Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2022-00176 Date Issued: 8/30/2022 TBGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S126CA01100 Jurisdiction: Tigard Site address: 9009 SW HALL BLVD 100 Project: US Bank Subdivision: None Lot: None Project Description: New 476 sq.ft.ATM building in the Target parking lot. Contractor: RBP CONSTRUCTION LLC Owner: DAYTON HUDSON CORPORATION 13380 NW MILL CREEK KDRIVE BY TARGET CORP T-0345 BEAVERTON, OR 97005 PROPERTY TAX DEPT/TPN-0950 PO BOX 9456 MINNEAPOLIS, MN 55440 PHONE: 971-291-3812 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIIA Permit Fee-COM-New Construction 08/16/2022 $231.32 Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 08/16/2022 $27.76 Plan Review 07/18/2022 $150.36 Dwelling Units: 0 Wash Co Trans Dev Tax 08/16/2022 $504.46 Stories: 0 Height: 0 ft Tigard Trans SDC Improvement 08/16/2022 $381.54 Bedrooms: 0 Bathrooms: 0 Tigard Trans SDC Reimbursement 08/16/2022 $22.02 Value: $15,000 Info Process/Archiving-Lg$2.00(over 08/16/2022 $28.00 11x17) Info Process/Archiving-Sm$0.50(up to 08/16/2022 $48.00 Floor Areas: 11x17) Total Area: 0 DC Provision Review,COM TI-Ping 08/30/2022 $110.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,503.46 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You ay obtain a c y of the r s or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: 4 Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available Inspection date. This permit card shall be kept In a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each inspection. DocuSign Envelope ID:FC3BEADO-5E9C-449F-858F-01082C9EC007 Building Permit Application Commercial a r FOR OFFICE USE ONLY City of Tigard Received ' '� _ Date/Bv lam, tLi Permit No.: " 13125 SW Hall Blvd.,Tigard,OR 97223 �;� f �-� 7r' g Dan By.••���� Phone: 503-718-2439 Fax: 503-598-1960 Date/ey. JJJJJJ �-J�+I( RelatedPermtt T I CARD Inspection Line: 503-639-4175 Date Ready/By Jots See Page 2 for +- Internet: www.tigard-or.gov Notified/Method: 7918 �, 7 . I ®Supplemental Information Qr,L„tit\ \<,o* 1 11-ta,;-) 7/3/ TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees`are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ElCommercial/industrial Valuation: $ ❑Accessory building El Multi-familyNumber of bedrooms: ❑ Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 9009 SW Hall BLVD New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: w (',{1j rr J� -6 Project name: Flite ATM Tigard OR ram Covered porch area: square feet Cross street/directions to job site: Deck area: square feet East side of the Target parking lot along SW Hall BLVD Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST. . Subdivision: Lot#: Permit fees*are based-on the.value of the work performed. Tax map/parcel#:1 S 126CA01000 Indicate the vAlue(rounded to the nearest dollar).of all equipment,materials,labor,overhead,and the profit fot the' DESCRIPTION OF WORK work indicated on this application. Install a Walk up US Bank ATM in the parking lot of the Target on Valuation: $ 15,000 SW Hall BLVD. This project will use four (3) existing parking spots Existing building area: square feet" and convert them into t,nrn narking spots and the ATM station New building area: 476 square feet 0 PROPERTY OWNER 0 TENANT Number of stories: 1 Name: The Cafaro No tnwest Partnership Type of construction: i Address: 2445 Belmont Ave., P.O. Box 2186 Occupancy groups: City/State/ZIP: Youngstown, OH, 44504 Existing: Phone:(330)747 2661 Fax:( ) New: 1.2 APPLICANT ❑ CONTACT PERSON -- ° BUILDING PERMIT FEES* Business name: Klmley Horn (Please refer ta fee schedule) Structural plan review fee(or deposit): Contact name: Danielle Prescott "Ng FLS plan review'fee(if applicable): Address: 4582 S Ulster St #1500, Denver, CO 80237 4 City/State/ZIP: Denver CO, 80237 �` Total fees due upon application: �I'}' 1 4- PuO,a Amount received: Phone:( 7201897 6312 Fax: :( ) JX1�., ,_ 3 1� . E-mail Danleile.Prescott Cnl kimlp.y'-h fir^ COm PHOTOVOLTAIC SOLAR PANELSYSTEMFEES* Commercial and residential prescriptive-installation of CONTRACTOR (f -4,- roof-top mounted PhotoVoltaic Solar Panel System. I Business name: TBD R,_t 1 t'"Sl�K I\ -\c l r)".e f^,.w'f Submit two(2)sets of roof plan with connection details l / and fire department access.,along with the 2010 Oregon Address: \ 3? - ,1 J m,\\ C_A Oc- Solar Installation Specially Code checklist. City/State/Z1P: �^ L-- 4 Permit fee(includes plan review V ���` {l ` and administrative fees): $180.00 Phone:( I ct\ - Fax ( ) State surcharge(12%of permit fee): $21.60 CC13Lie.: t -1 1..'0 S `vL d`l Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained o e a within 180 days after it has been accepted as complete. Print name: //F.042 Date: 5/2/2022 * Fee methodology set by Tri-County Building Industry Service Board. a eoaF91A3ABi3B.. 1:ABuilding\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(Il/02/COM/WEB) City of Tigard 'PICOMMUNITY DEVELOPMENT DEPARTMENT i T l n jz D Building Permit Review — Commercial - With Land Use Building Permit #: 6uPliv,?