Loading...
Permit " CITY OF TIGARD MECHANICAL PERMIT 1 COMMUNITY DEVELOPMENT Permit#: MEC2022-00682 Date Issued: 9/14/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 2S111ACO2901 Jurisdiction: Tigard Site address: 9500 SW MURDOCK ST Project: Templeton Elementary Subdivision: None Lot: None Project Description: Mechanical work for building remodel. Contractor: AMERICAN HEATING INC Owner: TIGARD-TUALATIN SCHOOL DISTRICT 23J 5035 SE 24TH AVE 6960 SW SANDBURG ST PORTLAND,OR 97202-4765 TIGARD,OR 97223 PHONE: 503-239-4600 PHONE: FAX: 503-239-7038 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 09/08/2022 $4,086.23 Class of Work: ALT Type of Const: VB Plan Review 09/08/2022 $1,021.56 Occupancy Grp: E Occupancy Load: 12%State Surcharge-Mechanical 09/08/2022 $490.35 Stories: Info Process/Archiving-Lg$2.00(over 09/08/2022 $10.00 11x17) Project Valuation: $150,575.00 Info Process/Archiving-Sm$0.50(up to 09/08/2022 $28.00 11x17) Fuel Air Handlers Fuel Types: Natural Gas Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 6 Appliances Vent Fans: Vent Systems: Total $5,636.14 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may o i copy of the rules Issued By: / (i)t ,' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Applicati FOR OFFICE USE ONLY City of Tigard ° ?I FOR 7 # 2 ,IN .4 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 JUL 2 8 [UL2 PlanRevrew Otherpermlc Inspection Line: 503.639.4175 Date Re _� TIG?,It I> I> /l( (i`_ Date Ready/By: brie ® See Page 2for Internet: www.tigald-or.gov CITY OF 1 f(AH(71. Notified/Method;el Supplemental information ,I 'II ("Tr _ . . Mechanical permit fees*are based on the value of the work ❑New construction ®Addition/alteration/replacement performed Indicate the value(rounded to the nearest dollar)of all mechanical materials,equipment,labor,overhead,and profit ❑Demolition [-.3 Other: Value:$150575 ❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special information use checklist ❑Multi-family ❑Master builder ❑Other: Description I Qty. I Ea I Total Heating/cooling: Air conditioning 46.75 Job site address: 9500 SW Murdock Street Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: Tigard,OR 97224 '.f 1/1IP +On Eley]ney r Furnace 100,000+BTU(ducts/vents) 54.91 Suite/bldgJapt.no.: I Project name:Templeton Core Equip.Pkg(422163) Duct pump 61.06 v Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 • Subdivision I Lot no.: Other: 2332 Other fuel appliances: Tax map/parcel no.: Water heater 2332 Gas firpkmermsert 3339 1 Flue vent for water heater or gas Replace(6)existing rooftop packaged ACs and( )gas-bred MAIL.(3)of the existing RTUs will reuse the existing fireplace 2332 curbs(like-for-like exchange),(3)RTUs will get curb adapters,and the MAU will get a new standard curb. Log lighter(gas) 23.32 Wood/pellet stove 3339 Wood fireplace/insert 23.32 --- Chimney/liner/flue/vent 23.32 Other. 23.32 n ....- m- Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartarents,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 • ' �"'"x"""a ` "" `. `:, Other. 23.32 � 4i� un}"�' 't sV+ i 'i�, . Business name: American Heating Fuel piping• S14.15 for first four;S4.03 for each additional Contact name: Melina Swalko Furnace,etc. Gas nut) Address: 5035 SE 24th Ave heat p Wall/suspended/unit heater City/State/ZIP: Portland,OR 97202 Water heater Phone: 503-239-4600 Fax:: Fireplace Range E-mail: m.swalko@americanheting.net Barbecue , a�• ,;, r k: Clothes dryer(gas) Business name: American Heating Address: 5035 SE 24th Ave Subtotal City/State/ZIP: Portland,OR 97202 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone: 503-239-4600 Fax: State surcharge(12%of permit fee) CCB lic.: 33135 TOTAL PERMIT FEE This permit application expires 1f a permit is not obtained within 180 Authorized Melina Swalko 4+eau•e.s.ara days after it has been accepted as complete. s.n•«.ae®.m.�,n..s,*,�a.rauri.area Signature: :aaam.,ams.,w se • Fee methodology set by Tri-County Building Industry Service Board Print name: Melina Swalko Date: 07/13/22 1:1Buildiaa\PerminMEC PermitApp 040113.doc 440-4617T(11/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial &Multi-Famil Fee Schedule: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits\MEC_PermitApp_04o113.doc 2 City of Tigard III COMMUNITY DEVELOPMENT DEPARTMENT T 1 c A :D Building Permit Review — Commercial - No Land Use Building Permit #: j/%C e-g2\0-�--00l%D - Site Address: 1.660 .'