Loading...
Report (3) 1 S Z,DIV oo� EcoFasten For Installers, By Installers r • OEM RATINGS RaxModuleSize ting** Class A System Fire Rating stem Voltage 1500 VDC se Rating 30A ation Conforms to UL STD 2703 ty 20 Year Material and workmanship 3 Markings Product listing label is located on the rail end-caps tch 2:12-12:12 Allowable Design Load Rating 10 psf downward,5 psf upward,and 5 psf lateral odule Size 24 sqft Orientation: Portrait or Landscape **Class A System fire rating with Type 1&2 PV modules.Any module-to-roof gap is permitted,with no skirt required.This rating is applicable with any roof attachment. NOTE:Mid Clamp,MLPE Clip,and MLPE Bracket have been evaluated for multiple use,position independent. UL 2703 Marking Example: ESDEC usSYSTEMi MFG ID CODE:XXX-MMYyyv 1234567 0000 01. Torque Specifications Component Torque(in-lb) Notes Lag Screw N/A Fully Seat.Use visual indicator of the black EPDM ring around the bonded washer for torquing. Mid-Clamp 144 End-Clamp 96 Rail Clicker Leveling Bolt 142 Pre-torqued upon delivery.Applies to Tile Hook and L-Foot/Clicker Hook Height Bolt N/A Lightly clamp hook to flush with top of next tile row Ground Lug N/A Refer to specific ground lug manufacturer's installation manual MLPE Clip 144 ' MLPE Mount 144 5 VERSION:2.0 REV DATE07/16/2020 SYSTEM COMPONENTS 1 C1ickFit Rail 1500033(2130mm) 1500034(3166mm) 1500035(4202mm) 2) Rail Splice {� 1008061 t 3. 3) CF Tile Hook and L foot 1500005-Tile Hook j 1500004-L foot ar-,r r fit I4) CF End Clamp See Section 10 j 5) CF End Cap fl` 1 1510041 (Black) 1510042(Grey) 6) CF Mid Clamp See Section 10 7) MLPE Mount 1510057 .w 8) MLPE Clip(Rocklt Clip 2.0) 9) Module Jumper 1500028 6 VERSION.2.0 REV DATE:07/16/2020 . REQUIRED TOOLS Checklist of tools and accessories Note:*Proper PPE shall be worn at all times* Tape measure Roof crayon or chalk(a chalk line can be helpful as well) 1 IV Cordless drill with torque adjustment and the following bits: 1/2"Hex socket 1/4"diameter drill bit.(Drilling length no less than lag bolt depth) • Brush for clearing debris from roof surface.Hint:Leaf blowers work well to remove any leftover moisture prior to installation. Torque wrench capable of 0-150 in-lbs 7 VERSION:2.0 REV DATE:07/16/2020 M= ARRAY LAYOUT Refer to span tables,locaIjurisdiction,ore ngineer of record specifications when determining setbacks from roof edges,attachment spans,etc. Mark the perimeter and corners of the array on the roof surface. *Add 3/4"to account for the gap between modules in each direction* Draw or snap chalk lines where the rails will be installed,(refer to module manufacturer specs to determine allowable mounting locations). Locate rafters within the area of the array.It may be necessary to shift the array East or West on the roof in order to fall within the rail cantilever specs(1/3)of span). Stagger rafters every row if required by the local jurisdiction,engineer of record,or company policy. /o V i.. A w+� r t 8 VERSION:2.0 REV DATE:07/16/2020 MMM INSTALLING CLICKFIT Pre-installing rail splices 1. Determine the number of rails required per row of modules. 2. Insert a rail splice into one rail.*Do not push it past the center bump.* 3. Slide the next rail onto the rail splice until the two rail ends meet. 4. Repeat steps 2 and 3 until the desired length is achieved.*This is usually easiest to do from the ground.* � r 400 i 9 � VERSION:2.0 REV DATE:07/16/2020 1 FLASHING AND L FEET Installation of flashing and L feet ClickFit for comp shingle roofs uses EcoFasten Solar's GFI watertight flashing system Other roof types may use different EcoFasten Solar attachments,see www.EcoPastenSolar.com for more information. Installation Steps: 1. Locate rafter lines from section 5.2. 2. Drill 1/4"pilot holes at all attachment points and back fill using roof-compatible sealant. 3. Separate shingles where flashing is to be installed.Insert the flashing so the top portion is under the next row of shingles North.Ensure the flashing is pushed to the third-course of shingle to prevent water infiltration through the vertical joints between shingles. 4. Align GFI flashing hole with pilot hole.Insert the lag bolt with pre-installed bonded washer through the L foot and EPDM grommet.Tighten the lag bolt until a ring of EPDM is visible around the circumference of the bonded washer. Tighten the lag until fully seated.The EPDM Ring visual indicator is the most effective way to ensure a watertight seal. Note the orientation of the L foot and Clicker.The two Clicker"arms"should be facing downslope' 10 VERSION:2.0 REV DATE:07/76/2020 M� INSTALLING TILE HOOKS 1. Locate rafters on the roof,mark the tiles to be removed.Hint:In some cases rafter tails are visible at the eaves of the roof,making it easy to find the rough location of the rafters.In other cases,the fascia board may have nail heads visible where it was attached to the rafters.In the worst-case a row of tiles may need to be moved to determine the rafter locations. 2. Slide the tile at the desired location upward to expose the roof sub surface.If the tile is to be notched, or if using a replacement flashing,remove it entirely.Clean the sub surface with a brush to remove any debris that could affect the sealing. 3. Locate the rafter center and mark it. 4. Place the tile hook with the hook itself in the valley of the next tile below.Drill one 1/4"pilot hole in the rafter center,taking care to keep the hook in the valley of the the below.Backfill this hole with a roof- compatible sealant.For flat tiles,try to avoid having the hook land directly under a joint between tiles, this will create a larger gap or more notching than necessary. 