Loading...
Report (2) OFFICE COPY RECEIVED COMcheck Software Version COMcheckWeb OCT 20 1 Mechanical Compliance Certificate 3Jj p,NFn'vs(onl MEC z022._-C gl Project Information lOCoc Cuf'ctina\ LYl Energy Code: 90.1 (2019) Standard Project Title: PCC 236 Location: Tigard, Oregon Climate Zone: 4c Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 6600 SW Cardinal Ln Oregon Louis Leon Tigard,Oregon 97224 Protemp Associates Inc 9788 SE 17th Ave, 9788 SE 17th Ave Milwaukie, Oregon 97222 5035193083 louis@protmp.com Mechanical Systems List QuantitySystem Type & Description 1 HVAC System Heating: 1 each- Duct Furnace, Gas,Capacity= 162 kBtu/h Proposed Efficiency =80.00%Ec, Required Efficiency: 80.00%Ec Cooling: 1 each-Single Package DX Unit, Capacity= 124 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency = 11.00 EER, Required Efficiency= 11.00 EER Proposed Part Load Efficiency= 14.60 IEER, Required Part Load Efficiency = 12.70 IEER Fan System: FAN SYSTEM 1 --Compliance(Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 1 Supply, Constant Volume,4000 CFM,3.1 motor nameplate hp, 1.00 fan energy index,fan exception: Single fan < 1 HP or< 0.89 kW SYSTEM VERIFICATION REQUIRED. 1 HVAC System Heating: 1 each-Duct Furnace, Gas,Capacity= 121 kBtu/h Proposed Efficiency=80.00%Ec, Required Efficiency: 80.00%Ec Cooling: 1 each-Single Package DX Unit, Capacity= 94 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency= 11.00 EER,Required Efficiency= 11.00 EER Proposed Part Load Efficiency= 14.60 IEER, Required Part Load Efficiency= 12.70 IEER Fan System: FAN SYSTEM 2--Compliance(Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 2 Supply, Constant Volume. 3000 CFM,3.1 motor nameplate hp, 1.00 fan energy index SYSTEM VERIFICATION REQUIRED. Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 90.1 (2019)Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. // 40C/� .wall C$4 /ro/U/27 Name-Title Signature Oat JJl Project Title: PCC 236 I Report date: 10/10/22 Data filename: Page 1 of 10 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 90.1 (2019) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies 6.4.4.2.1, calculations provide all information ❑Does Not 6.7.2 with which compliance can be EPR211 determined for the mechanical ❑Not Observable systems and equipment and !❑Not Applicable j document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and 'handbooks. 4.2.2, Plans, specifications, and/or ;❑Complies 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be ['Not Observable 8.7 determined for the electrical s stems [PR67P and equipment and document where ❑Not Applicable exceptions are claimed.Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.5.2 Commissioning shall be performed as ❑Complies [PR5]' stated in Sections 5.9.2, 6.9.2, 7.9.2, ❑Does Not 8.9.2, 9.9.2, 10.9.2, 11.2(d), and [Plot Observable' 'G1.2.1(c).Commissioning must utilize !ASHRAE/IES Standard 202 or other ❑Not Applicable 'generally accepted engineering 'standards acceptable to the building official. FPT and verification requirements for commissioning are as stated in Section 4.2.5.1. Commissioning shall document compliance of the building systems, controls,and building envelope with required provisions of this standard. ;Commissioning requirements shall be incorporated into the construction documents. Additional Comments/Assumptions: 1 High Impact(Tier 1) L Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 2 of 10 Section Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.7 Freeze protection and snow/ice ❑Complies (F09]3 melting system sensors for future ODoes Not connection to controls. ❑Not Observable.. j❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3` Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 3 of 10 Section Mechanical Rough-In Plans Verified Field Verified Inspection Value Value Complies? Comments/Assumptions ' & Req.ID 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency:_ ❑Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values. [ME1)2 equipment labeled as meeting 90.1. ,❑Not Observable ❑Not Applicable 6.4.3.4.1 ;Stair and elevator shaft vents " ❑Complies [ME3]3 have motorized dampers that ODoes Not automatically close. ;, N ❑Not Observable Not Applicable 6.4.3.4.2, Outdoor air and exhaust systems ❑Complies 6.4.3.4.3 have motorized dampers that ❑Does Not [ME4]3 automatically shut when not in ° use and meet maximum leakage ❑Not Observable rates.Check gravity dampers ❑Not Applicable where allowed. 