPMENT DEPARTMENT _ CITY OF TIGARD TIGARD Building Permit Review — Commercial 3ilY V,vecd Use Building Permit #: J 1tP a..o a--1- 0 0 ? 5 ) Site Address: /S1 (.W .R.Iveg '1-C Suite/Bldg#: Project Name: ART- ' or J € j i a I s t2/ sz * (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: (,tal207 iVi2 Verify site address/suite#exists and active ''permit system ❑ er Terrace Neighborhood: ! Yes No /L L Use Case#: MOZz " 033 lans Approved Land Use: Site Plan ❑ Landscape Plan ❑ Other: 0 Urban Forestry Plan ❑ Elevation Plan _ ❑ Building Height: Maximum Height 9� Actual Height /� ❑ Located in Floodplain: 0 Yes l2'''1'. Supplemental Floodplain Form Required: ❑ Yes,applicant was notified ❑ No Received: 0 Yes 0 No Cytmditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance Business License: (//4- Exists: ❑ Yes 0 No,applicant was provided a business license application Public Facilities Improvement(PFI) Permit: Required: 0 Yes,applicant was notified No Applied For: 0 Yes 0 No,stop intake Notes: Approved by Planning: —Date: /(r X/ZiZ, Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ( Cll. / d-c,- Site Plans: # Building Plans: # . — Building Permit#: Enter buildin pernut#above. Workflow Routing: Planning ' Engineering iXPermit Coordinator ir Building Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: g Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: „Die) t° att t C Date: I of Li ( ),). I:\Building\Forms\BldgPennitRvw_COM_W ithLandUse_111819.docx Engineering Review ❑ Slope at building pad: ❑ PFI permit#: ❑ Conditions"Met"prior to issuance of permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 0 No Assess Water Quantity Fee in-lieu: ❑ Yes 0 No LIDA Facility on lot: ❑ Yes 0 No Add Fee: 0 Yes 0 No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review ❑ Conditions"Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ❑ SDC Exemption 0 Applied for 0 Received 0 Does not apply ❑ Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A 0 Deferred Tigard Trans SDC: ❑ Yes 0 N/A 0 Deferred Parks SDC: 0 Yes ❑ N/A ❑ Deferred LIDA Fee: 0 Yes 0 N/A ❑ OR to Issue/Approved by Permit Coordinator: Date: Revisions (after Building Submittal only) Reviewer: Date: Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved I:\BuildingTorms\BldgPermitRvw_COM_WithiandUse_08162022.doac RECEIVED City of Tigard O C T -6 e COMMUNITY DEVELOPMENT DEPARTMENT II IICITY OF TIOARU TlcAuo Building Permit Review — Commercial -3Vil9 rale Use Building Permit #: (( o -- D 0 a S > -e,t-VP Site Address: /SE,D0 'w 2Itl C Suite/Bldg#: Project Name: ART- er1C►tr'gt2-/ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: at1/e 2-07 .7142Z— Verify site address/suite#exists and activ;ja.permit system. ❑ erTerraceNeighborhood: k Yes No /CJ La Use Case#: MDZ22 O17C) lans)4eCc Approved Land Use: IBSite Plan ❑ Landscape Plan ❑ Other: 0 Urban Forestry Plan 0 Elevation Plan tt_ ❑ Building Height: Maximum Height 4 S--- Actual Height (J ❑ Located in Floodplain: 0 Yes Cr7"'1< Supplemental Floodplain Form Required: ❑ Yes,applicant was notified 0 No Received: ❑ Yes 0 No Cp dlitions Met: 0 Prior to Submittal CI Prior to Permit Issuance Business License: NA- Exists: ❑ Yes ❑ No, applicant was provided a business license application Public Facilities Improvement(PFI)Permit: Required: 0 Yes, applicant was notified No Applied For: 0 Yes ❑ No,stop intake Notes: Approved by Planning: Date: ex Z Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: D Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ( a/b/ XI)" SitePlans: # Building Plans: # Building Permit#: Enter buildin permit# above. Workflow Routing: Planning N., Engineering C Permit Coordinator Vr Building Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: , Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: �� Y' nc t(. Date: I Or tl ( )A- I:\Building\Fomis\BldgPermitRvw_COM_W ithLandUse_l 11819.docx Po Erineering Review #, if: at building pad: G 7er I PFI Permit#: /i' /J 7 /Pd Z 7 _ // L"/Conditions "Met"prior to issuance of permit In"Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) I Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes Iallo Assess Water Quantity Fee in-lieu: ❑ Yes (t/No LIDA Facility on lot: ❑ Yes ra No Add Fee: ❑ Yes D No ❑ NOT Approved by Engineering: Date Notes: /— Approved by Engineering: Date: lc.,2 fl40. Revisions (after Building Submittal o y) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: SDC Exemption4 0 Applied for ❑ Received Does not apply Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A 0 Deferred Tigard Trans SDC: 0 Yes N/A 0 Deferred Parks SDC: 0 Yes N/A 0 Deferred LIDA Fee: 0 Yes N/A OK to Issue/Approved by Permit Coordinator: %\\ Date: VO.\—�ijtri 04 Revisions (after Building Submittal only) Reviewer: Date: Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved I:\Buildmg\Forms\BldgPermitRvw_COM_W ithLandUse_08162022.docx i