5. Install one 5/16"x 4"lag screw on the row of holes closest to the tile hook arm.If possible,install the screw in one of the three holes directly next to the arm.If the lag screw must be installed in one of the seven holes furthest from the arm(denoted by the red rectangle below),install three deck screws in the pattern shown by the green circles below. 6. Adjust the height of the tile hook as necessary using the bolt shown in the fourth image. 7. Flash the surrounding area and lag screw head with roof-compatible sealant as necessary.Refer to Tile Hook Subflashing Installation guide on the next page. 8. Replace the the that was moved and/or removed,or install the the replacement flashing.If it is to be notched,mark the the for notching.Notching can be done with a grinding wheel or by using a chisel. �.r yt� �� R•s� S. 11 VERSION:2.0 REV DATE:07/16/2020 CLICK • • " q Apply a continuous line of the roofing manufacturer's approved sealant on the Lower the sub-flashing over the tile hook base.It may underside of the ClickFit tile hook sub-flashing be necessary to move adjacent tiles to easily lower the to form a U-shape around the raised edges. sub-flashing onto the roof deck. k 4 'sad .r n EcoFasten recommends following the TRI guidelines Place the sub-flashing over the base of the tile hook so three-course sealing method.Start the three-course the flashing covers the entire base. sealing method by applying a layer of roofing mastic over the edges of the the hook sub-flashing. ,n Place strips of reinforcing fabric over mastic to cover approximately 2"from the edge of the Apply a final layer of mastic to completely cover sub-flashing in both directions.Place strips on the reinforcing fabric.The flashing is now installed the side first,then the top edge, and sealed. . INSTALLING THE RAIL 1. Place the rail in the Clickers. 2. Ensure the rails extend a minimum of 2"past the last attachments in each row and that each rail is aligned with the next row North and/or South. 3. Roll the rail into each Clicker,an audible"click should be heard.If attachments are extremely misaligned it may be necessary to loosen the leveling bolt,snap the Clicker onto the rail,then re-tighten the leveling bolt to 142 in-lbs. 4. Level the rail if necessary by loosening the bolt attaching the Clicker to the L foot or the hook. r' w *Ensure the tab on the Clicker is aligned with the rail edge as shown below* t 13 VERSION:2.0 REV DATE 07/16/2020 ® MODULE INSTALLATION 1.Install the end clamps on each rail on whatever end you are starting with. Snap the end clamp onto the rail. Slide the end cap onto the rail. Turn the leg of the end clamp around the cap. 2. Place the module on the rail. *Ensure module junction box is up-slope.* 3. Slide the module to the end clamp and align it with the array corners.Tighten the end clamp to 96 in-Ib. 14 VERSION:2.0 REV DATE:07/16/2020 MODULE INSTALLATION 6.6 Installing additional modules on the rail 1. Click amid clamp onto each rail. $ 2. Slide the mid clamps until they are flush with the side of the existing module. 3. Place and slide the next module firmly against fr the mid clamps.Align the bottom edges of the modules.Tighten mid clamps to 144 in-Ib. k 15 VERSION:2-0 REV DATE:07/16/2020 M= MODULE INSTALLATION 6.7 INSTALLING END CLAMPS AT THE END OF A ROW 1. Install the last mid clamps in the row. 2. Measure the rails from the last mid clamp to the module width plus P'. 3. Cut the rails at this mark.There is some adjustment in the end cap/clamp so it does not need to be a perfect cut. 4. Install end clamps and end caps,tighten to 96 in-Ib Alternative method: 1. Install the last module in the row,tighten the mid clamps. 2. Using a circular saw with a metal blade,or carefully with a reciprocating saw,cut the rail approximately I"past the edge of the last module. 3. Install end clamps and end caps,tighten to 96 in-Ib 16 VERSION:2.0 REV DATE:07/16/2020 M= MODULE INSTALLATION 6.8 Installing additional rows of modules 1. Place the first module of the next row against the end clamps. 2. Temporarily place a mid clamp in the N-S gap between rows of modules,slide the modules up to the mid clamp as shown below. 3. Once the modules are aligned tighten the end clamps. 4. Install Dynobond clip on the bottom lip of the module frames to bond rows together. 5. Repeat steps 6.5-6.7 until the array is complete. 17 VERSION.2.0 REV DATE.07/16/2020 1 BONDING AND GROUNDING Bonding Paths All bond paths are carried either module-to-module through the mid clamp,or module-to-module through the modulejumper shown below(bond paths shown in green): CF Mid Clamp Module Jumper 2 mid clamps banding pairs o modules ,- r-r 1 module jumper bondlr)g row to row 1 ground lug per r ' continuous array l � y, Rail Spice ✓`:, J 40\ IIS r 1 splice bonding adjacent pairs of rails 18 VERSION:2.0 REV DATE:07/16/2020 ME= BONDING AND GROUNDING 7.2 Grounding GROUNDING LUG INSTALL pis SL Install ground lug on the module per ground lug and module manufacturer's instructions NECESSARY COMPONENTS: On of the following ground lugs(or any UL 2703 compliant ground lug): BurndyCL50-1TN Ground Lug(UL 2703-E3514343/UL 467-E9999) ILSCO SGB-4 Ground Lug(UL 2703-E354420 I UL 467-E34440) ILSCOGBL-40BT(UL2703-E354420 I UL467-E344401 ILSCO GBL-4DBTH(UL 2703-E354420/UL 467-E34440) ILSCO GBL-455(UL 2703-E354420 I UL 467-E34440) This system needs to be grounded in accordance with the National Electrical Code,ANSI/NFPA 70. *Copper wire should not come in direct contact with aluminum at any point on the array* 7.3 MLPE Clip Installation(Optional) INSTALL MLPE CLIP ACCESSORY Determine mounting location of the MLPE and MLPE Clip on the module frame.Take care not to block drainage q holes on the frame. Push the nut/bolt of the MLPE Clip so the carriage bolt head is furthest away from the stainless plate. Slide the bolt shaft into the slot on the MLPE mounting flange. Place