HomeMy WebLinkAboutPermit Ill CITY OF TIGARD MECHANICAL PERMIT
COMMUNITY DEVELOPMENT Pe
COMMUNITY MEC2022-00718
Date Issued: 8/8/2022
T I G A A D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S104CA06900
Jurisdiction: Tigard
Site address: 13430 SW HILLSHIRE DR
Project: Young Subdivision: HILLSHIRE Lot: 69
Project Description: Replacing A/C.
Contractor: DUNAMIS HEATING AND AIR Owner: YOUNG FAMILY TRUST
PO BOX 20493 BY YOUNG, BRADLEY R& REBECCA L TRS
KEIZER, OR 97307 13430 SW HILLSHIRE DR
TIGARD, OR 97223
PHONE: 503-409-5363 PHONE:
FAX:
FEES
Specifics: Description Date Amount
Air Conditioning 08/08/2022 $46.75
Type of Use: SF 12%State Surcharge-Mechanical 08/08/2022 $10.80
Class of Work: ALT Type of Const: Minimum Fee Adjustment-Mechanical 08/08/2022 $43.25
Occupancy Grp:
Stories:
Fuel
Fuel Types:
Gas Pressure:
Tota I $100.80
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
Issued By: Permittee Signature: g.--C_ _ e-.7,/// .a7")‘-Z---
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Applicati FOR OFFICE USE ONLY
Cityof Ti and E I Y\'E Received
i 5 g Date/By: Mia ll( 7 If—
"I
1312 SW Hall Blvd.,Tigard,OR 97223 Plan Review
Phone: 503.718.2439 Fax: 503.598.1960 AUG 8 2022 Other Permit:
Inspection Line: 503.639.4175 Date/By:
I I C,A R D t P_, Date Ready/By: Juris: H See Page 2 for
Internet: www.tigard-or.gov CITY OFIIGAHU Notified/Method: Supplemental Information
Rim NNG DIVIq.!ON,
YPE OF WORK COMMERCIAL FEE* SCHEDULE - USE CHECKLIST
/ Mechanical permit fees*are based on the value of the work
❑New construction L% Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
❑Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit.
Value:$
CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
CJ 1-and 2-family dwelling ❑Commercial/industrial 0 Accessory building For special information use checklist.
❑Multi-family 0 Master builder ❑Other: Description Qty. Ea. Total
JOB SITE INFORMATION AND LOCATION Heating/cooling:
Air conditioning I 46.75
Job site address: '311)�3® S. . 1 o tGh ,I re D Furnace 100,000 BTU(ducts/vents) 46.75
City/State/ZIP: NAC ( c-) co-2 -3 Furnace 100,000+BTU(ducts/vents) 54.91
A vp►e v_e_1'( e�efl k Heat pump 61.06
Suite/bldg./apt.no.: Project name: Duct work 23.3232
Cross street/directions to job site: (Al�' e r ► es +-r, "ref f. Hydronic hot water system 23.32
J� Residential boiler(radiator or
hydronic) 23.32
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Flue/vent for any of above 23.32
Subdivision: Lot no.:
Other: 23.32
Other fuel appliances:
Tax map/parcel no.: Water heater 23.32
DESCRIPTION OF WORK Gas fireplace/insert 33.39
Flue vent for water heater or gas
Isse,FNA 0001k Ck e VlkSkiV40 , 1 ,��1` (AOA `(„i(`. llI nU fireplace 23.32
O -1 � R<< l d C tO VI tAtl ciA Skeielek
LA.)C k J Log lighte (gas) 23.32
Ma Wood/pelletk.
stove 33.39
i 1MO -( C rt (N\40 fn C CA\ Wood fireplace/insert 23.32
Chimney/liner/flue/vent 23.32
Other: 23.32
PROPERTY OWNER 0 TENANT
Environmental exhaust and ventilation:
Name: -"G ra a (lo o . Range hood/other kitchen
Address: 3 q SJ 14,,i $h"r C hr equipm 33.39
a ✓ Clothes dryer exhaust 33.39
City/State/ZIP:-1-i Qy�',(d f 0 rp01r y� cf 7 2-2.3 Single-duct exhaust(bathrooms,
. " `�J`� toilet compartments,utility rooms) 23.32
Phone:(S Q3) r/.- /S 3 Fax:( ) Attic/crawlspace fans 23.32
APPLICANT ❑ CONTACT PERSON Other: 23.32
Fuel piping:
Business name: DrAina 1.c 4e 4,L l I�3 cold Air $14.15 for first four;$4.03 for each additional
Contact name: NA,(00A Nat-41.914 L Furnace,etc.
