Permit Support Document (4) 1111 CITY OF TIGARD ELECTRICAL PERMIT
COMMUNITY DEVELOPMENT Permit#: ELC2022-00333
•
T t G A R j� 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 ,r
/J Date Issued: 5/24/2022
Parcel: 1 S 126CC00200
1 Jurisdiction: Tigard
Site address: 10069 SW CASCADE AVE
Project: Tesla Subdivision: None Lot: None
Project Description: Install(2)Circuits for(2)illuminated wall signs S103&S201. 8/3/22 REPIRNT to ccorrect address.
Contractor: RAMSAY SIGNS INC Owner: 10065 SWC LLC
9160 SE 74TH AVE BY ALSTON & BIRD LLP
PORTLAND, OR 97206 BANK OF AMERICA PLAZA
101 SOUTH TRYON ST STE 4000
CHARLOTTE, NC 28280
PHONE: 503-777-4555 PHONE:
FAX: 503-777-0220
FEES
Quantity Description Date Amount
2 ea Sign or Outline Lighting 05/24/2022 $135.68
Specifics: 1 ea 12%State Surcharge- 05/24/2022 $16.28
Electrical
Type of Use: COM
Class of Work: NEW
Type of Const:
Occupancy Grp:
Total $151.96
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the
180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 throuoh OAR 952-001-0090. You
}may obtain a coov of the rules or direct auestions to OUNC by callina 503.2 .1987 or 1.800.332.2344. -
Issued By: St Z t �x���G!` Permittee Signature: Z T / 4W/
OWNER INSTALLATION ONLY
The installation is being made on property I own which is not intended for sale,lease or rent.
OWNER'S SIGNATURE: Date:
CONTRACTOR INSTALLATION ONLY
SIGNATURE OF SUPR.ELEC'N Date:
LICENSE NO.
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.