the assembly onto the module flange,MLPE mounting flange on the far face(upper side)of the module frame flange,stainless plate on the closer face (bottom side)of the module frame flange. Hold the carriage bolt into the MLPE mounting flange slot with your finger,this will keep the carriage bolt from spinning in the slot.Tighten the nut to 144 in-lbs using a 1/2"hex socket. MLPE CLIP IS COMPATIBLE WITH: • Enphase Products:M250-72,250-60,M215-60,C250-72,S230,5280,IQ 6,IQ 6+,IQ,IQ7,IQ 7A,IQ 7+,IQ 7X,Q Aggregator • SolarEdge Products:P300,P320,P340,P370,P400,P405,P485,P505, P600,P700,P730,P800p,P800s,P850,P860 • See page 21 for compatible module list with MLPE Clip 19 VERSION:2.0 REV DATE:07/16/2020 low MLPE MOUNT INTALLATION E Lower the MLPE Mount to the rail Tilt and hook the top"dog ear"of the rail Slide the microinverter flange between the 6ml��. gaxqira. ffl.A115.311111RA77H -MLPE Mount and the serrated bolt flange 7 Tighten the bolt to 144 in-lbs Repeat this process for all other microinverter and/or optimizer installations MLPE MOUNT IS COMPATIBLE WITH: Enphase Products:M250-72,250-60,M215-60,C250-72,5230,S280,IQ 6,IQ 6+,IQ,IQ7,IQ 7A,IQ 7+,IQ 7X,Q Aggregator SolarEdge Products:P300,P320,P340,P370,P400,P405,P485,P505,P600,P700,P730,P800p,P800s,P850,P860 20 VERSION:2.0 REV DATE:07/16/2020 UL2703 CERTIFIED MODULES T SILFAB MODULES WITH 38 MM FRAMES SILFAB SYY-Z-XXXAB WHERE"YY"CAN BE IL,SA, LA,SG OR LG; "Z"CAN BE BLANK, M, P,OR X;"A" CAN BE BLANK,B, H, M, N;AND"B"CAN BE A,L,G_,OR T_ SOLARIA MODULES WITH 40 MM FRAMES SOLARIA POWERXT XXXY-ZZ WHERE"Y"CAN BE R OR C;AND"ZZ"CAN BE AC, BD, BX, BY, PD, PM, PM-AC, PX, PZ,WX OR WZ SOLARCITY SOLARCITY MODULES WITH 40 MM FRAMES (TESLA) SCXXXYY WHERE"YY"CAN BE BLANK, B1 OR B2 SOLARTECH MODULES WITH 42 MM FRAMES SOLARTECH STU-XXXYY WHERE"W"CAN BE PERC OR HJT_ SOLARWORLD SUNMODULE PLUS, PROTECT, BISUN,XL, BISUN XL, MAY BE j SOLARWORLD FOLLOWED BY MONO, POLY, DUO, BLACK, BK,OR CLEAR; MODULES WITH AG 31,33 OR 46 MM FRAMES SW-XXX SOLARWORLD SUNMODULE PLUS, PROTECT, BISUN,XL, BISUN XL, MAY BE SOLARWORLD FOLLOWED BY MONO, POLY, DUO, BLACK, BK,OR CLEAR; MODULES WITH AMERICAS 33 MM FRAMES SWA-XXX SONALI SONALI MODULES WITH 40 MM FRAMES SSXXX STION STION THIN FILM MODULES WITH 35 MM FRAMES STO-XXX OR STO-XXXA SUNEDISON MODULES WITH 35,40&50 MM FRAMES SE-YXXXZABCDE i SUNEDISON WHERE"Y"CAN BE B, F, H, P, R, OR Z;"Z"CAN BE 0 OR 4;"A"CAN BE B,C,D,E,H,I,J,K,L,M, OR N;"B"CAN BE B OR W;"C"CAN BE A OR C;"D"CAN BE 3,7,8,OR9;AND"E"CAN BE 0, 1 OR 27 VERSION2.0 RFV DATE 0711 F-2020 CLAMP TABLES End Clamps Frame Thickness Article Number 30mm 1510015 32 mm 1510016 35mm 1510017 38 mm 1510018 40 mm 1510019 45 mm 1510020 50mm 1610021 M1 Mid Clamps Frame Thickness Article Number 30-40 mm 1610011 40-50 mm 1510012 INSTALLER RESPONSIBILITIES Periodic reinspection of components shall be performed to verify that there is no corrosion detrimental to system strength and electrical conductivity,no loose bolts,and/or other variables that could compromise array safety.Any corroded or damaged components shall be immediately replaced. 30 VERSION:2.0 REV DATE:07/16/2020 .. \ . - ` GreenFastenTmGH PRODUCT GUIDE Exploded Product V ew/y S.G. - ] Installation Instructions - 2 \ . Cut Sheets - 3 Specifications - 4 Tem Data - 5 af f . 2}yam r �U -LcoFasten Solae GreenFasten- GF1 — Product Guide Exploded Product View, Bit( of Materials Materials Needed for Assembly Item No. Description of Material/Part Quantity } 1 GF-1 Flashing 1 4 2 L-102-3" Bracket*(other options available) 1 � t 3 5/16" EPDM Bonded 304-18.8 SS Washer 1 4 Lag Bolt 5/16" 1 r� 4' �R 2 Required Toots r �t v �.w�u � xl. • .r. y ° e } T 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 " EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 132 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 it GreenFasten*" GF1 — Product Guide Installation Instructions with Compression Bracket Of I F + poll, d F 2 3 4a 4b 4c 1. Locate the rafters and snap horizontal and vertical lines to mark the installation position for each GreenFasten flashing. 2. Drill a pilot hole(1/4'diameter)for the lag bolt. Backfill with sealant. Eco Fasten Solar recommends an EPDM mastic. Fos ' 3. Insert the flashing so the top part is under the next row of shingles and pushed far _ enough up slope to prevent water infiltration through vertical joint in shingles. The leading edge of flashing must butt against upper row of nails to prevent turning when tourqued. See page 2.2 for vertical adjustment when leading edge of flashing hits nails in upper shingle courses. 400 4. Line up pilot hole with GreenFasten flashing hole. 4a Insert the lag bolt through the EPDM washer,the to compression p p component bracket (L-102-3, Rock—It SlideComp*, SCL-101-3*, Z-101*, Conduit Mount Bracket*)and the gasketed hole in the fl ashing and into the rafter. -412 Insert the lag bolt through the EPDM washer,the Comp Mount Slide compression 5 bracket and the gasketed hole in the flashing and into the rafter. 4c Insert the lag bolt through the SS washer,the third-party bracket,the EPDM bonded washer,the CP-SQ-Slotted compression bracket and the gasketed hole in the Consult an engineer or go to www.ecofastensolar.com for flashing and into the rafter. engineering data. 5. Torque:The range is between 100-140 torque inch-pounds depending on the type of wood and time of year.The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to install the fasteners be careful not to over torque the fastener.You may need to stop and use a ratchet to finish the install. *not pictured. = WE 77-859-3947 EcoFasten SolarOAll content protected under copyright.All rights reserved.8/27/14 coFasten Solar products are protected by the following U.S.Patents:8,151,522 132 8,153,700 B2 8,181,398 132 8,1667713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 2.1 ff GreenFasten- GF1 — Product Guide Installation Instructions ' * Use For vertical adjustment when leading edge of Flashing hits nails in upper shingle courses .Slide flashing up under shingles until leading edge 2. Remove flashing and cut"V"notch at marks where nail engages nails. Measure remaining distance to ad- shafts engaged leading edge of flashing the distance desired just upslope. to shingle in Step 1. Notch depth not to exceed 2"length by 112"width. Placement of"V"notch XX Z„ Iq 3. Reinstall flashing with notched area upslope. 