Permit (4) CITY OF TIGARD BUILDING PERMIT
= COMMUNITY DEVELOPMENT Permit#: BUP2022-00183
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 8/11/2022Parcel: 1 S135AI301003
Jurisdiction: Tigard
Site address: 10300 SW GREENBURG RD 490
Project: Arellano Law Subdivision: METZGER,TOWN OF Lot: 9
Project Description: TI for new tenant: Demolition,new walls,doors,relites,and finishes.
Contractor: WALEN CONSTRUCTION Owner: LINCOLN CENTER LLC
20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC
TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR
SAN FRANCISCO, CA 94104
PHONE: 503-718-6680 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IB Permit Fee-Additions,Alterations, 08/08/2022 $301.85
Occupancy Grp: B Occupancy Load: 9 Demolition
12/o State Surcharge-Building 08/08/2022 $36.22
Dwelling Units: 0 Plan Review 07/18/2022 $196.20
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 08/08/2022 $110.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 08/08/2022 $120.74
Value: $15,000 Info Process/Archiving-Lg$2.00(over 08/08/2022 $8.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $773.01
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTIOA Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through 52- -0090 u may obtain co y of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By. Permittee Signature: l G
Call 503.639.4175 by 7:00 a.m.for the next available inspection date. OOF
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
S omim2rcial FOR OFFICE USE ONLY
City of Tigard Received
"✓ g g " i �'
Date/By: Permit No.:
13125 SW Hall Blvd.,Tigard,OR 972ff! -„ Plan Review
® Phone: 503-718-2439 Fax: 503-598-1960 Date/B : 0• Related Permit
Inspection Line: 503-639-4175 `- Date Ready/By: 7ur s: ® See Page 2 for
Internet: www.tigard-or.gov ified/Metho Supplemental information
TYPE OF W REQIJAD DATA:1'-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 10300 SW Greenburg Road New dwelling area: square feet
City/State/ZIP: Tigard, Oregon Garage/carport area: square feet
Suite/bldg./apt.#: 490 Project name: Arellano Law Covered porch area: square feet
Cross street/directions to job site: Project located north of SW Oak Street, Deck area: square feet
south of SW Locust Street and east of Greenburg Road Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ 15,000
Work to include demolition, walls, doors, relites and finishes.
�- Existing building area: 1,229 square feet
New building area: 1,229 square feet
PROPERTY OWNER F ❑ TENANT Number of stories: 5
Name:Shorenstein Type of construction: I-B
I Address: 5335 Meadows Road, Suite 275 Occupancy groups:
City/State/ZIP: Lake Oswego, OR 97035 Existing: B
Phone:( 503)412-4844 Fax:( ) New: B
APPLICANT ` CONTACT PERSON BUILDING PERMIT FEES*
Business name:Mackenzie ase rtr to toe schedule
Structural plan review fee(or deposit):
Contact name: Shlee White
F
Address: 1515 SE Water Ave Suite 100 LS plan review fee(if applicable):
`- �
City/State/ZIP: Portland, OR 97214 Total fees due upon application:
Phone:(503)224-9560 Fax::( ) Amount received:
E-mail: awhite@mcknze.com
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Walen Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 20915 SW 105th Ave Solar Installation Specialty Code checklist.
City/State/ZIP: Tualatin, OR 97062 Permit fee(includes plan review $180.00
and administrative fees):
Phone:( 503)692-9002 Fax:( )
State surcharge(12%of permit fee): $21.60
CCB Lic.:223805 Total fee due upon application: $201.60
Authorized signature: Ashlee White `s»a' This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
*
Print name: AShlee White Date:06-28-2022 Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
„ r
City of Tigard - COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
13125 SW Hall Blvd. - Tigard, Oregon 97223 - 503.718.2439 - www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, 15,000
excluding painting and wallpapering: $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 3,750
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(� Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard
allCOMMUNITY DEVELOPMENT DEPARTMENT
Building Permit Review — Commercial - No Land Use
Building Permit #: '64 _
Site Address: /p 3W Sw (_'-� Suite/Bldg#:
Project Name: Ai?.p_a_, �-o 6,A*3
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal:
Existing Business Activity:
Propos usiness Activity:
Verify site address/suite#exists and active in permit system.
❑ Riyer Terrace Neighborhood: ❑ Yes No
rmitted Use: Yes El No El Spec Space
Confirm no land use required.
Business License:
Exists: ❑ Yes ❑ No,applicant was provided a business license application
Notes:
Approved by Planning: Date: 2�
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Appr ved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: _
Site Plans: #
Building Plans: # �j
Building Permit#: �n.��building permit#above.
Workflow Routing: I Planning ❑ Permit Coordinator Li'�ding
Workflow Sign-off: 49:B=
f for Planning(include notes from planning review)
Route Application Documents: g: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date '>
IAl3uilding\Forms\B1dgPermitRvw COM NoLandUse 111819.docx
Omsk
Transmittal for 2190955.44: N/A at City of Tigard Page 1 of 1
MACKENZIE .
1515 SE Water Ave.Suite 100•Portland OR 97214
PO Box 14310•Portland OR 97293
TEL:503.224.9560•NET:MCKNZE.COM•FAX:503.228.1285
Letter of Transmittal
65453-1
Date: June 30, 2022 Project Number: 2190955.44
To: City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attention:
Project Name: 103001 Lincoln -Suite 490/Arellano
Enclosed:
Quantity Medium Description Comment
3 Bond Full Permit Set For your review
1 Original Intake Form For your use
Remarks:
Signed: Ashlee White
Transmitted
Employee Delivery(AMW)
Via:
If enclosures are not as noted, kindly notify us at once.
http://www.grpmackweb.com/gm/transmittal/preview_transmittal.php?dbFetch=l&transm... 6/30/2022