Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (60)
M EC2022 -00255 OFFiCF- COPY J G E DECEIVED (N ° " 0 w � p > � C t0 U N 0p O I :BAR S 31012 00x Q s t fl Y OF TIGARD 3 I 3UILDING DIVISION U il 0 m , 6"rd. 6"rd. 4'1 6"rd. Z c supply return dryer exhaust o > 3 duct up. duct up. duct upduct up. ! 3 13 � GD-1 ELEC/DATA 912 CFM OFFICE COPY CITY OF TIGARD_ REVIEWED FOR CODE COMPLIANCE Approved: 1 OTC: I I Permit#inno1CS Address: ` M . Suite# By. Date: m 12 STO GE/UT ITY Vent Dryer up D6F EF I M11 OQ provide Dryer 1 4 --- - JJ Wall box and CONFERENCE Lint Trap. Route Line Sets up to roof. Condensate, pipe to nearest drain. C CRG-1 - - (Drain provided by others.) 18K 12x12 M FM 1 010 2 FC-3 O �/ 11 N T RTU-2 ■III A Id Q II ARnnORY l� W c BREAK ~ rn O N Z U 1zk VALIDITY OF PER ' I 77 N N z THE ISSUANCE OF A PERMIT O BASED ON CONSTRUCTION N DOCUMENTS AND OTHER v LJ ~ o z DATA SHALL NOT PREVENT a 7 �— ~ a 00 THE CODE OFFICIAL FROM B Z (n O o FC-2 O REQUIRING THE CORRECTION LLQ (D ICY OF ERRORS. OSSC 105.4 a LL C) W Y z LOBBY OFFICE LU 08 _ _ O z �� , 157 SF CORRIDOR Q _ wo ° W >- 0 000 Q € Q Q Q z °Ln L.0W@W < ' � Q : Q W O oCm O CO 0 a O - U RTU-3 OT aN Z Z m M 3 C) O 00 RG-1 1-01 29xCR -1 1 FM COACHES OFFICE 212x1 3 04 LLWAY FC-1 O 07 01 a Note: 9' Route all supply, return ° MENS EF Route Line Sets up to roof. and exhaust air duct in 2 Condensate, pipe toRECEPTION joist bays. nearest drain. (Drain provided by others.) C-1 12k _ m CRG-1 •_" - - M1'2] D-1 12 12x12 REVISIONS: 12x12 02 I I 12x12 160 CFM 1 0 F 1 m m m � P ATE OF I E 5 EF dP 3 FAMILY . m m m ' 06 N W ME 1K1 T-S -- - PRO1 NW FENCING 4_ 8"rd. 10"rd. 12"rd. 6"rd. 8"rd. 10"rd. 8"rd. - - - - - - DATE: 03/11/2022 supply return return supply supply return supply 8"rd. exhaust RE: Preliminary duct up. duct up. duct up. duct up. duct up. duct up. duct up. duct up. 6"rd. exhaust duct up. MAIN LEVEL OFFICE PLAN HVAC SHOP 1 MAIN LEVEL OFFICE AREA FLOOR PLAN - HVAC H S 11 N H5.11 1i4"=V-0" 3/18/2022 ■ I J T E " o � � ~ £ o m O 01 C t0 U N > � h GQ � Pl Q O � O N 6"rd. 6"rd. 4"rd. 6"rd. > m supply return dryer dryer dud dn.. duct dn.. duct dnF .. duct dn.. a o > 3 a 3 to 3 1 6"0 s„ 6"0 6"0 a "0 6 ER m 14"rtdct thr Y C m t 0 O U O m 6"rd. OSA duct through roof to Goose Neck elbow with screened cap. MEZZANINE 2 48"x18" 3, 107 SF Bird Screen End Cap M 2 T RTU-2 N a L� W ix6 r � O U� 17-4 U =20._D.i z t N z 18'-8" r-I iH " rn O D X 2D STRIPS