4. Position notched leading edge underneath nail heads as shown. s � 'ails beneath shingle Nails beneath shingle j` a z 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 2.2 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 's f GreenFasten" GF1 — Product Guide Cut Sheets: GF1 f i t k s .f t --------- ------ --------�_ _ A o a 3 I {kt � SECTION A-A t a - Mj = s 877-859-3947 EcoFasten SolarO All content protected under copyright.All rights reserved.8/27/14 3.1 x %+ EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181.398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 52 AV GreenFasten- GF1 — Product Guide Cut Sheets: GF1- 812 " O 8 4X R8„ — — 1/32"± 08. Z1Z11— 16 VJP\ A 5/64 5 „ 16 DETAIL A ~* 4" SCALE: 2:1 Finish Options BLK= Matte Black MLL= Mill Finish 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.8/27/14 _ 3.2 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181.398 62 8,166,713 B2 8,146,299 62 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 r � GrINelnrjGFI -PrBdttiEofideCut Sheets: Bracket Options - CP-SQ-Slotted44 4 t e � t w k3� 1.50 .06—� .50 1 t ti 38 L 4 x 2.00 t 1.00 a VJ- 01 v 1.00 0 0.38+.00 Z 0.50 0 0.88±.01 X 821 2.00 r. ri .: x� % 1 aY `moo 7 — 877-859-3947 EcoFasten Solar,All content protected under copyright.All rights reserved.8/27/14 3.3 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 82 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 82 8,225,557 B2 I GreenFasten`°' GH — Product Guide Cut Sheets: Bracket Options- F-111-A O 4, 2/6„ r ON 10 0 Y"THRU ALL 0 X 820, NEAR SIDE N jq s 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved 8/27/14 3.4 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 62 8,181,398 B2 8,166.713 B2 8.146,299 B2 8,209,914 B2 8,245,454 132 8,272,174 62 8,225,557 B2 GreenFasten- GF1 - Product Guide Cut Sheets: Bracket Options- SCL-101-3" 3/8'' O I 46 SERRATIONS 0 r AV wt co s 1 7/3" R1/161' 1/4" 00 3/4.. � 1/16" 7 R.Q05 8.010 2X R.Q1 f 60.00° 3/8"' .002 1/8, \� 0 7/3" X 820 DETAIL A SCALE 3:1 877-859-3947 EcoFasten Solaro All content protected under copyright.All rights reserved.8/27/14 3.5 EcoFasten Solar products are protected by the following U.S.Patents 8,151,522 B2 8,153.700 B2 8,181,398 B2 8166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 82 8,272,174 B2 8,225,557 B2 GreenFasten- GF1 - Product Guide Gut Sheets: Bracket Options- L-102-3" 2X 3/8" A 46 SERRATIONS N L V �r a 1 X N �-� - 1 7/8' 15!16" R1/16" 3/4" 1 7/8" 1/4„ 001/16" R.005-71 8.010 2 X R.01 60.00° \ 0 3/8.,-.002 1/8 0 .875±.010 X 82' DETAIL A SCALE 3 : 1 877-859-3947 EcoFasten Solarl�All content protected under copyright.All rights reserved.8/27/14^ 3.6 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 62 8,225,557 B2 GreenFasten- GF1 - Product Guide Cutsheets: Bracket Options- Camp Slide O Y 4� .33in 23in 8.26mm] 5.94mm] ! .52in x 13.08mm] t gk SLOT FOR 5/16'' HHCS E--a 1 .06in [26.92mm] 1 .00in [25.40mm] 0 0.377±.006 THRU 4.00in �s 0 0.875±.010 X 820 101 .6Qmm] W' 877-859-3947 EcoFasten SolaNAll content protected under copyright.All rights reserved.8/27/14 3.7 EcoFasten Solar products are protected by the following U.S.Patents:8.151,522 B2 8,153,700 B2 8,181,398 B2 8.166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 GreenFasten- GH - Product Guide Cut Sheets: Bracket Options - L-1 02-6" 13/32" o A + + + coU-) co co — .�- 7/16" - R.01 3" -- -� � 2.' J 5/16"' 1 i/2" 45.00° + 90.00C, R.01 R.01 0 3/8"+.00 THRU ALL DETAIL A 0 7/8"(±.O1)X 82°, NEAR SIDE SCALE 2 : 1 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8127/14 3.8 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 62 8,181,398 82 8,166.713 132 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 62 8,225,557 B2 GreenFasten- GF1 - Product Guide Cut Sheets: Bracket Options-Z-101 3/8" /16„ 3/16 4X R 1/8" 2 3/4" 5/16" l 1/2" 0 3/8"+_002 THRU ALL 0 7/8"±.010 X82-, NEAR SIDE 1 1/2" 3/4" 3/4" 877-859-3947 EcoFasten Solar�All content protected under copyright.All rights reserved.8/27/14 3.9 EcoFasten Solar products are protected by the following U.S.Patents:8.151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 B2 8,146,299 62 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 GreenFasten"' GF1 - Product Guide Specifications PART 1 -GENERAL 1.3 SUBMITTAL C. Base flashing is.032 gauge aluminum em- A. Submit manufacturer's written specifications. bossed to accept EPDM bushing. 1.1 SUMMARY B. Submit standard product cut sheets. A. WORK INCLUDES D. Bushing is EPDM. 1. GreenFasten solar attachment bracket that C. Submit installation instructions. E. Stainless steel bonded washer is 304 18.8 attaches directly to the roof deck. D. Submit product specific load test data,show- stainless and EPDM. 2. Provide appropriate bracket and fasteners ing ultimate and allowable load values. for the roof system. 1.4 QUALITY ASSURANCE 2.3 FINISH-Mitt Finish B. RELATED SECTIONS Installer to be experienced in the installation of A. Bracket is mill finish aluminum 1.Section 07600: Flashing and Sheet Metal specified roofing material for no less than 5ears 2.Section 07500:Roofin y B. Base flashing(choose one) g in the area of the project. 