Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (2)
ty ofTigard 114 COMMUNITY Ti DEVELOPMENT DEPARTMENT Building Permit Review — Residential Building Permit #: M STW2/ 0049 g Site Address: 14604 SW 79th Ave Project Name: Serenus Subdivision Lot#: 21 Planning Review P11•I ' EEO1%%vCC%PLAN W U t t HOUSE ThRWAR.t. HAV Proposal: New detached dwelling 4' 0121VEWA‘j [X Verify address/suite #active in Accela. D3 In River Terrace: ® No ❑ Yes,River Terra e ReviewAddendrrm Site Plan Elements: eErosion Control 1X3 copies of site plan on 8-1/2"x 11"or 11 x 17"paper Ptetained trees with drip line and tree protection measures fltDrawn to scale(standard architect or engineer scale) in Footprint of new structure(including decks)and FFE ®North arrow INUtility locations&easements(required for new and additions) [NSite address,project or subdivision name and lot number NjSidewalk/driveway approach flApplicant information(name and phone number) c:IJ.,Aac.at.ion-ef-wells./zzptic systems 1XLot dimensions and building setback dimensions [XStreet tree size,type and location ® o u ngs to a hed INStreet names (�£7eis>Yrtg arrertatea en site INComer elevations(2'contours if more than 4'differential) (2iLot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced? NYes ❑No impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? ❑Yes NNo ® Clean Water Services—Service Provider Letter(lot platted prior to 9/10/1995): Required: 0 Yes,applicant was notified 1i No Received: 0 Yes 0 No ® Water Meter Fixture Unit Worksheet—Additions,Remodels and ADUs Required: 0 Yes,applicant was notified 1t No Received: 0 Yes 0 No ® SDC Exemption for ADU applied for: 0 Yes Xi No Received: 0 Yes 0 No X) Public Facilities Improvement(PFI)Permit: Required: 0 Yes,applicant was notified No Applied For: 0 Yes 0 No,stop intake ® Land Use Case#: SUB2020-00001 51 Zoning: R-12 ►:� Required Setbacks: Front: 15 Rear: 15 Side: 5 Street Side: 15 Garage: 0 ® Building Height: Max. Height: 35' Actual Height: 22.5' IN Landscape Area: 20 °'o (N Lot Coverage Max: 80 Entrance I Set back no more than 8'from street-facing wall 0 Parallel to street or offset 45 degrees or less Windows 1131 Minimum 12%of area of all street-facing facades Garage door is behind widest street-facing wall 0 Yes 0 No,one of the following is met: ❑ Door re than 5'from wall and there is a covered porch extending beyond garage. ❑ Door extends no more 'from wall and there is a 12 sq ft.window above garage on 2"d floor. 0 Garage door width is ❑ 12'or less 50%or less of facade ❑ 60%or less and includes 7 of following: ❑ Covered porch 0 Recessed entrance Wall offset 0 1'Roof eave 0 Roof offset ❑ Fire shingles 0 Lap Siding 0 Roof pitch e hi ,or gambrel roof 0 Dormer ❑ Accent siding 0 Window trim 0 Window recess in o 0 Balcony Visual Clearance M Urban Forestry Plan ® Sensitive Lands: ❑ Yes No Type: 0 Conditions met prior to issuance of building permit Notes: Garage does not need to meet standards un 8.290.040C because access is taken fr m alley ® Approved By Planning: Date: tiI! /7--0 ?i( Revisions(after Building Submittal only) Revie er Date Revision 1: Approved 0 Not Approved TIM ZQy2 Revision 2: Approved ❑ Not Approved I:\Building\Forms\B IdgPermitRvw_RES_122419.4ocx Building Permit Submittal / Original Submittal Date: //f02/,02/ Site Plans: # 3 Building Plans: # `3 Building Permit#: ELL-Enter building permit#above. �/ Workflow Routing C'Planning El'tngineering Lr Permit Coordinator [ 'Building Workflow Sign-off: [ Sign-off for Planning(include notes from planning review) Route Application Documents: [Engineering: (1)copy of permit application,(1)site plan,(1)building plan and original plan review routing form. 1'. * ' ' * ' . `Erfitiilding: original permit application,site plans,building plans,engineer and t .. °. +. beam calculations and trust details,if applicable,etc. Notes: /9 By Permit Technician: _ ..trill Date: ///fl,2121 Engineering Review Niel-lope at building pad: 2,% C Conditions"Met"prior to issuance of building permit GVEasements (encroachments) per engineering conditions of approval and plat [O.-later Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 0'No Assess Water Quantity Fee in-lieu: 0 Yes 544o LIDA Facility on lot: 0 Yes D'No L'7 Final Plat Recorded: 0 NOT Approved by Engineering: Date: Notes: L!' Approved by Engineering: rrtbs, ,'--6-7 2AZ4-7 Date: 1242ZJ2.iZ/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ©'Approved 0 Not Approved T f ,Q{7 ►'� 3/I /Zv22 Revision 2: 0 Approved 0 Not Approved Permit Coordinator Review Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions(after Building Submittal only) Revision Notice 1: Date Sent to Applicant: i''l. 3,2.2022 Revision Notice 2: Date Sent to Applicant: (r SDC Exemption: 0 Received / Does not apply 0 SDC Fees Entered: Wash Co Trans Dev Tax: Yes 0 N/A Tigard Trans SDC: V Yes 0 N/A a, Parks SDC: J`J Yes 0 N/A LIDA 0 Yes 7 N/A OK to Issue Permit Approved by Permit Coordinator: AtV Date: It t2'3(202A 1:1Building\Forms\BIdgPermitRvw_RES_122419.docx FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard e COMMUNITY DEVELOPMENT DEPARTMENT r71 Transmittal Letter r I(;A Iz n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Site Plan Review Dept DATE RECEIVED: DEPT: BUILDING DIVISION FROM: Emerald Weeks FEB 2 2 2,027, COMPANY: DR Horton CITY OF Ti6iAliti PHONE: 503-222-4151 UILD N ! �,/ESION By: EMAIL: esweeks@drhorton.com RE: Serenus Lot 21 MST2021-00498 (Site Address) (Permit Number) Serenus (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. 3 Revisions: Site Plan Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): jai MARKS: Pulling house forward to have a 4'driveway,front setbacks are still met FOR OFFICE USE ONLY Routed to Permit Technician: Date: .?/s/'�� Initials:Apo/ Fees Due: E Yes E No Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit (per PE): ❑ Yes 14o E Done Applicant Notified: Date: °3/ /9) Initials: �j> C7 4