a Uw1-4 Z ~ v 11 ,698 SF m W cn O D HP a 11 ` a� LL Q W W O Qm F— -j p z U) ZO 20" rd. Ductsox 20" rd. Ductsox 20"rd. Ductsox �� l �` 20" rd. Ductsox 20"rd. Ductsox 20" rd. DuctsoxE W Q O 0 O U 00 LU LU®4 =8=4" =18_4" =18,-4,. =18--20 �,. -1 .4„ �/ aI E z 4z z Go CO MEZZANINE MEZZANINE MAIN FLOOR Q = Q U T = J O = FLOOR LEVEL FLOOR LEVEL LEVEL y LU U oC CO O s O a O U m CD 00 3 REVISIONS: RTU 1 R -1 x FM VD SD-1 14x6 2 CFM - VD 0" 4"0 VD 12"0 J� V VD 8110 12"0 VD VD V 10"0 77 12"0 IT IN III ll 4 - - _ PRO]: NW FENCING 1/2022 8"rd. suL6"rd. suppy 6"rd. suppy 6"rd. su 6"rd. exhaust PPY 10"rd. return L10"rd. return PPY DATE: 03/1minary air duct dn. air duct dn. air duct dn. air duct dn. duct up RE: Preliminary air duct dn. air duct dn. through roof. MEZZ. LEVEL STRIPS PLAN HVAC SHOP 512 MEZZANINE LEVEL AND STRIPS FLOOR PLAN - HVAC ON LI i 2A 0 O m � 0 o 0 E C A 0 ° ; Co r � yQ ._ 30 O Ul fir, L rJ •- N � U > N n J 3 Z UU C j O > 3 _ � 3 W 3 O' 1 ©" iZ Relocated 12.5 ton Carrier Package RTU Gas/Electric Roof 3 Top. 48"x18" Bird Screen M End Cap N T RTU-3 2 LU jF 48 V/ O 16 U' N N U z ao'_o" ~ , N I8, _8„ U W z STRIPS 3° x 2° a W (! O N 11 ,698 SF U- p w Yo > cn <W _jO wo ° W } U 20"rd. DuGtsox 20"rd. Ductsox 20" rd. Ductsox �� � 20" rd. Ductsox 20"rd. Ductsox 20" rd. Ductsox Z z U00 O Ln _ Q _ = U Q ® ? 0•��/ m m O U O 0 a U m zz 3 V CM W 3 REVISIONS: PRO]: NW FENCING _ 4 DATE: 03/11/2022 e RE: Preliminary MEZZ. LEVEL SRTIPS PLAN HVAC SHOP 1 MEZZANINE LEVEL AND STRIPS FLOOR PLAN - HVAC N 5.126 1/4"=1'-0" 3/18/2022 H 5 . 12 B J G o v N E C U N > 00 O i N Q Ot C J. O W i cr' M M N U i > = a w 0 C 0 C r O > 3 �t 3 i ~ U 6"rd.exhaust duct from 4"rd.dryer duct ERV-1 out 6"rd.exhaust ! W out through roof through roof. duct from EF-4 ? _ to dryer vent cap out through roof ti i c t O m E 0 6"rd. Outside Intake through roof to serve ERV-1 Provide Gooseneck elbow with RTU screened cap 2 Relocated 12.5 ton Carrier Package Gas/Electric Roof Top. M 2 14 F 14 FN 00 H LU O 4••x4"wood 1.75" N NU 10'-00" sleepers (typ) I z T--I z min. distance 116.25" from edge of roof STRIPS w U W O N 3 z Mitsubishi 3.5 ton heat pump 11 ,698 SF - a W (/) O N condensing unit set on roof HP � w W z mounted on sleepers. 