Plans (56) M EC2022 -00290
�,f:E C ZU 00 ,)-
<1( 31-/
� w
2'-8
NE TO BE CL1SERV
4 3 4 #31 I
#29 SODA MACHINE I E FAUCET
SUPPLIED BY CoCA-COLA 1/2"H/C CONN • HOT WATER CONNECTION
#28.1 NUGGET ICEMACHINE- ' 36"AFF
OVER SODA DISPENSER 3-1/2"D TO DW
3/8"CCONN O COLD WATER CONNECTION
83"AFF
1/2"D TO F/S
73"AFF (n
DIRECT WASTE DRAIN �
l yqk w
c� INDIRECT WASTE DRAIN
C
i
® GAS CONNECTION
#10/10.1 SOILED DISH TABLE #11 DISHWASHER
W/PRE-RINSE FAUCET 1/2"H CONN ISI
1/2"H/C CONN 62"AFF \` '�, FLOOR SINK
39"AFF 2"D TO F/S
12-3/4"AFF
AFF I
z
0
1 2
HAND SIN W
1/2"H/CC MECHANICAL/ PLUMBING KEY
38"AFF �p /
1-1/2"DTO DW - ---
32"AFF
It
#2 GAS GRIDDLE - #13 HANDS K �/�t' REP SINK W/
3/4"GAS CONN ___ I 1/2"H/C N ` L MOUNTED FAUCET
29"AFF 38"AFF 2" /4"HIC CONN
1-1/2"D TO W 8-3/4"AFF
32"AFF O F/S
Q 4"AFF
#2 GAS GRIDDLE I ===
3/4"GAS CONN
29"AFF
JED
I
#23 SOF SERVE #21.1 DIPPERWELL
#5 GAS FRYER I --- MACHINES(2) 1/4"C CONN
--- 1/2"C CONN
(2)1"GAS CONN I 31"AFF `
68"AFF 1"D TO F/S
10.7"AFF #14.1 DROP-IN
I HAND SINK 1/2"D TO F/S 27"AFF
66"AFF
I 1/2"H/C CONN
36"AFF
1-1/2"D TO DW 29 SODA MACHINE TO BE
--- H>�ND SINK _= 26"AFF fr SUPPLIED BY COCA-COLA
/2' FF CO c rn
38" FF V
\ \ 1-1/2 D TO DW
2
#33 COFFEE B EWER #21.1 NUGGET ICE MACHINE-
1/4"C CONN OVER SODA DISPENSER
Z LL
45"AFF 3/8"C CONN
�y
83"AFF
1/2"D TO F/S
73"AFF `.J
W
i
N 0 cn 0
FOODSERVICE MECHANICAL/ PLUMBING PLAN W M Q
1AI
SCALE: 1 /4" = 11-011 Y C7
a
a
PLUMBING SCHEDULE
ItemNo Quantity Category Cold Water (in) Cold Water Conn. Height(in) Hot Water (in) Hot Water Conn. Height(in) Filtered Water Size Filtered Water Conn. Height(in) Indirect Waste Size Direct Waste Size Direct Waste Conn. Height(in) Gas Size(in) GasConn.Height(in) Gas MBTU Plumbing Remarks
2 2 Griddle, Gas, Countertop
3/4" 29" AFF 135.0
5 1 Gas Fryer
1" 10.7" AFF 160.0 O w�'�
1 1" 10.7" AFF 160.0 J`
10 1 Soiled Dishtable 3-1/2" 1" faucet holes, 8" centers, 3-1/2" drain opening Equipawn, L
10.1 1 Pre-Rinse Faucet Assembly 1/2" 39" AFF 1/2" 39" AFF
11 1 Dishwasher, Door Type 1/2" 62" AFF 2"
13 3 Hand Sink 1/2" 38" AFF 1/2" 38" AFF 1-1/2" 32" AFF
14.1 1 Drop-In Sink 1/2" 36" AFF 1/2" 36" AFF 1-1/2" 26" AFF (1) set of 1/2" faucet holes, 4" OC
21.1 1 Spadewell Ice Cream Dipper Station 1/4" 31" AFF 1" SHEET NAME:
27 1 One (1) Compartment Sink (1) set of 1-1/8" faucet holes, 8" centers, 3-1/2" drain opening
27.1 1 Wall / Splash Mount Faucet 1/2" 38-3/4" AFF 1/2" 38-3/4" AFF 3-1/2" FOODSERVICE
28.1 1 Nugget Ice Maker 3/8" 83" AFF 1/2" Drain for ice maker
29.1 1 Nugget Ice Maker 3/8" 83" AFF 1/2" Drain for ice maker MECH ./ PLUMB.