(/U AitV(dOc.' J Suite/Bldg#: Project Name: TemQtt (pry to 19 CYG Q (147, 1 (3) G re.puzN- } (Name of commercial business occupying the space. I vacant,enter Spec Space.) Planning Review Proposal: -f,Q lif;( V.:(v S I NnA-v Existing Business Activity: GA Proposed Business Activity: SGkaa0\ erify site address/suite# exists and active in permit system. `NgiV River Terrace Neighborhood: ❑ Yes No Zoning: � •11 ermined Use: AYes ❑ No ❑ Spec Space 21°Confirm no land use required. OS Business License: Exists: ��'t Yes ❑ No,applicant was provided y d a business license application Notes: 4 CSDre6 Ye 1'nstalfr t a( re [aft fhae if frOecl pn'-' iv (" oth;19 f tiha4 insr°' Approved by Planning: ,---n--- Date: 71 - /22 Revisions (after Building Submittal only) Reviewer Date Revision 1: E Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved MEOW;,a Building Permit Submittal Original Submittal Date: 7/4)!2-2_ Site Plans: # Building Plans: # Building Permit#: _iEnter building permit#above. Workflow Routing: El—Planning n er. it-C inator 21-13-uilding Workflow Sign-off Sign-off for Planning(include notes from planning review) Route Application Documents: ...2—Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ‘.. Date: / I:\Building\Forms\BldgPennitRvw_COM_NoLandUse 111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to App Revision Notice 2: Date Sent to A•.licant: Revision Notice 3: Date Sent t. • pplicant: ❑ SDC Fees Entered: Wash 'o Trans Dev Tax: ❑ Yes 0 N/A T •. d Trans SDC: ❑ Yes 0 N/A arks SDC: ❑ Yes 0 N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:Building\Forms\BldgPennitRvw_COM_NoLandUse_111819.docx t .4 , �. Melina Swalko From: Amanda Bostic Sent: Thursday, July 28, 2022 8:12 AM To: Melina Swalko Subject FW: Templeton Core - New RTU Scope - City permit Importance: High g FYI RECE \ D Amanda Bostic JUL 2 8 `Of Assistant Project Manager UN OF TiGfjr'U 5035 SE 24th Ave. Portland,OR 97202 0: (503) 239-4600 ext 214 C: (971) 678-2094 BUILDING DIVISIONM y office hours are from 7:30 AM -4:30 PM (Monday-Friday) a.bostic©americanheating.net Click here to securely send me large files AMERICAN HEATING INC. ttsitT CON TRUST MAAMERICAN HEATING OPERATES GREEN. Please consider the environment before printing this e-mail This message,including any attachments hereto,may contain privileged or confidential information and is sent solely for the attention and use of the intended addressee(s).If you are not an intended addressee,you may neither use this message nor copy or deliver it to anyone.In such case,you should immediately destroy this message and kindly notify the sender by reply email. Thank you. From:Tim McCullaugh <tim@triplettwellman.com> Sent:Wednesday,July 27, 2022 5:22 PM To: Brian Shea <brian@americanheating.net>; Amanda Bostic<a.bostic@americanheating.net>; Rick Luepton <rick@americanheating.net>; Steve Johnson <s.johnson@americanheating.net> Cc: David Rappleyea <david@triplettwellman.com> Subject:Templeton Core-New RTU Scope - City permit Importance: High Brian ( others from AHI team): Per our conversation,we were asked by the district to CALL OFF our crane pick for tomorrow. This was based on not having a mechanical permit for our intended work. As discussed, the City is still raising their hand about the requirement for screening. So.tip'uptiteydu...as of 3:46PM today, I received a call from the owner's rep stating that the City has OK'd the process of applying and granting a mechanical permit with the caveat that the project is not FINALED until the screening work is completed (or otherwise defined). It is nice to see that they are being reasonable to get this work done. 1 tr . A couple next steps: 1—Can the AHI team regather your permit documents and make a return trip to the City of Tigard to submit for the mechanical permit—hopefully tomorrow(Thursday or Friday)? 1A— Please bring with you the seismic calculations you sent over to our office previously—they are stamped by your engineer and are currently in our engineer's hands for a "conformance stamp" - Hopefully this isn't a deal breaker 2 - Let's see what we can do to RESTART the process, get the crane re-scheduled and teams back in queue for a pick of the units. Ultimately this is a site coordination thing for Rick and David to do, but I wanted you guys to have something in writing for your files. Thank you for working with us as we beat the balloon around the yard a bit. Overall, I still think we have a very good chance at completing this work before kids and staff return. In 6 months from now,this will be a distant memory (let's not talk about the screens...) Appreciate it. Tim McCullough irdiggitt PROJECT MANAGER Triplett Wellman, Inc. Weihnall 503.982.4188 503.982.0390 fax tim@trialettwellman.com 1717 Mt.Jefferson Ave PO Box 160 Woodburn,OR 97071 www.triplettwe Ilm a n,com FYI—Amanda—l also received your phone message and sometime tomorrow or Friday we will talk about contract values. 2