6.4.3.4.5 Enclosed parking garage Complies [ME39]3 ventilation has automatic ❑Does Not contaminant detection and capacity to stage or modulate ❑Not Observable fans to 50%or less of design ❑Not Applicable capacity. 6.4.3.4.4 Ventilation fans >0.75 hp have ❑Complies [ME5]3 automatic controls to shut off fan ❑Does Not when not required. ,ONot Observable iONot Applicable 6.4.3.8 Demand control ventilation ❑Complies [ME6]' provided for spaces>500 ft2 and ❑Does Not >25 people/1000 ft2 occupant density and served by systems Not Observable with air side economizer, auto ❑Not Applicable modulating outside air damper control,or design airflow >3,000 cfm. 6.5.3.2.1 DX cooling systems >= 75 kBtu/h fi❑Complies See the Mechanical Systems list [ME40]2 (>= 65 kBtu/h effective 1/2016) Oboes Not for values. and chilled-water and evaporative cooling fan motor hp ❑Not Observable >= 1/4 designed to vary supply ❑Not Applicable fan airflow as a function of load and comply with operational requirements. 6.4.4.1.1 Insulation exposed to weather ❑Complies [ME7]3 protected from damage. `ODoes Not Insulation outside of the conditioned space and associated ❑Not Observable with cooling systems is vapor ❑Not Applicable retardant. 6.4.4.1.2 HVAC ducts and plenums R- R- ❑Complies [ME8]2 insulated per Table 6.8.2.Where ❑Does Not ducts or plenums are installed in or under a slab,verification may ❑Not Observable need to occur during Foundation ElNot Applicable Inspection. 6.4.4.1.3 HVAC piping insulation thickness. I in. _in. ;❑Complies [ME9)2 Where piping is installed in or Not under a slab,verification may need to occur during Foundation ONot Observable Inspection. 1=INot Applicable 6.4.4.1.4 Thermally ineffective panel ElComplies [ME41]3 surfaces of sensible heating ^0Does Not panels have insulation >=R-3.5. ❑Nat Observable ❑Not Applicable 1 High Impact(Tier 1) I a Medium Impact(Tier 2) 3]Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 4 of 10 Section Mechanical Rough-In Plans Verified Field Verified Inspection Value Value Complies. Comments/Assumptions ' & Req.ID 6.4.4.2.1 Ducts and plenums having ,DComplies [ME10]2 pressure class ratings are Seal ❑Does Not Class A construction. ❑Not Observable ❑Not Applicable 6.8.1-15, -:Electrically operated DX-DOAS ;:E❑Complies 6.8.1-16 units meet requirements per Does Not [ME11012 Tables 6.8.1-15 or 6.8.1-16. ❑Not Observable ' ❑Not Applicable 6.4.4.2.2 Ductwork operating >3 in.water LJComplies [ME11]3 column requires air leakage ❑Does Not testing. ❑Not Observable ❑Not Applicable 6.4.4.2.2 Ductwork operating >3 in.water ❑Complies [ME11]3 column requires air leakage ❑Does Not testing. ID Not Observable ❑Not Applicable 6.5.2.3 Dehumidification controls ;❑Complies [ME19]3 provided to prevent reheating, ❑Does Not recooling, mixing of hot and cold airstreams or concurrent heating ,❑Not Observable and cooling of the same ❑Not Applicable airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies [ME68]3 mounted preheating jackets have ❑Does Not preheat auto-shutoff value set to activate when humidification is ['Not Observable not required. ❑Not Applicable 6.5.2.4.2 Humidification system dispersion ❑Complies [ME69]3 tube hot surfaces in the ❑Does Not airstreams of ducts or air- handling units insulated>= R- DNot Observable 0.5. ❑Not Applicable 6.5.2.5 Preheat coils controlled to stop DComplies [ME70]3 heat output whenever ❑Does Not mechanical cooling, including economizer operation, is active. ❑Not Observable III Not Applicable 6.5.2.6 Units that provide ventilation air ❑Complies [ME106]3 to multiple zones and operate in ❑Does Not conjunction with zone heating and cooling systems are DNot Observable prevented from using heating or ❑Not Applicable !. heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies [ME72]2 < 1 hp are electronically- ❑Does Not commutated motors or have a minimum motor efficiency of ❑Not Observable 70%.These motors are also ❑Not Applicable speed adjustable for either balancing or remote control. 1 High Impact(Tier 1) j 2 I Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 5 of 10 Section Mechanical Rough-In Plans Verified Field Verified Inspection Complies? Comments/Assumptions & Req.ID p Value Value 6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies [ME7212 < 1 hp are electronically- ❑Does Not commutated motors or have a minimum motor efficiency of ?