0 �-- a Route refrigeration line sets = _ = a) w down to wall hungductless indoor fan coils. - m O z z O 00 Q . Q W >- Q 'DElf ,.w/ w�// > z z U00 ED Ln LL 0. > Q z J Q =- Q _ _ O F- UL LU m m 0 U _ m zz O 00 3 REVISIONS: RTU Relocated 3 ton 1 Carrier Package Gas/Electric Roof Top- - - - - - PROJ: 4 NW FENCING 201.25' DATE: 03/11/2022 16'-09 4" RE: Preliminary MECHANICAL ROOF HVAC SHOP 1 MECHANICAL ROOF PLAN - AREA "A" - HVAC 5.13 1/4"-V-0" 3/18/2022 N H5n13A C N o � J � o E A O Ol C (U U N > � O N m Q C 0, 00 Q _ � � O N _ L M 0 U a 3 N Z OU A C � O O V � 3 W O 1 ©� _ Z � Q Relocated 12.5 ton Carrier Package RTU Gas/Electric Roof 3 Top. M 1-4 a � 2 w ~ � O U� NN U ty53 .75•.5• Pa U wON z z STRIPS ; 0 ~ VoN a 11 ,698 SF Q) IL p LU w LU � w > a O 100 zZo O LU >- 0 U 0 o > zz 00 > Q Luw o g z Q € Q Ln U _ O Q , Q o m O m U O 0 a U � a y z Z CIOo 00 14 IRV 3 REVISIONS: PROD: NW FENCING I, f_ _- - DATE: 03/11/2022 - - - - RE: Preliminary MECHANICAL ROOF PLAN HVAC SHOP 5138 MECHANICAL ROOF PLAN - AREA °B" - HVAC 3182022 (1)N H 5 . 13B o a N E o c o 0 o O) c co U N ci7 > m N c Q C 00 Q _ < C o rj N 4 0 t r Ls 0 U > N a i 0 z ° .! WALL HUNG DUCTLESS FAN COIL SCHEDULE o > 3 7 3 c0 3 COOLING CAP. HEATING CAP. AIR FLOW ELECTRICAL UNIT UNIT TOTAL EAT (F) TOTAL EAT (F) RATE VOLTS PHASE MCA RECOMMENDED DISC. WEIGHT NOTES ©�zs TAG MANUF. TYPE LOCATION MODEL NUMBER v (BTUH) DB WB (BTUH) DB WB (CFM) FUSE SIZE BY � F; MITSUBISHI WALL HUNG RECEPTION MSZ-GL12NA 12,000 80 67 14,400 70 43 145 - 399 208-230 1 1 N/A ELEC. 22 1, 2 x FZ MITSUBISHI WALL HUNG LOBBY MSZ-GL12NA 12,000 80 67 14,400 70 43 145 - 399 208-230 1 1 N/A ELEC. 22 1, 2 3 MITSUBISHI WALL HUNG CONFERENCE ROOM MSZ-GL18NA 18,000 80 67 21,600 70 43 258 - 646 208-230 1 1 N/A ELEC. 28 1, 2 NOTES: 1. PROVIDE FAN COIL UNITS WITH HANDHELD WIRELESS REMOTE CONTROLLER 2. CONDENSATE PUMPED OR GRAVITY DRAINED TO NEAREST DRAIN OR EXTERIOR OF THE BUILDING. HEAT PUMP OUTDOOR UNIT SCHEDULE EFFICENCY CONDENSOR UNIT UNIT TAG MANUF. TYPE LOCATION MODEL COOLING HEATING COOLING CAP. HEATING CAP. ELECTRICAL WEIGHT NOTES NUMBER (LBS.) EER IEER COP SCHE TOTAL (MBH) TOTAL (MBH) VOLT PHASE MCA MOCP DISC. BY ;q MITSUBISHI CONDENSING UNIT ROOF MXZ-5C42NA2 12.1/13.2 19.7/24.4 3.61/4.01 25.3/29.1 40,500 45,000 208/230 3 32.5 40 ELEC. 189 1 NOTES: 1. CONDENSING UNIT SET ON ROOF ON SLEEPERS. M N Lu ENERGY RECOVERY VENTILATOR UNIT (LOSSNAY) SCHEDULE AIR EXCHANGE EFFICIENCY UNIT ,, nn N O ESP UNIT MANUF. TYPE LOCATION MODEL VOLUME ENTHALPY ELECTRICAL DIMENSIONS WEIGHT V fV N Z TAG NUMBER IN. WC. TEMPERATURE OF (CFM) COOLING % HEATING % VOLT PHASE AMPS MCA MOCP DISC. BY LENTGH