3. Division 1:Administrative and Procedural 1. Mill Finish ve AftRequirements 1.S DELIVERY/STORAGE/HANDLING 2. Black-kynar painted 4. Division 7:Thermal and Moisture Protection Inspect material upon delivery.Notify manufacturer 1.2 SYSTEM DESCRIPTION within 24 hours of any missing or defective items. PART 3 -EXECUTION A. COMPONENTS: Keep material dry,covered,and off the ground until installed. 1. GreenFasten GF1 system consists of alumi- 3.1 EXAMINATION num flashing with integral EPDM bushing A. Substrate: Inspect structure on which brack- FAN and one bonded stainless steel and EPDM PART 2-PRODUCTS ets are to be installed and verify that it will washer. 2.1 MANUFACTURER withstand any additional loading that may be 2. Fasteners Fasten Solar® incurred. Eco A.To be of metal compatible with aluminum 289 EcoFasten Street,Morrisville,VT 05661 GreenFasten components. B. Notify General Contractor of any deficiencies B. Fasteners should be selected for compat- (877)859-3947 before installing EcoFasten Solar brackets. ibility with the roof deck. www.ecofastensolar.com C.Fastener strength should exceed or be C. Verify that roofing material has been installed equal 2.2 MATERIALS correctly prior to installing solar attachment to that of the allowable load of the sys- A. Attachment Bracket brackets. tem. 6000 Series Aluminum(choose one) See test data at www.ecofastensolar.com 1. Comp Mount Slide 3.2 INSTALLATION 3. Sealant(if required by roof manufacturer): 2. CP-SQ-Slotted A. Comply with architectural drawings and proj- to be roof manufacturer approved. 3. F-111-A ect engineers recommendations for location 4. Aluminum compression bracket 4. L-102-3" of system.Comply with Manufacturer's written 5. L-102-6" installation instructions for installation and B. DESIGN REQUIREMENTS: 6. SCL-101-3" layout. 1. Bracket spacing to be recommended by 7. Z-101 project engineer. 8. Conduit Mount Bracket 2. Install a minimum of one fastener per B. Fasteners(may be supplied by others)to be assembly. compatible with chosen roof application and 3. It is important to design new structures meet specified pull out values as shown in or assess existing structures to make sure load test data. that they can withstand retained loads. 4 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.8/27/14 4. EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 62 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 r f i GreenFasten" GF1 — Product Guide Test Data: American Wood Council Lag Bolt Pull-Out Values 1 tt.t� t Lag pull-out(withdrawal) capacities(lbs) in typical roof lumber(ASD) Spe- Lag screw specifications o cific _ 5/16"shaft* g. Grav- Fz per inch thread depth r. ity Douglas Fir, Larch .50 266 Douglas Fir, South 46 235 Engelmann Spruce, lodge pole .46 t ' 2 Pine(MSR 1650 f& higher) 35 Hem, Fir, Redwood(closerain .43 g 212 Hem, Fir(North) .46 235 Thread - k Southern Pine 55 307 Depth Spruce, Pine, Fir .42 205 Spruce, Pine, Fir50 266 (E of 2 million PSI and higher z grades of MSR and MEL) 4 . 71 j 4 A A 877-859-3947 EcoFasten Solar�All content protected under copyright.All rights reserved.8/27/14 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8.181.398 B2 8,166,713 82 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 S 1 GreenFasten'"' GF1 — Product Guide Test Data: GreenFasten Leak Test r Wood Mocking Leak Test EcoFasten Solar 1 tested the GreenFasten roof mount system so you can be sure your roof penetrations won't leak, even when under standing water. Our test apparatus encapsulates the entire bracket and seals against the flashing which allows us to flood the bracket and pressurize the system. After the apparatus is flooded it's pressurized to 30psi and left to stand for over10 minutes.This is equivalent to nearly 70ft of standing water. � y , _ � a e s t� T "3 4 4 Okg° �,+" N-�Ul g"': 877-859-3947 EcoFasten Solar'�All content protected under copyright.All rights reserved.8/27/14 °+ EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8.153.700 B2 8,181,398 B2 8,166,713 B2 8,146.299 B2 8,209,914 62 8,245,454 B2 8,272,174 B2 8,225,557 B2 5.2 ,v GreenFasten- GF1 — Product Guide Test Data: GreenFasten Leak Test .p Wood Blocking Leak Test(continued) If there were a leak,an oversized hole in the roof deck and notch in the rafter would allow unrestricted flow to two paper towels that are stuffed around the fastener.To make it clear if there was a leak,the water is dyed green. " Neither of the paper towels show any indication of leaking.The z GreenFasten system is 100%water tight. �y s lAff " s' M y V z',' �t ,F AIE,77 {' XY t < 877-859-3947 EcoFasten Solar'�All content protected under copyright.All rights reserved.8/27/14 5.3 o ' EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153.700 B2 8,181,398 B2 8,166,713 B2 8,146,299 82 8,209,914 62 8,245,454 B2 8,272,174 B2 8,225,557 B2 GreenFasten- GF1 — Product Guide Test Data: IAPM0 Certification No. 0216 uE$ EVALUATION REPORT _ 216 Originally Issued: 04 W2011 Revised; 04113f2DIS Valid Through: 04130(2017 r VA L1'ATI o\ .l It.I F:(1: pre-uand Fl alletDA1 prommct(GF-It.me-hole bracket(L. ('kFFNFAS1f*N-1-1t12.Fl..�SIIF(JnTA*%D 101-3Xskkxtcdhr�kctISCL-If)!-3)ortwtholcbrac►n R ('[)111'St.IDF. 00F NIM',I .S.SENtBtIL% (1.-t0'_-3);anEP6Atbonledl4.RWushrrs.and a'ltainch 17.9 mm)diameter lap wrcw.The published uniallauon REPORT'1101-DER: UkWOctimts provRie more detailed dtmeatio al EcoFasten Sober' information. 239 Harrel street MwTisytlle.1'cnnont JIMA1 3.1.2 FhmbFom Rauf Mower:the Flashtnor RoofMoam (MA)766-4273 has five basic cornpcxtcros:aluminum hashing with a Ixt inistalled FPDM umt met tcu.I),a 2-11,Ynch dmnxtrr((A r= mail slur inch thick r79 mm)support dist::an EPI)M ADDITIONAL(C(11�1F Kt' \1l4gES: bonded MR w ashet.and a sir.inch dianxtcr lap screw.The Irea idar let. published installation utsuixtions pro3ide nw-re detalled 14"7AjAyrAvenue dimetuimrl infxniatton lls3ty 1 941-44(800122127-"9523 � ' of lf3.1.3 t' Slide Roaunt: TIr CompSlide Roof w.w.v,jr9artdtrt.taflf 41oum has six[Rase componals:aluminum dashing%vtih pro-,rb;fadlcd I PDM gnm rto((!F-I);a 4 inch 1102 mmr CSI DMISION.