❑Nat Observable 70%.These motors are also ❑Not Applicable speed adjustable for either balancing or remote control. 6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies 1ME108]2 terminals have automatic 40Does Not controls to a)turn off the `f terminal fan except when space ❑Nat Observable heating is required or if required ❑Not Applicable for ventilation; b)turn on the terminal fan as the first stage of heating before the heating coil is activated; and c)during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air. 6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies [ME108]2 terminals have automatic a❑Does Not controls to a)turn off the ;terminal fan except when space ❑Not Observable heating is required or if required ..,❑Not Applicable •for ventilation; b)turn on the terminal fan as the first stage of heating before the heating coil is activated; and c)during heating for warmup or setback temperature control, either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air. 6.5.3.7 Required minimum outdoor air ❑Complies [ME10912 rate is the larger of minimum El Does Not outdoor air rate or minimum exhaust air rate required by :Not Observable Standard 62.1,Standard 170,or ❑Not Applicable applicable codes or accreditation standards.Outdoor air ventilation ti systems shall comply with one of 44, the following: a) design minimum system outdoor air provided < ,135%of the required minimum :outdoor air rate, b)dampers, ductwork,and controls allow the system to supply<=the required minimum outdoor air rate with a single set-point adjustment.,or c)system includes exhaust air energy recovery complying with Section 6.5.6.1. 1 High Impact(Tier 1) 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 6 of 10 Section Mechanical Rough-In 1 Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions ' & Req.ID 1 6.5.3.7 Required minimum outdoor air ❑Complies [ME109]2 i rate is the larger of minimum ;❑Does Not 'outdoor air rate or minimum exhaust air rate required by ❑Not Observable Standard 62.1,Standard 170,or ❑Not Applicable applicable codes or accreditation 'standards.Outdoor air ventilation systems shall comply with one of the following: a) design minimum system outdoor air provided < ,135%of the required minimum outdoor air rate, b)dampers, ductwork, and controls allow the system to supply<=the required minimum outdoor air rate with a single set-point adjustment.,or c)system includes exhaust air energy recovery complying with Section 6.5.6.1. �.. > 6.5.3.3 Multiple zone VAV systems with ❑Complies ;See the Mechanical Systems list [ME42]3 DDC of individual zone boxes ❑Does Not for values. have static pressure setpoint reset controls. ['Not Observable ❑Not Applicable 6.5.3.3 Multiple zone VAV systems with ❑Complies ;See the Mechanical Systems list [ME42]3 DDC of individual zone boxes Does Not ;for values. have static pressure setpoint reset controls. ❑Not Observable :Not Applicable 6.5.4.2 i HVAC pumping systems with >= ❑Complies [ME25]3 3 control values designed for ❑Does Not variable fluid flow(see section details). ❑Not Observable Elliot Applicable 6.5.6.1.1 :Exhaust Air Energy Recovery for ❑Complies [ME56]1 !Nontransient Dwelling Units ❑Does Not ❑Not Observable DNot Applicable 6.5.6.1.2 Exhaust air energy recovery for ❑Complies [ME111]1 spaces other than Nontransient ❑Does Not dwelling units meeting Tables 6.5.6.1.2-1, and 6.5.6.1.2-2. Not Observable ❑Not Applicable 6.5.7.2.1 Kitchen hoods>5,000 cfm have ❑Complies [ME32]2 !make up air>=50%of exhaust ❑Does Not ;air volume. ❑Not Observable ['Not Applicable 6.5.7.1 Conditioned supply air to space ❑Complies [ME100]2 with mechanical exhaust<=the ❑Does Not greater of criteria of supply flow, required ventilation rate, exhaust' Not Observable flow minu the available transffer ❑Not Applicable air(see section details). 6.5.7.1 Conditioned supply air to space ❑Complies [ME100]2 with mechanical exhaust<=the ❑Does Not greater of criteria of supply flow, required ventilation rate, exhaust( ['Not Observable flow minu the available transffer DNot Applicable air(see section details). 