Address: '�D )( SON Gas heat pump
�d �/`�!�^30 Wall/suspended/unit heater
TQ
City/State/ZIP: tie( r cye o l 7 Water heater
Phone:(503)go I— 5 3 Fax:�:( ) Fireplace
Range
E-mail:Duna fn;S.2C l f dt rici /N(f 1eo4t C bn Barbecue
CONTRACTOR Clothes dryer(gas)
Other:
Business name: t) at S 6-ea-IA VI__ etAlf MECHANICAL PERMIT FEES*
Address:% ,.)x � `I`q-3
Subtotal
City/State/ IP: V tie rt o te,3�^ q'730 7 Minimum permit fee($90.00)
A LL)��� Plan review(25%of permit fee)
Phone:(93) yOq— S36,3 Fax:( )
State surcharge(12%of permit fee) _
CCB lic.: 22 6 WO TOTAL PERMIT FEE
�r This permit application expires if a permit is not obtained within 180
days after it has been accepted as complete.
Authorized signature: * Fee methodology set by Tri-County Building Industry Service Board
Print name: M I SUe (Ail UYI 4 'Z Date: 0/8/ZZ
I:\Building\Permits\MEC_P rmermitApp_040113.doc 440-46I7T(1 I/02/COM/WEB)
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial & Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
I:\Building\Permits\MEC_PermitApp_040113.doc 2
16-6 0? Su-) S''t(e_ 4-VC_
•
�/ S1-2o2 a- 00bn "CROSSING AT BULL MOUNTAIN"
LOT 23
HUB AND TACK CERTIFICATION
SE 1/4 SEC. 8, T 2 S, R 1 W, W.M.
CITY OF TIGARD, WASHINGTON COUNTY, OREGON
SURVEYED JULY 15, 2022
*(1\ S v iLAY Nri _ Q--.S PREPARED FOR:
PACIFIC LIFESTYLE HOMES
.-ra il 11815 NE 99TH ST., SUITE 1200 VANCOUVER, WA. 98682
o'IT �Wv
3b 3 _ - - - -TRACT G -
i6.00' PUBLIC
UTILITY
EASEMENT
LOT
24
cn
i� a
z TRACT F 1'
C / N 89'55'53"E 128.26' �14 a
/
N 37'04 50 E 59.47'--___ _�
b
19.44 I o
A. I in
N
—�- -�14.00'
.^3`f)'('D LOT I o
Q 23 0
cn
0( pc I
cN I I o
= 100.77' ----a. J con
3 S89'55'53"W 169.64' f �20•62, 1
a 01
o
4 0
o LOT
REGISTE: I 22
v PROFES• •► +L
= LAND SUR, OR
2VP
LOT
0
� 20
Q OREGON
LY 9, 2002
AVIS C. JANSEN LOT
57751 1 210
RENEWS: 6/30/2023
°' I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
2 SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 30 0 15 30
° I HAVE ACCURATELY SURVEYED AND STAKED THE
0
_� FOUNDATION FOR LOT 23 OF "CROSSING AT BULL MOUNTAIN". 1 INCH = 30 FEET
S
0
DRAWN BY: MJL DATE:08/01/22 PACIFIC COMMUNITY DESIGN
REVIEWED BY: T2 DATE:08/01/22
Z 106-001 PLANNING ENGINEERING SURVEYING
PROJECT NO.: (503) 941-9484
8/2/22,7:01 AM Mail-Andy Basford-Outlook
Fwd: Home survey
Luke Parker <LukeP@BuildPLH.com>
Mon 8/1/2022 6:51 PM
To:Andy Basford <AndyB@buildplh.com>
Qj 4 attachments(198 KB)
106001.RTC Lot 23.2022-08-01.pdf;image001 jpg;image001.jpg;image001 jpg;
See attached. Tigard should be familiar with these guys.
