Report (2) OFFICE COPY RECEIVED
COMcheck Software Version COMcheckWeb OCT 20 1
Mechanical Compliance Certificate 3Jj p,NFn'vs(onl
MEC z022._-C gl
Project Information lOCoc Cuf'ctina\ LYl
Energy Code: 90.1 (2019) Standard
Project Title: PCC 236
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
6600 SW Cardinal Ln Oregon Louis Leon
Tigard,Oregon 97224 Protemp Associates Inc
9788 SE 17th Ave, 9788 SE 17th
Ave
Milwaukie, Oregon 97222
5035193083
louis@protmp.com
Mechanical Systems List
QuantitySystem Type & Description
1 HVAC System
Heating: 1 each- Duct Furnace, Gas,Capacity= 162 kBtu/h
Proposed Efficiency =80.00%Ec, Required Efficiency: 80.00%Ec
Cooling: 1 each-Single Package DX Unit, Capacity= 124 kBtu/h,Air-Cooled Condenser,Air Economizer
Proposed Efficiency = 11.00 EER, Required Efficiency= 11.00 EER
Proposed Part Load Efficiency= 14.60 IEER, Required Part Load Efficiency = 12.70 IEER
Fan System: FAN SYSTEM 1 --Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 1 Supply, Constant Volume,4000 CFM,3.1 motor nameplate hp, 1.00 fan energy index,fan exception: Single
fan < 1 HP or< 0.89 kW
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Heating: 1 each-Duct Furnace, Gas,Capacity= 121 kBtu/h
Proposed Efficiency=80.00%Ec, Required Efficiency: 80.00%Ec
Cooling: 1 each-Single Package DX Unit, Capacity= 94 kBtu/h,Air-Cooled Condenser,Air Economizer
Proposed Efficiency= 11.00 EER,Required Efficiency= 11.00 EER
Proposed Part Load Efficiency= 14.60 IEER, Required Part Load Efficiency= 12.70 IEER
Fan System: FAN SYSTEM 2--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 2 Supply, Constant Volume. 3000 CFM,3.1 motor nameplate hp, 1.00 fan energy index
SYSTEM VERIFICATION REQUIRED.
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2019)Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist. //
40C/� .wall C$4 /ro/U/27
Name-Title Signature Oat JJl
Project Title: PCC 236
I Report date: 10/10/22
Data filename: Page 1 of 10
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 90.1 (2019) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans, specifications, and/or ❑Complies
6.4.4.2.1, calculations provide all information ❑Does Not
6.7.2 with which compliance can be
EPR211 determined for the mechanical ❑Not Observable
systems and equipment and !❑Not Applicable j
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
'handbooks.
4.2.2, Plans, specifications, and/or ;❑Complies
8.4.1.1, calculations provide all information ❑Does Not
8.4.1.2, with which compliance can be ['Not Observable
8.7 determined for the electrical s stems
[PR67P and equipment and document where ❑Not Applicable
exceptions are claimed.Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
4.2.5.2 Commissioning shall be performed as ❑Complies
[PR5]' stated in Sections 5.9.2, 6.9.2, 7.9.2, ❑Does Not
8.9.2, 9.9.2, 10.9.2, 11.2(d), and [Plot Observable'
'G1.2.1(c).Commissioning must utilize
!ASHRAE/IES Standard 202 or other ❑Not Applicable
'generally accepted engineering
'standards acceptable to the building
official. FPT and verification
requirements for commissioning are
as stated in Section 4.2.5.1.
Commissioning shall document
compliance of the building systems,
controls,and building envelope with
required provisions of this standard.
;Commissioning requirements shall be
incorporated into the construction
documents.
Additional Comments/Assumptions:
1 High Impact(Tier 1) L Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 2 of 10
Section
Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.7 Freeze protection and snow/ice ❑Complies
(F09]3 melting system sensors for future ODoes Not
connection to controls.
❑Not Observable..
j❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3` Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 3 of 10
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
' & Req.ID
6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency:_ ❑Complies See the Mechanical Systems list
6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values.
[ME1)2 equipment labeled as meeting
90.1. ,❑Not Observable
❑Not Applicable
6.4.3.4.1 ;Stair and elevator shaft vents " ❑Complies
[ME3]3 have motorized dampers that ODoes Not
automatically close.