WIDTH HEIGHT (LBS.) NOTES U O� 0 Lu R PANASONIC ERV MEZZANINE PSF FV 10VE2 100 0.1 32 60 75 120 1 1.7 ----- --- ELEC. 28 Z" 23" 8 'g 53 z F- Z U v CL W NOTES: @ W z N LLL Q W Y 1 J U) a a' N O V/ W N E/) Lr) m Z Zo W } Q O o0 U 00m Ln EXHAUSTFANS > Q z Z FAN MOTOR o O = MODEL AIRFLOW ESP SPEED INLET BRAKE POWER DISC. °o 01� m O m UNIT MANUF. NUMBER TYPE SONES VOLT PHASE DRIVE AREA SERVED NOTES t O d O (CFM) (IN WC) (RPM) dBA (HP) (HP) BY Z Z ;F PANASONIC FV-20VQ3 CEILING 190 0.1 696 <0.3 ----- ----- ----- 120 1 DIRECT MC MEN'S 407 1 m ZF PANASONIC FV-20VQ3 CEILING 190 0.1 722 <0.3 I ---- ----- ----- 120 1 DIRECT MC WOMENS 406 1 O 0 EF PANASONIC 05-11VU CEILING 80 0.1 722 <0.3 ----- ----- ----- 120 1 DIRECT MC FAM./ASSIT405 2 3 ,F PANASONIC 05-11VK2 CEILING 50 0.1 722 <0.3 --- ----- ----- 120 1 1 DIRECT MC STOR/UTIL 412 3 NOTES: 1. CONTROLLED BY MOTION SENSOR MODEL LUTRON MS-VPS5M-WH 2. PROVIDE WITH HUMIDITY CONDENSING SENSOR MODULE PANASONIC MODEL FV-CSK1AND PANASONIC MOTION SENSOR MODULE MODEL FV-MSVK1 3. PROVIDE WITH HUMIDITY CONDENSING SENSOR MODULE PANASONIC MODEL FV-CSK DRYER BOOSTER FAN FAN MOTOR MODEL AIRFLOW ESP SPEED INLET BRAKE POWER DISC. UNIT MANUF. NUMBER TYPE SONES VOLT PHASE i DRIVE AREA SERVED NOTES (CFM) (IN WC) (RPM) dBA (HP) (HP) BY ;F FANTECH DBF-110 INLINE 150 0.2 2900 ----- ----- ----- ----- 120 1 DIRECT MC STOR/UTIL. 412 1 NOTES: 1 CONTROLLED BY INTEGRAL PRESSURE SENSING SWITCH. REVISIONS: PACKAGED GAS/ELECTRIC ROOF TOP UNIT ELECTRICAL COOLING HEATING (BTUH) UNIT UNIT MANUF. TYPE LOCATION MODEL NUMBER TONNAGE VOLTS PHASE MCA RECOMMENDED DISC. WEIGHT NOTES TAG (BTUH) EER INPUT OUTPUT FUSE SIZE BY (LBS.) CARRIER GAS/ELECTRIC STRIPS 48TCED14E3A6A6B0 12.5 140,000 10.8 224,000 184,000 460 3 33 40 ELEC. 1167 1, 2 PROD: NW FENCING e CARRIER GAS/ELECTRIC STRIPS/MEZZANINE 48TCED14E3A6A6B0 12.5 140,000 10.8 224,000 184,000 460 3 33 40 ELEC. 1167 1 , 2 DATE: 03/11/2022 RE: Preliminary e CARRIER GAS/ELECTRIC OFFICE AREA 48ES-A3606050 3 34,000 11.1 60,000 48,000 208-230 3 20.3 30 ELEC. 379 1, 2 f NOTES: 1. EXISTING PACKAGED GAS/ELECTRIC ROOF TOP UNIT TO BE RELOCATED EQUIPMENT ' 2. CONTROLLED BY SEVEN DAY PROGRAMMABLE THERMOSTAT SCHEDULES HVAC SHOP % H5 . 