Luke Parker
Pacific Lifestyle Homes, Inc.
Construction Manager
360-772-1184
Begin forwarded message:
From: Travis Griffin <travis.griffin@pacific-community.com>
Date: August 1, 2022 at 6:40:06 PM PDT
To: Luke Parker <LukeP@buildplh.com>
Subject: RE: Home survey
Hi Luke,
Attached is an unsigned certification for Lot 23,you can let the inspector know that it will be signed
once our surveyor returns from vacation on Wednesday. We have completed about 700 of these
certifications in Tigard so hopefully he lets you pour concrete.
Good luck!!
Travis Griffin
Survey Crew Manager
12564 SW Main Street Tigard, OR 97223
Mobile: 971.235.0012
From: Luke Parker<LukeP@BuildPLH.com>
Sent: Friday,July 29, 2022 5:19 PM
To:Travis Griffin <travis.griffin@pacific-community.com>
Subject: RE: Home survey
Yea unfortunately they don't tell us its required until the inspection. We wanted to pour today.
As soon as you can. We have it called in for Monday if you can get it to me in the morning that
would be great.
Sorry for the rush on it.
https://outlook.office.com/mail/inbox/id/AAQkADMoY2UwMzE2LWU5MTQtNDRkYi1 hYTA2LTU5Yzg4ZjM5MGU4ZAAQAMGDhMDSROoEokaSxFoge8... 1/4
8/2/22,7:01 AM Mail-Andy Basford-Outlook
Luke Parker
Construction Manager-PLH
Pacific Lifestyle Homes
[www.PacificLifestyleHomes.comjwww.PacificLifestyleHomes.com
Direct 360.213.0836
"Our mission is to deliver an exceptional new home experience"
From:Travis Griffin<travis.griffinPpacific-community.com>
Sent: Friday,July 29, 2022 5:17 PM
To: Luke Parker<LukePjBuildPLH.com>
Subject: Re: Home survey
Hi Luke,
When are you planning on pouring concrete? Our stamping surveyor is on vacation until Tuesday but
I can get someone else to certify if you need it before then, let me know.
Thanks,
Travis Griffin
971-235-0012
On Jul 29, 2022, at 4:39 PM, Luke Parker<LukePPbuildplh.com>wrote:
Hi Travis,
We will need the certification for the River Terrace house the inspector wants it for the
foundation inspection.
Can you send that to me as soon as possible?
Thanks,
Luke Parker
Construction Manager-PLH
Pacific Lifestyle Homes
[www.PacificLifestyleHomes.com]www.PacificLifestyleHomes.com
Direct 360.213.0836
"Our mission is to deliver an exceptional new home experience"
From:Travis Griffin <travis.griffinPpacific-community.com>
Sent:Thursday,July 14, 2022 9:15 AM
To: Luke Parker<LukePPBuildPLH.com>
Subject: RE: Home survey
Sounds great. We have not yet set the monuments for this subdivision so any homes
that str=art until then will need to be surveyed.
Do you have other sites that need survey services?We are competitive, efficient, and
responsive; and our survey services are available even if our design team is not
https://outlook.office.com/mail/inbox/id/AAQkADM0Y2UwMzE2LWU5MTQtNDRkYi1 hYTA2LTU5Yzg4ZjM5MGU4ZAAQAMGDhMDSROoEokaSxFoge8... 2/4
8/2%22,7:01 AM Mail-Andy Basford-Outlook
involved. I look forward to working with you on this project and hopefully more.