;, N ❑Not Observable
Not Applicable
6.4.3.4.2, Outdoor air and exhaust systems ❑Complies
6.4.3.4.3 have motorized dampers that ❑Does Not
[ME4]3 automatically shut when not in °
use and meet maximum leakage ❑Not Observable
rates.Check gravity dampers ❑Not Applicable
where allowed.
6.4.3.4.5 Enclosed parking garage Complies
[ME39]3 ventilation has automatic ❑Does Not
contaminant detection and
capacity to stage or modulate ❑Not Observable
fans to 50%or less of design ❑Not Applicable
capacity.
6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies
[ME5]3 automatic controls to shut off fan ❑Does Not
when not required. ,ONot Observable
iONot Applicable
6.4.3.8 Demand control ventilation ❑Complies
[ME6]' provided for spaces>500 ft2 and ❑Does Not
>25 people/1000 ft2 occupant
density and served by systems Not Observable
with air side economizer, auto ❑Not Applicable
modulating outside air damper
control,or design airflow >3,000
cfm.
6.5.3.2.1 DX cooling systems >= 75 kBtu/h fi❑Complies See the Mechanical Systems list
[ME40]2 (>= 65 kBtu/h effective 1/2016) Oboes Not for values.
and chilled-water and
evaporative cooling fan motor hp ❑Not Observable
>= 1/4 designed to vary supply ❑Not Applicable
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1 Insulation exposed to weather ❑Complies
[ME7]3 protected from damage. `ODoes Not
Insulation outside of the
conditioned space and associated ❑Not Observable
with cooling systems is vapor ❑Not Applicable
retardant.
6.4.4.1.2 HVAC ducts and plenums R- R- ❑Complies
[ME8]2 insulated per Table 6.8.2.Where ❑Does Not
ducts or plenums are installed in
or under a slab,verification may ❑Not Observable
need to occur during Foundation ElNot Applicable
Inspection.
6.4.4.1.3 HVAC piping insulation thickness. I in. _in. ;❑Complies
[ME9)2 Where piping is installed in or Not
under a slab,verification may
need to occur during Foundation ONot Observable
Inspection. 1=INot Applicable
6.4.4.1.4 Thermally ineffective panel ElComplies
[ME41]3 surfaces of sensible heating ^0Does Not
panels have insulation >=R-3.5.
❑Nat Observable
❑Not Applicable
1 High Impact(Tier 1) I a Medium Impact(Tier 2) 3]Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 4 of 10
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies. Comments/Assumptions
' & Req.ID
6.4.4.2.1 Ducts and plenums having ,DComplies
[ME10]2 pressure class ratings are Seal ❑Does Not
Class A construction. ❑Not Observable
❑Not Applicable
6.8.1-15, -:Electrically operated DX-DOAS ;:E❑Complies
6.8.1-16 units meet requirements per Does Not
[ME11012 Tables 6.8.1-15 or 6.8.1-16.
❑Not Observable '
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in.water LJComplies
[ME11]3 column requires air leakage ❑Does Not
testing.
❑Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in.water ❑Complies
[ME11]3 column requires air leakage ❑Does Not
testing.
ID Not Observable
❑Not Applicable
6.5.2.3 Dehumidification controls ;❑Complies
[ME19]3 provided to prevent reheating, ❑Does Not
recooling, mixing of hot and cold
airstreams or concurrent heating ,❑Not Observable
and cooling of the same ❑Not Applicable
airstream.
6.5.2.4.1 Humidifiers with airstream ❑Complies
[ME68]3 mounted preheating jackets have ❑Does Not
preheat auto-shutoff value set to
activate when humidification is ['Not Observable
not required. ❑Not Applicable
6.5.2.4.2 Humidification system dispersion ❑Complies
[ME69]3 tube hot surfaces in the ❑Does Not
airstreams of ducts or air-
handling units insulated>= R- DNot Observable
0.5. ❑Not Applicable
6.5.2.5 Preheat coils controlled to stop DComplies
[ME70]3 heat output whenever ❑Does Not
mechanical cooling, including
economizer operation, is active. ❑Not Observable
III Not Applicable
6.5.2.6 Units that provide ventilation air ❑Complies
[ME106]3 to multiple zones and operate in ❑Does Not
conjunction with zone heating
and cooling systems are DNot Observable
prevented from using heating or ❑Not Applicable !.