-f16-WOOD AND PIASTICS lotto CotripSlide cast:an EPD11 bonded 18.11 washcrs}/,,, CSI Seetior: 06 25 23-Wand.Plastk,and Composite inch(7.4 mini 4 deamews lag scfc%%;one-holo bracket 4L- Fastenings 101-3);sola Ir,Rich dmntetcr x WI.inch kmg(7.9 x 32 nim)t irx Head Cap Snit ash matchtiW serratcd flanpc nut 1.0 SCOPE OF EVALI ATIOS The pAtIrched installation instructions provide mrrc dciaded dimensional infixmation. 1.1 Coaaptirtrce ro the following codes A regatstlost: . 2009 International Btslding Calc'(IBC) 3.1.4.Abominate Flashing:the aluminum flashmp are 2009Inte13t31300m1 Restdcatud Cok'tIRCi rttade from attndued alum)num eamphtng with ASTk1 . `006International Btaldtng Coka(IBC) B`Oo. Table`of this upon tau F'lashtIMs that are used • '006 international Rtsidenual Cake(IRC i x4,11,each montane assembly. . 1947 Uniform Buildtng Cir& 11."80-Anached Supplement 3.3 Hattriah 1.2 Esalrated in accordance wits: The(decotasten-t-41',FlashFoot and Cons Roof • IAPSfO ES Evaluatton Crneria Fix Joist Hanpcm %foum cemp,xicins rttatertat standards are specified to and Mijecllancrnts C'atnecmrs,1FC002-2016). table:of this tepoct. 13 Properties assts.edc I asstenen used Insecure the flashina to the roof ranee shall • er ies assral he /,.-tach-diameter r7.9 mm)129 screws complying with ANSIIASAtE. BIRy-1-B1. The sat wfcw shall he long • NaterPenctration emxO to peretratc the rifler a mtn,mcan of_tf_usch" 164 nim).lag sacus shall he eormsear,-reststare.Tabic I 2.0 PRODUCT iISE of ills mpmt includes pull-out capacities for typical roof Lvrofastcit Saiar's and IrnnRiilgc's CmcttFasaen-l-Sf?, lusher. flashVeAm and CampSlidc Roof°Mounts are mounting 4.11 DF W.N AND Ll'STAL1-tT1ON assamblres used to attach solar parvis and other type,of e4mpnxm it,the ratters of rnafs Nth asphalt shingle toof 4.1 Dr.lgn:C'omplianec to the foffowmg shall be pro•dal coverings,n 3eu1rd3rlCe NlthTBC Section 1504 and IRC tit the Designcr(Lngtnver if requested h}the lurm1etitm Sections R40;and tk12302. hating aeahmtty-The tabulated allowable loads showx in - tills rel"ut are t6sed on allowable stress dtmgn(ASD)and 3.11 PROM t T DF�f'kH'!110\ uklude the load duratton ficloiXthoorresportdttta wah the 3.1 applicable bails,n accordance with SIDS. i'rnd ort ininnna hon 3.1.1 i.rreata,ten-i-6I2: Me CrnxnFastcml-812 Roof Whetr the roof numm are cxpowd to tempAcrattaex strum has titer bome components:aluminum 0ashmg with exceeding Io0'F(37.M'L uplift alkAvable made shall be ad3usW by the temperature fiLlM C,in accordance Nith .. - rr.ab..ara.oer Ya w.uwwewawaevw n,EAMe•erne.ww.rurverrr..w.m+'M�.wwr.anr ar a+a+x,vne.a.•e..aro.v c-.t.,.+.��� re MatlYtM wvw.b+Ne•aaV.yn.YeHb•yet antl byetle.•er.Yae eMre•aerbtlh,ti svaefP,.rrf'assyrii aM1rTayu.a rYnh-s:w+NCr ay,MY. . �yelaM,n ymil.v al,1.-^tea Mi Y!. ���t' aJamalpt aiJlLrenpy,±aa.�a..arilb.LLMgeL n.m•CPT,dne•U,M AMs.k)w,sl H..u.k.��ar Pt•\A:1a'nc aanem ralYit.•CA ••.YYY�nafauM4CnM4 aare,m..steessnw4neµsaVmnV'YsuYRmanams.w0.wlnaworA^i+ •wa:itiu.eM. !v:P05.�'-.�L:•.enR'wnr.uxMr,.yan4'a15.`AAP1tlaY0•r 9Tw4 U.aR GMdM,P'fli.ib•P_{ASt ..... 877-859-3947 EcoFasten Solaro All content protected under copyright.All rights reserved.8/27/14 5.4 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 s GreenFasten GF1 — Product Guide Test Data: IAPMO Certification No. 0216 UEsEVALUATION REPORT Y 216 Number: Originally Issued: 0411512011 Revised- 0411312016 Valid Through: 04/30(2017 Section 10 1.4 oftheNDS. When prodwtsare attached ict faucnets tesed with the specific propttclar) prescnatesa- *ood framing hawing a motsnac content greatet than 19 treated or lirc-tctardant trcaW lumber. Percent 116 percent Me erlgincered wood pmductsk or Q x "acre well service is tXpected,the aflowtible loads shall be 5.4 l"wll required h%the code official,a licensed design adjusted Ill,the win strvter tactor,CM,speeifi:d in Section prtNcssicmal shall prot:.k cakuiwtons to verify that 103.3 of the NDS,Connected wood memlxrs shall he rrnf sed loads on the as-ietnhly do rxsi exceed the allowable analyzed for lost-cam'tm capaerry at the canriectirn to kxeds oittained in Iable I ufthisrcfxm. accordance with the)tiDS. 5.5 When required to the code official,a licensed design 41 Isstallatlon: llx tinv:nFastro-1,Al?,flashFotx and pmofesstotIal shall ptrnnie calculattom for the asscmtdr ("mp4hdc Roof Mounts shall be installed an the rafter stgwn h-aming. using tine lag screw at each hracl:ct location as des ribed III the puhltsltcd installation mnttrtteuoni Ilk,minintan 6.051 Sti7AN-fil%]'I%(;DATA specific ezraan) of the skilod tnembef shall he 47.42.lht flaxilin2 shall he placard utiletncach the shmttck far rawgh Testing and atlalysrs data stl+mocd is in rswafonnatsrr w nh t r up slope to prcVI:M Hater enfdtatton. Installatmn of IAP41tl 1:1-, f.ealuatnxl Criteria for Joist Hangers and tircenFastera l•Al2, FlashTtwn and Cornp5lidr Run( Atmcellancots Cimmectom tFC002-W6t. Rauf test dura ' Mounts arc ItlnItcJ to toofs having, mtnimutn and n an t:unforrrwuc 'AA the Urxj rWnters I.atxxaAry rnaximum slopes of 3:12 114 per"nl) and 12:12 tot 51311,vd for Cas Vents,!UL 441-1*Section 25k Tem penronm.rnpecusrly. rewire we from 3atvxatxmrs to corrgdrancc with ISC?