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 7 of 10 Section Mechanical Rough-In Plans Verified Field Verified Complies? Comments/Assumptions • & Req.ID Inspection Value Value 6.5.3.8 Occupied standy controls for ❑Complies [ME112]' zones serving rooms that are ❑Does Not required to have automatic 'partial OFF or automatic full OFF ❑Not Observable lighting controls per Section pilot Applicable 9.4.1.1 shall meet the following within five minutes of all rooms in that zone entering occupied- standby mode: a)Active heating set point shall be setback at least 1°F, b)Active cooling set point shall be setup at least 1°F and c)All airflow supplied to the zone shall be shut off whenever the space temperature is between the active heating and cooling set points. 6.5.7.2.4 Approved field test used to ElComplies I[ME49]3 evaluate design air flow rates t❑Does Not and demonstrate proper capture and containment of kitchen :Not Observable exhaust systems. :❑Not Applicable 6.5.81 Unenclosed spaces that are ❑Complies [ME34j2 ':heated use only radiant heat. ElDoes Not ['Not Observable ❑Not Applicable 6.5.9 Hot gas bypass limited to: <=240 ❑Complies [ME35]1 :kBtu/h- 15%>240 kBtu/h-10% ❑Does Not :Not Observable ❑Not Applicable 6.5.9 IHot gas bypass limited to: <=240 ❑Complies [ME35]1 kBtu/h- 15%>240 kBtu/h- 10% ❑Does Not :Not Observable ".i❑Not Applicable 6.4.3.9 Heating for vestibules and air ❑Complies [ME6312 curtains with integral heating ❑Does Not include automatic controls that shut off the heating system when ['Not Observable outdoor air temperatures> 45F. ❑Not Applicable Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint>=80F. 6.5.10 'Doors separating conditioned ❑Complies [ME73]3 space from the outdoors have ❑Does Not controls that disable/reset heating and cooling system when ['Not Observable open. 'ONot Applicable ' Additional Comments/Assumptions: 1 High Impact(Tier 1) A Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 8 of 10 Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies [EL10]O 20-Amp receptacles are controlled by ❑Does Not an automatic control device. ['Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies [EL11]2 use measurement devices installed. ❑Does Not Where tenant spaces exist, each tenant is monitored separately. In ❑Not Observable'. buildings with a digital control system ❑Not Applicable i the energy use is transmitted to to 'control system and displayed graphically. 10.4.1 Electric motors meet requirements !❑Complies [EL9]z where applicable. ❑Does Not ;DNot Observable'. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) I .' Medium Impact(Tier 2) 13` Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 9 of 10 Section Final Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies [FI3]3 deadband. '❑Does Not [Not Observable I ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ;OComplies (F120]3 overlap restrictions. ❑Does Not ONot Observable ONot Applicable 6.4.3.3.1 :HVAC systems equipped with at least ❑Complies [FI21]3 one automatic shutdown control. ❑Does Not [Mot Observable ❑Not Applicable 6.4.3.3.2 Setback controls allow automatic OComplies (F122]3 restart and temporary operation as '❑Does Not required for maintenance. ONot Observable :ONot Applicable 6.4.3.12 Air economizer has a fault detection ❑Complies [F120013 and diagnostics(FDD)system (see iODoes Not details for configuration and ;❑Not Observable operational requirements). DNot Applicable 6.4.3.12 Air economizer has a fault detection ;❑Complies (FI200]3 and diagnostics(FDD)system(see ❑Does Not details for configuration and ONot Observable operational requirements). ,ONot Applicable 6.4.3.6 When humidification and ;❑Complies (FI6)3 dehumidification are provided to a [--]Does Not zone,simultaneous operation is prohibited. Humidity control prohibits ❑Not Observable the use of fossil fuel or electricity to ONot Applicable produce RH > 30%in the warmest zone humidified and RH <60%in the coldest zone dehumidified. 6.7.2.1 Furnished HVAC as-built drawings DComplies [F1713 submitted within 90 days of system ❑Does Not acceptance. ❑Not Observable ONot Applicable 6.7.2.2 Furnished O&M manuals for HVAC ❑Complies (FI8]3 systems within 90 days of system ❑Does Not acceptance. ONot Observable pilot Applicable 6.7.2.3 An air and/or hydronic system ❑Complies [F1911 balancing report is provided for HVAC ODoes Not systems serving zones >5,000 ft2 of conditioned area ONot Observable ONot Applicable 10.4.3 Elevators are designed with the ❑Complies [F12412 proper lighting,ventilation power,and ❑Does Not standby mode. ONot Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) $Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: PCC 236 Report date: 10/10/22 Data filename: Page 10 of 10