heat recovery to warm supply air
above 60°F when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies
[ME72]2 < 1 hp are electronically- ❑Does Not
commutated motors or have a
minimum motor efficiency of ❑Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
1 High Impact(Tier 1) j 2 I Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 5 of 10
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Complies? Comments/Assumptions
& Req.ID p Value Value
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies
[ME7212 < 1 hp are electronically- ❑Does Not
commutated motors or have a
minimum motor efficiency of ?❑Nat Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies
1ME108]2 terminals have automatic 40Does Not
controls to a)turn off the `f
terminal fan except when space ❑Nat Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies
[ME108]2 terminals have automatic a❑Does Not
controls to a)turn off the
;terminal fan except when space ❑Not Observable
heating is required or if required ..,❑Not Applicable
•for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.7 Required minimum outdoor air ❑Complies
[ME10912 rate is the larger of minimum El Does Not
outdoor air rate or minimum
exhaust air rate required by :Not Observable
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation ti
systems shall comply with one of 44,
the following: a) design minimum
system outdoor air provided <
,135%of the required minimum
:outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 6 of 10
Section Mechanical Rough-In 1 Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
' & Req.ID 1
6.5.3.7 Required minimum outdoor air ❑Complies
[ME109]2 i rate is the larger of minimum ;❑Does Not
'outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
'standards.Outdoor air ventilation
systems shall comply with one of
the following: a) design minimum
system outdoor air provided <
,135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1. �.. >
6.5.3.3 Multiple zone VAV systems with ❑Complies ;See the Mechanical Systems list
[ME42]3 DDC of individual zone boxes ❑Does Not for values.
have static pressure setpoint
reset controls. ['Not Observable
❑Not Applicable
6.5.3.3 Multiple zone VAV systems with ❑Complies ;See the Mechanical Systems list
[ME42]3 DDC of individual zone boxes Does Not ;for values.
have static pressure setpoint
reset controls. ❑Not Observable
:Not Applicable
6.5.4.2 i HVAC pumping systems with >= ❑Complies
[ME25]3 3 control values designed for ❑Does Not
variable fluid flow(see section
details). ❑Not Observable
Elliot Applicable
6.5.6.1.1 :Exhaust Air Energy Recovery for ❑Complies
[ME56]1 !Nontransient Dwelling Units ❑Does Not
❑Not Observable
DNot Applicable
6.5.6.1.2 Exhaust air energy recovery for ❑Complies
[ME111]1 spaces other than Nontransient ❑Does Not
dwelling units meeting Tables
6.5.6.1.2-1, and 6.5.6.1.2-2. Not Observable
❑Not Applicable
6.5.7.2.1 Kitchen hoods>5,000 cfm have ❑Complies
[ME32]2 !make up air>=50%of exhaust ❑Does Not
;air volume.
❑Not Observable
['Not Applicable
6.5.7.1 Conditioned supply air to space ❑Complies
[ME100]2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow,
required ventilation rate, exhaust' Not Observable
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies
[ME100]2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow,
required ventilation rate, exhaust( ['Not Observable
flow minu the available transffer DNot Applicable
air(see section details).
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 7 of 10
Section
Mechanical Rough-In Plans Verified Field Verified Complies? Comments/Assumptions
• & Req.ID Inspection Value Value
6.5.3.8 Occupied standy controls for ❑Complies
[ME112]' zones serving rooms that are ❑Does Not
required to have automatic
'partial OFF or automatic full OFF ❑Not Observable
lighting controls per Section pilot Applicable
9.4.1.1 shall meet the following
within five minutes of all rooms in
that zone entering occupied-
standby mode: a)Active heating
set point shall be setback at least
1°F, b)Active cooling set point
shall be setup at least 1°F and
c)All airflow supplied to the zone
shall be shut off whenever the
space temperature is between
the active heating and cooling
set points.