14 EIVED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 12021 24'-6 12" 24'-7- 24'-8" 24'-7" TY OF TIGARD tULDINGDIVISION EN G : NEERING + ac SIGN A 3933 S Kelly Avenue Portland, Oregon 97239 03.222.4453 B VLMK.COM --- K 1 0 0 U) E - - ADJACENT TENANT - I o --- K N I 1 1 J 1 2 3 4 5 PROJECT NAME A ROOF FRAMING PLAN NW FENCING D SK-1 1"=30'-0" INTERIOR TENANT IMPROVEMENTS 2 2 3 4 11117 SW GREENBURG ROAD a CUT BACK EXISTING SUB-PURLINS TIGARD, OR 97223 m AND SECURE WITH SIMPSON Q RELOCATED HVAC UNIT TO BEAR (E)PURLIN w 'HU26' FACE MOUNT HANGER (E)PURLIN w ON EXISTING K- MAX WEIGHT OR NEW FRAMING, = 1200 LBS (E)PURLIN w (E)PURLIN - - - - - RELOCATED HVAC UNIT TO BEAR NEW 4x8 HEADER,TYPICAL ON EXISTING OR NEW FRAMING, 2 2 MAX WEIGHT=600 LBS 1 K-1 K-1 1 (E)PURLIN NEW 4x8 HEADER,TYPICAL - ------- NEW 4x8 HEADER,TYPICAL 2 REVISIONS (E)PURLIN 1 (E)PURLIN Q Q ® _ DATE DESCRIPTION K 1 RELOCATED HVAC UNIT TO BEAR (E)PURLIN CUT BACK EXISTING SUB-PURLINS (E)PURLIN m m 1 03/16/22 ADDED RTU ON EXISTING OR NEW FRAMING, AND SECURE WITH SIMPSON w CUT BACK EXISTING SUB-PURLINS w MAX WEIGHT= 1200 LBS 'HU26' FACE MOUNT HANGER AND SECURE WITH SIMPSON 'HU26'FACE MOUNT HANGER (E)PURLIN - - - - - - m (E)PURLIN g 4 w w In (E)PURLIN w (E)PURLIN 1 B ENLARGED HVAC FRAMING PLAN rCNENLARGED HVAC FRAMING PLAN D ENLARGED HVAC FRAMING PLAN Q SK-1 1/4"= T-0" 0 SK-1 1/4"= 1'-0* Q SK-1 1/4"= 1'-0" PROFESS UNIT CASING �V\S G I Ne "0 3 3 UNIT BASE AND BASE RAIL 7 E SECURE ANCHOR TO UNIT WITH AT#11/2"O2 OIC REGON TEK SCREWS O v o SECURE ANCHOR TO CURB S �j 9 ZO A j I 1 1 16 GAUGE x 0'-6"BENT SHAPE, SCREWS AT 1 1/2 2"WOOD qFC ✓. LUNID03/17/22 j 1 1 ON LONG SIDES OF UNIT, LAP WOOD NAILER EXPIRES: 12/31/2022 1 1 1/2"MIN WITH BASE RAIL HVAC UNIT AND CURBj 1 HVAC UNIT AND AND NAILER UNIT MOUNTING CURB BY UNIT 1 1 BY OTHERS 1 CURB BY OTHERS 1 1 1 1 MANUFACTURER(14" HEIGHT) DATE MARCH 01,2022 1 1 GALVANIZED SHEET METAL MINIMUM 2x P.T. LEVEL SCALE PROJ. NO. COUNTER FLASHING PLATFORM BY CONTRACTOR AS NOTED 20200503 SIMPSON 'HUS48' FACE MOUNT 1 HANGER TYPICAL 1 1 i DRAWN CHECKED ROOFING BY OTHERS EXISTING ROOF SHEATHING, ERO MJL 1 1 1 1 REMOVE UNDER UNIT AS REQUIRED - - - - - - - - - - - - - - j j 1 1 STRUCTURAL HVAC SECURE CURB TO SUPPORT FRAMING WITH#12 I j CORNERANDOAT2-0 O.C. MAXIMUM PLANS AND D SCREWS AT EACH FRAMING PER FRAMING PER PLAN,TYPICAL SUPPORT FRAMING PER PLAN 1 1 PLAN,TYPICAL �`----� SPACING, SCREWS MUST BELONG DETAILS SIMPSON'HUS48'FACE MOUNT 1 1 ENOUGH TO PENETRATE SUPPORT ��-----� EXISTING PURLIN HANGER,TYPICAL FRAMING 2"MINIMUM r 1 HVAC SUPPORT DETAIL K2 HVAC SUPPORT DETAIL 3 HVAC CURB DETAIL SK- 1 11/2"= V-0" 3/17/2022 2:31:58 PM