31 1 Mop Sink 3-1/2" drain opening PLAN & DETAILS
31.1 1 Service Faucet 1/2" 36" AFF 1/2" 36" AFF 3-1/2" AT F/F
33 1 Coffee Brewer 1/4" 45" AFF
DRAWN: CHECKED:
FOODSERVICE MECHANICAL/ PLUMBING SCHEDULEGATE: L. DAVIDSON
ARCH:
3 25FEB2022
SCALE:
1/4" = 1'-0"
SHEET NUMBER
w
Q
0
}
M
ItemNo Quantity Category Mfr
_ -- = 1 1 Hood #1 - 1 : KITCHEN - Job #5005186 Captive-Aire
- - -
1 2 2 Griddle, Gas, Countertop Vulcan
3 2 Equipment Stand, Refrigerated Base Continental Refrigerator Y
` _ 4 2 Work Table, 36', Stainless Steel Top John Boos
5 1 Gas Fryer Frymaster 12of
1 Frymaster
6 3 Pizza Preparation Refrigerator Continental Refrigerator
7 2 Heated Shelf Food Warmer Nemco
10 1 Soiled Dishtable John Boos
20
10. 1 1 Pre-Rinse Faucet Assembly T&S Brass
z
I o
mr
11 1 Dishwasher, Door T e
American Dish
-
i m
III
� - Captive-Aire
11 . 1 1 Hood #2 - 11 . 1 : DISHWASHER Job #5005186 p
12 1 Clean Dishtable John Boos
13 3 Hand Sink GSW USA
14 1 Mega Top Sandwich / Salad Preparation Refrigerator Continental Refrigerator
14. 1 1 Drop-In Sink Advance Tabco
31
31 1 17 1 Refrigerated erated Work TopContinental R Refrigerator
7m
29 20 2 Locker GSW USA
28.1 '
21 1 Ice Cream Dipping Cabinet Global Refrigeration
21 . 1 1 Spadewell Ice Cream Dipper Station Nemco
- 22 1 Sandwich / Salad Preparation Refrigerator Continental Refrigerator
ILj� 23 2 Soft Serve Machine Taylor Company
- C 2 Taylor Company
24 2 Mixer, Drink / Bar Hamilton Beach
25 1 Microwave Oven Sharp Q
ILI
25. 1 1 Microwave Oven, Shelf John Boos
26 1 Shelf, Pass-Thru Pacific Stainless (�
27 1 One (1 ) Compartment Sink John Boos =
27. 1 1 Wall / Splash Mount Faucet T&S Brass U co
13 �� --- WALK-IN 1 Faucet, Spout / Nozzle T&S Brass
Z LL N
FREEZER
10 " 28 1 Soda Ice & Beverage Dispenser Lancer ; Q
11.1 12 38
��/,fes WALK-INER 28 1 1 Nugget Ice Maker Manitowoc
a9 COOLER � � O
3 13 271 29 1 Soda Ice & Beverage Dispenser Lancer p 0
25 0 3' 29. 1 1 Nugget Ice Maker Manitowoc U)