/IEC F 702>. CompShdc Ra f *rte has shall be installed with a t maximum spacing of 1-14fte Inches(44.2 rami center-w} ?.!i kDE\Tlf lt'1 T10\ i .. renkc between brmlict Hex Head Cap Bolts and the 1 screw fastener. Iles Head Cap Boles shall h tet5wiled a Feolasten Solar's aril ifonRkhI :s, Grcenhiste»-1-112, minimum of 1-Ir",inch 127 milt tut-center hon,the end of ISS+hFout and C'ompSltde Roof younts are htctnohetil with r� the C'ompSltdeunit, a latul bcarme the manufacturers name ant atslmss, �J prtvluct dost-gnatwn. I.APNfO tlnifwm I:S \treks of When the cnthosscd prnfle on the sheet slashing hits the Ccnsfiunun this ecalta tion upon nuenher tfR-216k shenelc on the codasz alxtve, the irtstalkr shall add cuntpl ctnec irN1r,amu(mnspetiuo+n a¢cticy. approe ed eadditne to the undetsrde of the shtrteles tin the course above. 5.0 1ANI T'ATIONS The GrecnFasun-1-812,Tlashluut and CompSlyde Roof ��r Mounts described to this report courphr with the caves 1101M In Soclt bt 1.0 of t IS repos,subject to the follnwictTM ,. conditruts: IARKI ER 0216 a� S.I The GrcrnFasecr►1-312, Flashfool :end Compslldc Roof Mounts shall be installed in aceordanee wxh thts , :port the munufaeturtes published installation Brigs Gtrbrr.P E_SX enctruc[tona,cocks listed to Seeneir 1.1 Of this rcpnn and 3'ice!'revident Technicalf)ptratiuss thrsupplcmrnt 1 mitt,rm E%aIn*hon Service z e * 5,2 Calculations showing compliance with this rcpcut sisal I he submmked to the rode official.'rhe raleulations chill he ' s+ Cam �. Prepared b} a registered dtsign profess:nal where P: rccturd by the a sttus othe he itmsdtcbrin to whnh he Rich"BrtM.PL CSf1,NCP i ,' 'ice Prtsideal.t tfferiar EvaMntletr Sen ice r+ v project is to he constructed. 5.3 Fastcm(S used ut contarO with fire-retardant-treated or " "` " ^'`� pnw en-save-trcazrd Itattl+er shall comply with[BC 5cetion G'Rmr Cka.e(r 2304.4.3 or the 2000 IRC Svitiat 8317.3 0006 IRC CEO.The IAPNO Group Section R319.3),ma heaMr,The t M clxrt holder or lumhcrid 't• r at` treater shall be contacted rax reeontmencianotns e,n ai .r s.ar mommum corrasion resistance and connection capacities of 877-859-3947 EcoFasten Sonat All content protected under copyright.All rights reserved.8/27/14 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522132 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 5.5 GreenFasten- GF1 — Product Guide Test Data: (APMO Certification No. 0216 EgEVALUATION REPORT 216 0691rxally Issued: 04115!2011 Flinlood: 04113MIS Vafid Through: 0-4130(2017 ram.I .kth—Mc Laad Load Bracket' SlrcriRr t.ra+u� FI>t.hinW Ulrrrliaa ntl.nmhrr t:rrrrltaslrn-l-ti12 t6.hF'avt Baird as tested 1 It(malr= I.-Irl-3 11.52 741 V64 1,1114p,.12 4;; 717 l SCL-101-1 0.47 604 717 Comp,Slidc 0,4_ 6158 VA L-101-3 1).;2 les v?� L-102-3 u.4_" 3(4 Lateral SCL-101-3 0.47 273 compsl.& 0.42 1 2_11 Vr1 Baird as Load at U8"Delkttlem a L-101-3 032 129: NA 1 pblt 1-[02 3 0,42 _1cr, 414 WL-101-3 0.47 192 414 co Stide 0 42 98 W:1 1-4063 052 320 V?i -3 0.42 291 h SC1-101-3 0A7 401 Iny C.or>rSllar 0.42 113 01 ur M:I I6.tarrt 4.448 4,1 auh-25.4 mm. 1 itra[kirtx arc ia.»n m f!aures 2,5 Md 8 e,(rj_retxtrl At '_.l.apcxt rare aiK4ed xanrplrx d++titl�d h+Fxtfu.ol:oti9�_ , 3.:teera�kud W 1r>1rd+crmlilcx a1 Il%.azit iiclka"ar. �. Page 3 of 8 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.8/27/14 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 132 8,146,299 62 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 5.6 J. GreenFasten- GF1 — Product Guide Test Data: IAPMQ Certification No. 0216 BEVALUATION REPORT 216 OrWnally lasuod- 4411S12A17 Revised. 0411&(2016 Valid Through. 0413012017 Tame 2: V-rnrbt}%lndeh,I'd In'tallation @ \1adeUaxteatbh Flashi s ' Brarkrus nmantt hardware Fastraer Greters-Aes.8t2 Flat A-% 12"IGH:XXX- One-halebrackctiL-101-1I;or 37le-dtamctcrlagst7, 812f1tF'1-XXX-812-1-': Slotted bracket tSCL-101-3Y or C,f1-k\X-8l2-Peak, Tuo-Ita1ebracket(1.-1022-3) GFt-XX-X-8l2-ARC&; CI Gr 1-XXX-812-ktdges•,or (iF t-XXX-812-1.i tum-6.0 F 641'eal Rolf Fartned 12" x 12- ,uhth 2.5'drarratcr x 3116"thick support 5116-diata;ct lag scrcu %least' ratud orculm Lvater dolt and Otte-hale bracket(1.-101- 3) i nmpSlidr Raaf Flat t£-%12'; 4-long t-umpSlkle mounting unn 5/16'"drarncter lag screw; %least GF I\XX-812.11; orad: and 5116"'diatncter x 1- C:rI_XXX-812-Petdr, Cknc-holelim-ketf1--lol-31;er 114" long h,.%-bead cap GFI-X..XX-BL-ARCty Slaved bracket lSCL-101-3x or felt with mawtun_g GFI-XXX-X12-Rb4e;ar Two-badclraekerlL-103-31 serratedflansenut GF I Vth-'-;112-Lirtea G.O ro AIc eta hap mtcs came with mr 1YU111 Mndmt 124 tarantmt materaed in the eeran a Meiradr+an I l'U%t 7natdeS 18.N wasfier "n"w ah anrrnred seaEmt tmekr the cxtkaed tab oratph it rhfn m Tame 3.%sarrrial Properties Hex Lag sorra' ANSUASItfr B1S 11-81 Sec table 12 t1SM fne putt out Figure I -cZklXICttIcs for t% teal roof lumber ADS Aluminum M dflat-kii-1 FAA-S-6061 ypAuna Fr urc EPD?N Metal K-01 c 304 stateless sriet crpl%ittg w9th AS'1Tf A 240 F'igurc 3 camber) EPDM Grommuct ASTM%?412,13247.02240•and A STM D624,with a Fipurc 4 dur~tr af6o Flashtne ASTM 8-209 Figure 4 Plat, Sttygron Ficus 3 Plate cnm Sled.• :AA6f6061 ,tearer n • a, 7- 71,1, q4' uz Y f a � 1 AR", a Page 4 oia t ; 877-859-3947 EcoFasten Solar"9All content protected under copyright.All rights reserved.8/27/14 v EcoFasten Solar products are protected by the following U.S.Patents:8.151,522 B2 8,153,700 B2 8,181.398 B2 8,166,713 B2 8.146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 5.7 .7 s rM f GreenFasten- GF1 - Product Guide T �. est Data: fAPMO Certification No. 0216 EVALUATION REPORT NUmber:r 4 " Originally feswd: 04/MM1 Revhad: 04H9l201i Valid Thro"h: W3012017 1 � Load Orlon illowDirectlon DOta11 s up ft Lateral # z T-E M C0f#72Wf Qj4rC*W ?f BuNdWq l"Imn wAft E Futon Solar~ � q f f� ^' '' 4-1 611K 877-859-3947 EcoFasten Solar�All content protected under copyright.All rights reserved.8/27/14 5 8 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8.153,700 B2 8,181,398 B2 8,166,713 B2 8.146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 0 GreenFasten" GF1 — Product Guide Test Data: (APMO Certif=ication No. 0216 U -EVALUATION REPORT Number: 216 Ee ' EVALUATION REPORT Number- Originally Issued: 041111112011 Revised: 04MY2016 Valid Through: 0413012017 OriginaNy Msuod_ 04/15120/1 Revised. 