Report (2) CT ENGINEERING N C 180 Nickerson St. I9--NICA Suite 302 I pl O o �� � Seattle,WA 98109 (206)285-4512(V) 11T[ 9\09- �ar (206)285-0618(F) Iasolomon@ctengmeering.com BULLETIN Date: June 20, 2022 Number: CT-02 Project#: 21078 Project Name: South River Terrace Attached: CT-02.1 Subject: Cantilever Retaining Wall Drawings Affected: Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the 'South River Terrace' project located in Tigard, Oregon. See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required as shown. FtUCTUR44 05) PRCF I` C 9 !Ai\ 4.1 ti ON i Fi0 0\1 F 12, oR� 06/20/2022 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: June 20, 2022 Distribution: Contact Information: Dennis Gaudreault Taylor Morrison Frank Sandoval Taylor Morrison Sam Scott Taylor Morrison Amy Russell Taylor Morrison Elizabeth Erlandson Milbrandt Architects N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc Structural Engineers CT-02 BULLETIN CT-02.1 CR /3 AT 24'O.C. —III—!:tZf.fic 1=1I !==_1. (2)g AT TO.W. FREE-ORANNG BACNFLL RE:GEOIECH .. 7)\\_.. PERT.BARS PETi 2.CLR, a..• SCHEDULE(LAP 111H / DO ) 6 • /4AT1CO.C.HO. o x p CANTILEVER RETAINING WALL SCHEDULE WILL HEIGHT HEEL TEE B/3 OEPTH DOSES TORT.BARS THIOOIESS i E . Cr ID 2-0' 0'-4' 0'-4' 1'-4' 8' /4 0 18' /4 0 18. 8' g e TO MATCH 2'-I'TO 4•-0' 0'-6' 0'-6' 1'-8' II' 14 0 le p 018' 8' FOOTING BARS TO MATCH 4'-1'TO 6"-0' i'-10' 0'-6' 3'-0' 10' +4 0 12' µ 0 12' 8' REINING WALL FOOTING /..i_- / VERT.BARS 6'-I'TO 8.-0' 3'-2' 0'-6' 4'-4' 12' g 0 10' g 0 10' 8' PER SC}EJIAE = lieiN•,I_I,I 8"-I'TO 10'-0' 4'-r 0'-6' 5'-9' lY (0 8' N5 0 0 8' ET510'-1'10 17-0' S'-10' O'-6' 7-0' 14' (0 5' N5 0 5' 8' 'I_I 7,10 1_1 1 FOIIOARON GRAN 0-i�0V f..g.• /l/ BY OTHERS _ .• >< .a •a •II p 0 12'LCNOIUONAL HEEL 8' TOE / / / / BASE / / CANTILEVER RETAINING WALL Bend Office (541) 330-9155 Geotechnical Office (503) 601-8250 Carlson Testing, ugene Office (541) 345-0289 Inc.Inc• Salem Office (503) 589-1252 Tigard Office (503) 684-3460 Daily Report of Proprietary Anchors Client: POLYGON WLH LLC - SCOTT NELSON Project: SOUTH RIVER TERRACE - LOT 18 (LOT 55) CTI Job#: T2103986.D Address: 16804 SW LEAF LN TIGARD Jurisdiction: TIGARD CTI representative A. IDZARDI WABO SI 01951/AWS 12041141/ICC 8210349 was on site this date Jul. 21, 2022 to perform Special Inspection for: Permit MST2022-00029 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. Name: ROB OBSERVED THE INSTALLATION OF #3 REBAR DOWELS Company: TAYLOR 24" OC PER BULLETIN #CT-03 7/16/22 FOR A CHANGE IN SLAB ON GRADE ELEVATION IN AREA FRONT OF 2. Inspection was "IBC" Continuous x Periodic GARAGE. PROPRIETARY ANCHORS YesNoN/A 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? x Verified following items meet manufacturer's published installation instructions. REPORT SUMMARY 3. Verified minimum embedment depth of the anchors. x 1. Work inspected was: x Completed In progress 4.Verified installation of the anchors. x 2. Completed work inspected was in compliance with 5. Verified anchor diameter. x I I Approved plans and specifications I I Shop drawings 6. Verified steel grade. x n n RFI x Design change I I Submittal n N/A 7. Verified hole diameter. 8. Verified type of drill bit used. x Document #(s) SEE TEXT Dated: 07-16-2022 9. Verified hole cleaning method. x 3. Noncompliance item(s) were noted this date, details on 10. Verified adhesive application. x following page(s). Yes [1 No I x J N/A 11. Verified edge distance. x 12. Verified s acin 4. Noncompliance item(s) were reinspected this date, details p g x on following page(s). Yes n No x N/A 13. Verified installation torque. x Conform Remain in progress Evaluation report number & date: ESR-2508;07/2016 Report(s) findings were discussed and left with ROB of TAYLOR Name of product being installed SIMPSON SET-XP Batch Number 1000261839 Expiration Date 2024-05-03 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of 2 Daily Report of Proprietary Anchors For: 07/21/2022 CTI Job #: T2103986.D Project: SOUTH RIVER TERRACE - LOT 18 (LOT 55) Notes: { t1 In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only.Information contained herein is not to be reproduced,except in full, without prior authorization from this office.Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter,please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING,INC. Keith Gauvin Reviewed By: Steven W Leach Project Manager Review Date:07/21/2022 AI/AI CC: POLYGON WLH LLC - SCOTT NELSON SNELSON@TAYLORMORRISON.COM • CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT FINAL/NCL ONLY POLYGON NORTHWEST (TAYLOR MORRISON) - ROB KOEHN RKOEHN@TAYLORMORRISON.COM 8430 SW HUNZIKER ST,TIGARD OR-PO BOX 230997,TIGARD OR 97281 Page 2 of 2