' 38 30 1 Reach-In Freezer Beverage Air lu C
17
31 1 Mop Sink John Boos
i --- 28
15
4 --_ 31 . 1 1 Service Faucet T&S Brass t
g a
37 °❑°❑°n°❑ 32 1 Food Topping Warmer, Countertop Server Products
■ ■
' 2 1 Storage Jar / Ingredient Canister, Metal Server Products
2 35 3 21 _ 33 1 Coffee Brewer BUNN �
4 I I 4
22 23 23 21.1 \�
O 1a.1 USTOM CABINETRY 34 1 Tea / Coffee Dispenser Winco ! se
29 35 1 Refrigerated Work Top Continental Refrigerator
8 34 29.1 i -
36 1 Heat Lamp Hatco
33
25 -NO+
1 Remote Control Enclosure Hatco
25.1
30 W NDOW PICK UP POS POS SHEET NAME:
013 37 1 Food Slicer, Electric Globe
38 1 walk-in cooler FAB FOODSERVICE
39 1 walk-in freezer FAB EQUIPMENT
PLAN
FOODSERVICE EQUIPMENT PLAN FOODSERVICE EQUIPMENT KEY
1 2 DRAWN:L. DAVIDSON CHECKED:
DATE: ARCH:
25FEB2022
SCALE:
1/4" = V-0"
SHEET NUMBER
��•r�. t IIS
REVISIONS
EXHAUST FAN INFORMATION - JOB 5005186 p DESCRIPTION DATE:
FAN MOTOR DISCHARGE WEIGHT p
UNIOT TAG QTY FAN UNIT MODEL # MANUFACTURER CFM ESP RPM ENCL HP BHP PHASE VOLT FLA VELOCITY (LBS) SONES p
1 KEX-1: KITCHEN LEFT 1 DU85HFA CAPTIVEAIRE 1840 1.000 1383 TEAO-ECM 1.000 0,4760 1 208 6.9 582 FPM 97 13.6 p BUNGLQN`�
2 KEX-2: KITCHEN RIGHT 1 DU85HFA CAPTIVEAIRE 1840 1.000 1383 TEAO-ECM 1,000 0.4760 1 208 6.9 582 FPM 97 13.6 Mi
O
4 DWX-L DISHWASHER 1 DUI2HFA CAPTIVEAIRE 500 0.500 1441 TEAO-ECM 0.250 0.1190 1 115 2.9 355 FPM 51 8,4 IE c
9
MUA FAN INFORMATION — JOB 5005186 E r
FAN EVAP EVAP COOLER EVAP COOLER EVAP COOLER EVAP COOLER 0 a C4
MIN DESIGN MOTOR WEIGHT
UNIT TAG QTY FAN UNIT MODEL # BLOWER HOUSING ESP RPM HP BHP PHASE VOLT FLA MCA MOCP FLOW RATE ENTERING DB ENTERING WB LEAVING DB LEAVING WB SONES
CFM CFM ENCL (LBS) L o t
NO (Gal/Hr) TEMP TEMP TEMP TEMP ' m v 0
3 MUA-1: KITCHEN 1 A2-D.250-20D 20MF-2-MOD A2-D,250 2000 3459 0,500 1457 TEFC,PREMIUM 3.000 1.7800 3 208 9.4 13A 20A 4.93 90,0°F 68,0°F 72,0°F 68,0°F 967 13,9 ' " a O C
xbn
Evap Flow Rate is variable based owater pressure, Z.