041312010 VaNd Through- 0413012017 EcoFasten Solar Components Figure 1: Figure 2:L-102.3 Figure 7:FlashFoot Flashing Figure 8:Aluminum Support Plate Lag Strew Figure 3: - Figure A: EPDM GreenFast Metal en-1-812 roof Flashing bushing with Figure 9:CompSlide Roof Mount Assembly EPDM in 4 Figure S.L-101.3 Flom 9:WL-101-3 tvA Pale&of 8 Pap 7 of 8 877-859-3947 EcoFasten Solar�All content protected under copyright.All rights reserved.8/27/14 Ah EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 82 8,181,398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 5.9 .' GreenFasten'" GF1 — Product Guide �f Test Data: 1APM0 Certification No. 0216 EVALUATION .Or ' REPORT 2t6 Orwaaylaallad:1kWg12N1 tiwrlaad:04n3 016 VONTt7rrollgll:ONJg/2o1T Number, Rpm 1a FbshhW .M : Dig Valid Through- 0413 012 01 7 UBC SUPPLEMENT `'- EVALUATMN SUBJECT: GREENFASTEN-1412,FLASHFOpT AND COMPSLBIE ROOF Ii1OUN ASSEMELIE4 REPORT HOLDER: F"Faa4a some 2"Rami 31uee1 '- ^• :- � � Maeri+riRe,Ver�ID:ifil Calls Pbr:!N-9ff-J2?1 ADDff ZONAL COMPANN NAMES: GFt-7(XX 812•LINES IroaRidge lac. GF1-XXX-612-RIDGESI.ephyr Aveaae 114ywarJ.CA 943" (!100)227-9123 wztwiruaridee.rnm CS1 DIVISION:at--1\("M AND Pl_A4ICS CSI Stedq: OF 2t 2}—Hood.1Massia and �� 1`' (oaipnsNe FaatttYaas I A EVALk'AT70\SCOPE LI CnnPW as wft r4 bNowia!cedts �' • 1997 Uniform Budding Code tL.tBC7 2.0 FINDM S The (ncrnfm,-gen l4l_, fled OW and Campdidr Rnof %)mint.A992mNws 1LsavttW in 1APM0 I FS Evalution Rr7nxt I"R-:I tr comply u nh[hr codes listed n Secum 1.1 of GFI-XXX-612-ARCS GFt-XXX4124PEAK thes s pplcmcnt.Um,d_gn,OW it WWmn didj be to areordenee wah ER-215. 34 WNST.ANTIATING DATA Tenige mW analyse am snhmnfed u in confvniance wt* t'.,.*•• lAP%fo ES Erahta a n Cciama fa foist Haagen a W AlifcrRanenttt C(wd*""s.1EC002-201 I7. Rain amdam is in oc06xm—c With ttv lfnderwritm Lahor ,a0r),Standard 441-96 Seco' 157,TrA restdftsare Rom Iat:o,a i --(r.(omld:«nce wnh IM MEC 1711'-5. rr danrV Marw(n�W nii Ma,arMwrru�,ir GG1wM4l112-y e.,rY.•a�w��elui�l Yfe����..- Pap a of e Page 2 of 2 877-859-3947 EcoFasten Solar19All content protected under copyright.All rights reserved.8/27/14 T ---- EcoFasten Solar products are protected by the following U.S.Patents:8.151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 62 8,272.174 B2 8,225,557 B2 5.10 12.1.2016 Data Sheet Enphase Microinverters Region:AMERICAS Enphase The high-powered smart grid-ready Q7 a n d I Q 7+ Enphase IQ 7 Micro'"' and Enphase IQ 7+ Micro'" dramatically simplify the installation process while Microinverters achieving the highest system efficiency. Part of the Enphase IQ System,the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ Envoy'", Enphase IQ Battery'", and the Enphase Enlighten" monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to provide an industry-leading warranty of up to 25 years. Easy to Install Lightweight and simple I II IIID Faster installation with improved,lighter two-wire cabling Built-in rapid shutdown compliant(NEC 2014&2017) Productive and Reliable Optimized for high powered 60-cell/120 half-cell and 72- cell/144 half-cell*modules More than a million hours of testing Class II double-insulated enclosure UL listed Smart Grid Ready Complies with advanced grid support,voltage and frequency ride-through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) *The IQ 7+Micro is required to support 72-cell/144 half-cell modules. To learn more about Enphase offerings,visit enphase.com 8 E N P H AS E Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA(DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' 235 W-350 W+ _.. . --. . .. ,,N..w�..._.., 235_.._W_-440_. _W+,_ .'...._"'... '"-`...,'-"."`.., Module compatibility 60-cell/120 half-cell PV modules 60-cell/120 half-cell and 72- only cell/144 half-cell PV modules Maximum input DC voltage 48 V 60V Peak power tracking voltage 27V-37V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15A 15A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak output power 250 VA __F9 5 295 VA p-~- Maximum continuous output power 240 VA 290 VA Nominal(L-L)voltage/rangez 240 V/ 208 V/ 240 V/ 208V/ 211-264 V 183-229 V 211-264 V 183-229 V Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A(L-L.)branch circuit, 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III Ill AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor(adjustable) 0.85 leading...0.85 lagging 0.85 leading 9...0.85 lagging @240 V @208 V @240 V @208 V Peaeffciency97.6% 97.6%__ _ 97..6.._i, 9-7._o/,0 _.. _--. _97..3. CEC weighted efficiency .0% 97.0% 97.0°i 97.0% 97.0 MECHANICAL DATA Ambient temperature range -40°C to+65°C Relative humidity range 4°i to 100°i(condensing) Connector type MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Dimensions(HxWxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 lbs) Cooling Natural convection-No fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor FEATURES Communication. ""`_'"""""_�..._----�•-------_• Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors,when installed according manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at httos//enohase cOmZen-uslaupi2ort/-Qdule-cg[npatibilily. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphase.com /z-'I 2020 Enphase Energy.All rights reserved.Enphase,the Enphase logo,Enphase IQ 7,Enphase IQ 7+,Enphase IQ Battery, ."Of E N P H A S E Enphase Enlighten,Enphase IQ Envoy,and other trademarks or service names are the trademarks of Enphase Energy,Inc.Data subject to change.2020-08-12