6.5.7.2.4 Approved field test used to ElComplies
I[ME49]3 evaluate design air flow rates t❑Does Not
and demonstrate proper capture
and containment of kitchen :Not Observable
exhaust systems. :❑Not Applicable
6.5.81 Unenclosed spaces that are ❑Complies
[ME34j2 ':heated use only radiant heat. ElDoes Not
['Not Observable
❑Not Applicable
6.5.9 Hot gas bypass limited to: <=240 ❑Complies
[ME35]1 :kBtu/h- 15%>240 kBtu/h-10% ❑Does Not
:Not Observable
❑Not Applicable
6.5.9 IHot gas bypass limited to: <=240 ❑Complies
[ME35]1 kBtu/h- 15%>240 kBtu/h- 10% ❑Does Not
:Not Observable
".i❑Not Applicable
6.4.3.9 Heating for vestibules and air ❑Complies
[ME6312 curtains with integral heating ❑Does Not
include automatic controls that
shut off the heating system when ['Not Observable
outdoor air temperatures> 45F. ❑Not Applicable
Vestibule heating and cooling
systems controlled by a
thermostat in the vestibule with
heating setpoint <= 60F and
cooling setpoint>=80F.
6.5.10 'Doors separating conditioned ❑Complies
[ME73]3 space from the outdoors have ❑Does Not
controls that disable/reset
heating and cooling system when ['Not Observable
open. 'ONot Applicable '
Additional Comments/Assumptions:
1 High Impact(Tier 1) A Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 8 of 10
Section
Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
8.4.2 At least 50%of all 125 volt 15-and ❑Complies
[EL10]O 20-Amp receptacles are controlled by ❑Does Not
an automatic control device. ['Not Observable
❑Not Applicable
8.4.3 New buildings have electrical energy ❑Complies
[EL11]2 use measurement devices installed. ❑Does Not
Where tenant spaces exist, each
tenant is monitored separately. In ❑Not Observable'.
buildings with a digital control system ❑Not Applicable i
the energy use is transmitted to to
'control system and displayed
graphically.
10.4.1 Electric motors meet requirements !❑Complies
[EL9]z where applicable. ❑Does Not
;DNot Observable'.
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) I .' Medium Impact(Tier 2) 13` Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22
Data filename: Page 9 of 10
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies
[FI3]3 deadband. '❑Does Not
[Not Observable I
❑Not Applicable
6.4.3.2 Temperature controls have setpoint ;OComplies
(F120]3 overlap restrictions. ❑Does Not
ONot Observable
ONot Applicable
6.4.3.3.1 :HVAC systems equipped with at least ❑Complies
[FI21]3 one automatic shutdown control. ❑Does Not
[Mot Observable
❑Not Applicable
6.4.3.3.2 Setback controls allow automatic OComplies
(F122]3 restart and temporary operation as '❑Does Not
required for maintenance. ONot Observable
:ONot Applicable
6.4.3.12 Air economizer has a fault detection ❑Complies
[F120013 and diagnostics(FDD)system (see iODoes Not
details for configuration and ;❑Not Observable
operational requirements).
DNot Applicable
6.4.3.12 Air economizer has a fault detection ;❑Complies
(FI200]3 and diagnostics(FDD)system(see ❑Does Not
details for configuration and ONot Observable
operational requirements).
,ONot Applicable
6.4.3.6 When humidification and ;❑Complies
(FI6)3 dehumidification are provided to a [--]Does Not
zone,simultaneous operation is
prohibited. Humidity control prohibits ❑Not Observable
the use of fossil fuel or electricity to ONot Applicable
produce RH > 30%in the warmest
zone humidified and RH <60%in the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings DComplies
[F1713 submitted within 90 days of system ❑Does Not
acceptance.
❑Not Observable
ONot Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies
(FI8]3 systems within 90 days of system ❑Does Not
acceptance.
ONot Observable
pilot Applicable
6.7.2.3 An air and/or hydronic system ❑Complies
[F1911 balancing report is provided for HVAC ODoes Not
systems serving zones >5,000 ft2 of
conditioned area ONot Observable
ONot Applicable
10.4.3 Elevators are designed with the ❑Complies
[F12412 proper lighting,ventilation power,and ❑Does Not
standby mode.
ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) $Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: PCC 236 Report date: 10/10/22