U W •0 fiT $�
GAS FIRED MAKE-UP AIR UNIT(S)
U)
FAN INPUT OUTPUT REQUIRED INPUT GAS BURNER �\ 23` I I I I 2 �l Qp
UNIT TAG BTUs BTUs TEMP RISE PRESSURE GAS TYPE EFFICIENCY(%) 23' III J N
0 G
3 MUA-1: KITCHEN 223307 205442 55°F 7 IN. W.C. - 14 IN. W,C, NATURAL 92 w N d v'
FANS #1 (KEX-L KITCHEN LEFT). #2 (KEX-2: KITCHEN RIGHT) - DU85HFA EXHAUST FAN I
M
FAN OPTIONS FEATURES: CURBED " I ' 00
FAN n I t19
-
UNIT TAG QTY DESCRIPTION - DIRECT DRIVE CONSTRUCTION (NO BELTS/PULLEYS). �/� ' I N
NO 31 7/8 - ROOF MOUNTED FANS. 26'
1 GREASE BOX. - RESTAURANT MODEL. 6�l rn
1 FAN BASE CERAMIC SEAL - INSTALLED AT PLANT - FOR GREASE DUCTS, - UL705 AND UL762 AND ULC-5645 NN
1 KEX-1 KITCHEN LEFT - VARIABLE SPEED CONTROL. 20 GAUGE
1 ECM WIRING PACKAGE - EXHAUST - MODBUS CONTROL -MSC- (TELCO), CCW ROTATION, STEEL
- INTERNAL WIRING, CONSTRUCTION. � 00
1 2 YEAR PARTS WARRANTY. - THERMAL OVERLOAD PROTECTION (SINGLE PHASE). �)
1 GREASE BOX, - HIGH HEAT OPERATION 300'F (149'C), N
1 FAN BASE CERAMIC SEAL - INSTALLED AT PLANT - FOR GREASE DUCTS, - GREASE CLASSIFICATION TESTING. 3' FLANGE, ro
2 KEX-21 KITCHEN RIGHT - NEMA 3R SAFETY DISCONNECT SWITCH. ' c 0
1 ECM WIRING PACKAGE - EXHAUST - MODBUS CONTROL -MSC- (TELCO), CCW ROTATION. ° / bil O v
1 2 YEAR PARTS WARRANTY, 30 I/2 NORMAL TEMPERATURE TEST , d z
EXHAUST FAN MUST OPERATE CONTINUOUSLY i
1 INLET PRESSURE GAUGE, 0-35', 23 ROOF OPENING 0 4
WHILE EXHAUSTING AIR AT 300'F (149'C) DIMENSIONS,
1 MANIFOLD PRESSURE GAUGE, -5 TO 15 WC. UNTIL ALL FAN PARTS HAVE REACHED / 22 1/2
1 MOTORIZED BACKDRAFT DAMPER FOR A2-D HOUSING. MEETS AMCA CLASS 1A RATING. THERMAL EQUILIBRIUM, AND WITHOUT ANY 22 1/2 �/ 00
fs
1 TOTAL CFM MONITORING FOR MUA UNITS. DETERIORATING EFFECTS TO THE FAN WHICH 00
GREASE DRAIN. WOULD CAUSE UNSAFE OPERATION. ' a)
1 IBT/MUA EVAP INTERLOCK.
1 FREEZE PROTECTION DRAIN KIT FOR IBT/MUA WITH EVAPORATIVE COOLERS, ABNORMAL FLARE-UP TEST PITCHED CURBS ARE AVAILABLE 01
3 MUA-1: KITCHEN 2 EXHAUST FAN MUST OPERATE CONTINUOUSLY FOR PITCHED ROOFS, > W
1 SHIP LOOSE GAS STRAINER 1'. WHILE EXHAUSTING BURNING GREASE VAPORS 0° c0i � � M
14 7/8
1 CURB DUCT HANGER, I I AT 600'F (316'C) FOR A PERIOD OF SPECIFY PITCHi 12' m ■� . N
15 MINUTES WITHOUT THE FAN BECOMING > t �
SIZE 2 DIRECT FIRED HEATER LOW CFM PROFILE PACKAGE, USED ON HEATERS UNDER 2500 EXAMPLE 7/12 PITCH = 30° SLOPE, cli i •� N
1 CFM, ANMAGED UNSAFEOANY CONDITION.NT THAT COULD CAUSE Q
1 UNIT MOUNTED VFD FOR USE WITH ECPM03, — u) M
22 1/2
1 2 YEAR PARTS WARRANTY, I I OPTIONS 1 >
1 ECM WIRING PACKAGE - MANUAL OR 0-10VDC REFERENCE SPEED CONTROL (TELCO MOTOR), GREASE BOX. r O
CCW ROTATION, 24 /4 FAN BASE CERAMIC SEAL - INSTALLED AT A+
4 DWX-1: DISHWASHER 1 SCR-12 BIRD SCREEN, / DUCTWORK BETWEEN PLANT - FOR GREASE DUCTS. LU W (n
ECM WIRING PACKAGE - EXHAUST - W �1/ •a
1 2 YEAR PARTS WARRANTY. EXHAUST RISER ON HOOD MODBUS CONTROL -MSC- (TELCO), CCW N M L
AND FAN (BY OTHERS). ROTATION. o
FAN ACCESSORIES 2 YEAR PARTS WARRANTY, N ■�
FAN EXHAUST SUPPLY t
UNIT TAG
NO GREASE GRAVITY WALL SIDE GRAVITY MOTORIZED WALL
CUP DAMPER MOUNT DISCHARGE DAMPER DAMPER MOUNT
1 KEX-11 KITCHEN LEFT YES
2 KEX-21 KITCHEN RIGHT YES
3 MUA-1; KITCHEN YES
4 DWX-11 DISHWASHER
CURB ASSEMBLIES
ON
NO FAN TAG WEIGHT ITEM SIZE
1 # 1 KEX-1: KITCHEN LEFT 44 LBS CURB 23,000'W X 23.000'L X 26.000'H ALONG LENGTH, RIGHT VENTED HINGED, 75 0
2 # 2 KEX-2: KITCHEN RIGHT 44 LBS CURB 23.000'W X 23.000'L X 26,000'H ALONG LENGTH, RIGHT VENTED HINGED. (L �1 � 3; ~
3 # 3 MUA-1: KITCHEN 90 LBS CURB 31.000'W X 79.000'L X 20.000'H ALONG WIDTH, RIGHT INSULATED, 1• LAYER OF INSULATION FACTORY C5 U o
# 3 RAIL 4.000'W X 4.000'L X 36.000'H RIGHT. INSTALLED IN INTERNAL BACK STANDOFF. rf11
MEETS 0 INCH INTERNALREQUIREMBACNTS FOR UI ('LJ
-
4 # 4 DWX-1: DISHWASHER 31 LBS CURB 17,500'W X 17.500'L X 26,000'H ALONG LENGTH, RIGHT, CLEARANCE TO COMBUSTIBLE SURFACES a
24' n/
12 o 12' Q) _ n
A
31 7/8 016' 016' I 48' 010' -/
24 3/4 L q
z
U.L. LISTED RECESSED OUND LED Q
FIXTURE AND LED LIG
U.L. LISTED L55 SERIES E26 CANOPY
LIGHT FIXTURE - HIGH TEMP ASSEMBLY.
24' 24' DATE: 7/26/2021
O 28' 28' 28' 28' O
I�uqDWG.#:
4' O'NDM./4' 0.00'OD. 5005186
IB' 1 --_-_- --_-_- 12'- '-_-_- --_-_- 12'- '-_-_- -_-_- 12' -_- -_-_- 12' -_-_ -_-_-
T r PLAN VIEW - HOOD # (1 1 .1 : DISHWASHERS D�BY kcurtis
9' 9' kL 9' � 9® 4' 0.00' LONG 4& S-VHB-G
o
— — SCALE:
3/4" = 1 '-0"
TOP VIEW 48 T 96' 48
MASTER DRAWING I
19 1/4' --�� 38 1/4' -� 38 1/2' -I-- 38 1/2' - 38 1/4' -� 46
16' O'NOM./16' 0.00'OD, M 4. 0
PI ANI WIFIAl - unnn #1 (1 • VlT(`I-1FN1)
SHEET NO.
6 CaptiveAire