Loading...
PFI2021-00449 City of Tigard PFI#: ENGINEERING DEPARTMENT 2021-00449 . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK ec Pro t name: 00028164 � F—, TYPE 1—Franchise Utility Work performed by NWN,PGE, or utility Brief description of project: Cutting gas services to both locations below. agency Gas main is 16'west of center line. Two 4'X 5' hard surface cuts. F— TYPE 2—ROW Sidewalk/Driveway/Sewer We hope to complete work ASAP. Work performed for the purpose o£ • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 9640 SW Greenbur #Hse &#Church, Tigard main line tap Location (address if available): 9 9 F TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening NW Natural • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 250 SW Taylor St water service area City/State: Portland, OR Zip. 97204 I— TYPE 4—Small Cell Technology Phone: 971-979-9615 F— TYPE 5—Tigard Triangle Email: law@nwnatural.com Phone: 971-979-6047 NOTE: Type 1 and 2 applications may be Contact name: Jennifer Wood emailed to rowpermitsp_dgard-or.gov. Phone: Email: CONTRACTOR INFORMATION 0 Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Richard Girard Mailing address: Same City/State: Zip: Phone: 360-921-0314 Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? —Yes No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. J:!" r`''B"''"'0,-'s Jennifer Wood 12/17/21 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: Permit fee: Received by: Date: Approved by: Date: Notified by:---j-Date: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Pen-nit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY • ' STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? I Yes I No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal L Dimensions considered? (check all that apply): Small Cell Macro F Street Name How many install sites are proposed as part of this permit E Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: Public Right-of-Way Private Property L Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the L. General Notes (City,Water,Sewer,etc.) type&use: L. Street(Plan,Profile) L Water,Storm and Sanitary(Plan Profile) L. Water Quality Facilities L Grading L. Landscaping/Tree Plan L Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) L Details Traffic Sight Distance L Signing and Striping L Street Light Plan and Photometric F Engineers seal/signature F Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) L Traffic Report C Storm water Drainage Calculations L Geotechnical Report L. Preliminary Access Report(Sight Distance) L Proposed Plat Pathway Design L Water Provider Approval City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SW Edge of f avement Ditch ---4P Streetlight I •—•—.—•—•—• —r—•— f. i s � I ' T–�iojaos cf'SeliveiTine-- � I .;i Existing House Existing Driveway 01 IL I I � L afl 1 o Existing Shop 1 Powerpole I = I Q 1 I� 1 7roperty Line II Fire Hydrant(F H) � � I Scale: 'l"=30' � I I � � I � I I � � I d REQUIREMENTSTYPE 1 AND TYPE 2: MINIUM SKETCH pp North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 1 � 1 16' ro i N R(w)'80 (W) ro 481' #9640 1 N �i #9655 315' 180' 3 A � #9640 243' fV � N f O ik ik W 175' S DARE #9750 q 3 2 1 4281-2"'26 _ N 'v �O N O] #9754 100' (P) # # # 61' NW Natural PLAT: 1-040-019 COUNTY: WASHINGTON 11/24/21 10:2 (503)226-4211 TOWNSHIP: T01 S RANGE: R01 W SECTION: 26SW SCALE: 1 IN = 100 FT LTJ USER ID:GAZ 1 � 1 16' ro i N R(w)'80 (W) ro 481' #9640 1 N �i #9655 315' 180' 3 A � #9640 243' fV � N f O ik ik W 175' S DARE #9750 q 3 2 1 4281-2"'26 _ N 'v �O N O] #9754 100' (P) # # # 61' NW Natural PLAT: 1-040-019 COUNTY: WASHINGTON 11/24/21 10:2 (503)226-4211 TOWNSHIP: T01 S RANGE: R01 W SECTION: 26SW SCALE: 1 IN = 100 FT LTJ USER ID:GAZ 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 0 oto o N L CZ p 0 Q O w¢6 ) O oL M 0) DN O l t 0m cc H (L Q •• c •• U O� I � • L;s �. >o a I m ��U m� 1 T a) • (D a) E E �. a .� I •fi • 0 fi ;® • m (DEf •• Q E ,® • 0.20 o ._ • L Oa 6�v 3: � • C13 J" o LU i t r /� m ca m Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer" \ Z CQ C Speed A B C Space V C W O 20 SO ZOOCQ O 25 100 100 100 75 O ... 30 100 35 40 350 350 350 125 150 p Y 45 180 O O 50 500 500 500 210 Q 55 250 60 285 65 700 700 700 325 70 365 September 2016 Chapter 5 Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340— Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the "Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016