-01--Gb/ ?(4, Site Address: °JODr Sty f cc_ Suite/Bldg#: Project Name: `F I r=.4i.x►o(o A1M (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: NeAA) . ieuC- lZV fy site address/suite#exists and active in permit sysstem. Terrace Neighborhood: ❑ Yes i� No d Use Case #: M rip ze)Zt O J q2 ..17-tu.s.,Match Approved Land Use: IIir Site Plan D Landscape Plan ❑ Other: Urban Forestry Plan ❑ Elevation Plan g Height: Maximum Height PAC Actual Height /4:41, Conditions Met: ❑ Prior to Submittal 0 Prior to Permit Issuance Business License: Exi ." ❑ Yes 0 No,applicant was provided a business license application yi Public Facilities Improvement (PFI)Permit: _ -- Required: ❑ Yes, applicant was notified .�J No7. Applied For: 0 Yes ❑ No, stop intake Notes: Approved by Planning: —— --,. Date: Sb/?'c Revisions (after Building Submittal on Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 6/30/83-- Site Plans: # Building Plans: # Building Permit#: er building permit#above. Workflow Routing: B-15 nning j sneering t Coordinator El—Btlii'ding Workflow Sign-off: P'S gn Off for Planning(include notes from planning review) Route Application Documents: wilding. original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: --. Date: 7/VI) I:\BuildinglFonnsBBldgPennitRvw_COM_WithLandUse 111819.docx _ I En,.iineering Review Slope at building pad: 24 C?PFI Permit#: 414.- Conditions "Met"prior to issuance of building permit 4,/✓- 2/Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes 2--No Assess Water Quantity Fee in-lieu: ❑ Yes 12/No LIDA Facility on lot: ❑ Yes C "No Add Fee: 0 Yes 0 No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: ago -0,7 Date: '7//1/yam,? Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved D Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Permit Coordinator Review *Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: Yes ❑ N/A Tigard Trans SDC: Yes 0 N/A mi \b Q J Parks SDC: ❑ Yes 'Ell N/A— r-N��M LIDA Fee: 0 Yes 4.N/A 7 OK to Issue Permit Approved by Permit Coordinator: v1 •`(6 Date: 'PA)"?)Z 1 I:\Building\Forms\B IdgPermitRvw_COM_WithLandUse_111819.docx TDT/TSDC Estimate 7/20/2022 9009 SW Hall BUP2022-00176 HP TDT& RESIDENTIAL TSDC RATES EFFECTIVE 7/1/21 NON-RES:TSDC CITYWIDE EFFECTIVE 7/1/21 0 Yes Project is in River Terrace ? CQ No * For TDT and residential formula has been replaced with published rate per unit. Former Use ITE Rate per Rate per TDT/TSDC Rate Type Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 $0.00 Vacant TSDC-Imp 1 0.00 $0 $0 0.00 $0.00 TSDC-Reim 1 0.00 $0 $0 0.00 $0.00 TSDC-RT 1 0 $0 0.00 $0.00 TDT 2 0 $0 0.00 $0.00 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 $0 0.00 $0.00 Did total TSDC need to be reduced to 80%of TDT? Use 1 No Use 2 No Total TDT and TSDCs Former Uses $0 Proposed Use ITE Rate per Rate per TDT/TSDC Use # Code PHVT PHVT Unit* # Units Amount Description TDT 1 911 $29,674 0.02 $504.46 ATM 17 sf TSDC-Imp 1 911 12.13 $8,905 $108,018 0.02 $381.54 TSDC-Reim 1 911 12.13 $514 $6,235 0.02 $22.02 TSDC-RT 1 0.00 $0 $0 0.00 $0.00 TDT 2 0.00 $0.00 TSDC-Imp 2 0.00 $0 $0 0.00 $0.00 TSDC-Reim 2 0.00 $0 $0 0.00 $0.00 TSDC-RT 2 0.00 $0 $0 0.00 $0.00 TDT 3 0.00 $0.00 TSDC-Imp 3 0.00 $0 0.00 $0.00 TSDC-Reim 3 0.00 $0 0.00 $0.00 TSDC-RT 3 0.00 $0 0.00 $0.00 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 No Use 3 No Total All TDTs &TSDCs Proposed Uses $908.02 Less: Total All TDTs &TSDCs Former Uses $0.00 Total All TDTs &TSDCs Net Increase $908.02 Total Net County TDT $504.46 Total Net TSDC-Imp $381.54 Total Net TSDC-Reim $22.02 Total Net TSDC RT Overlay $0.00 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $1,802 $1,345 Estimated Unmitigated Impact $1,297 $942 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 29% 30% Estimated Total Impact $3,147 $0 Estimated Unmitigated Impact $2,239 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Extended Combination SDC Calculator-091018-I:\Community Development\Permit Coordinator\SDC Calculators