Travis Griffin, LSIT
Survey Crew Manager
12564 SW Main Street Tigard, OR 97223
Mobile: 971.235.0012
From: Luke Parker<LukePPBuildPLH.com>
Sent:Thursday,July 14, 2022 8:23 AM
To:Travis Griffin <travis.griffin@pacific-community.com>
Subject: RE: Home survey
Perfect that is good and fee is acceptable.We survey on the sloped lots and most of
them are. Flat ones we just pull off property lines.
We will be in touch!
Thanks,
Luke Parker
Construction Manager- PLH
Pacific Lifestyle Homes
[www.PacificLifestyleHomes.com]www.PacificLifestyleHomes.com
Direct 360.213.0836
"Our mission is to deliver an exceptional new home experience"
From:Travis Griffin <travis.griffinPpacific-community.com>
Sent:Thursday,July 14, 2022 7:57 AM
To: Luke Parker<LukeP_PBuildPLH.com>
Subject: RE: Home survey
HI Luke,
We can complete this potentially on Friday.The fee for hub and tack offset staking is
$320/Lot. If the inspector requires a certification since there are no monuments in the
ground,the fee is$120/Lot for a Hub and Tack Certification signed by a licensed
surveyor.
I can move forward with he request if you reply to this email acknowledging the listed
fee.
Thanks for reaching out, I would like to provide services for all the homes acquired for
Pacific Lifestyle Homes for this site, is that something you are interested in?
Travis Griffin, LSIT
Survey Crew Manager
12564 SW Main Street Tigard, OR 97223
Mobile: 971.235.0012
https://outlook.office.com/mail/inbox/id/AAQkADM0Y2UwMzE2LWU5MTQtNDRkYi1 hYTA2LTU5Yzg4ZjM5MGU4ZAAQAMGDhMDSROoEokaSxFoge8... 3/4
8/2/22,7:01 AM Mail-Andy Basford-Outlook
From: Luke Parker<LukePPBuildPLH.com>
Sent:Thursday,July 14, 2022 7:39 AM
To:Travis Griffin <travis.griffin( pacific-community.com>
Subject: Home survey
Hello Travis,
Ryan Styger sent me your info to stake out a lot in the River Terrace subdivision we are
starting.
I have attached the Cad and plot plan.Typically we do 5' offsets to have room to dig
and set up the foundation.
Let me know if you can do this and if so when you are available.We are ready anytime.
Thanks,
Luke Parker
Construction Manager-PLH
Pacific Lifestyle Homes
[www.PacificLifestyleHomes.com]www.PacificLifestyleHomes.com
Direct 360.213.0836
"Our mission is to deliver an exceptional new home experience"
https://outlook.office.com/mail/inbox/id/AAQkADMDY2UwMzE2LWU5MTQtNDRkYi1 hYTA2LTU5Yzg4ZjM5MGU4ZAAQAMGDhMDSROoEokaSxFoge8... 4/4
( s �� Dot
IzAI I
GEOPACtFCIC
trr• 4)9 ______ , L___
Real-World Geotechnical Solutions
1 Investigation • Design • Construction Support
July 11, 2022
Project No. 16-4108
Stonebridge Job No. 3241
Attention: Andy Thomas
Stonebridge Homes NW LLC
4230 SW Galewood St., Ste. 100
Lake Oswego, OR 97035
Fax 503-387-7615
Email Andv(a�stonebridgehomesnw.com; JimD(a�stonebridgehomesnw.com;
kristen(�dmhholdingsco.com
iT 2pa2
FOUNDATION SUBGRADE REVIEW I
LOT 69 RIVER TERRACE CROSSING ow rl k
15594 S.W. PEACE AVENUE
ii WASHINGTON COUNTY, OREGON
GeoPacific Engineering Inc. visited the site last week to review the single-family home foundation
subgrade at the above address. We understand that the proposed building is a two-story home. In
our opinion, the observed subgrade is adequate for support to an allowable bearing pressure of
1,500 psf.
1
At the time of our site visit, the excavation was complete and soils exposed in foundation excavation
consisted of predominantly stiff native soils that could be probed about 6 to 18 inches with moderate
pressure using a steel "T" bar probe. The expected maximum anticipated total and differential
footing movements (generally from soil expansion and/or settlement) are 1 inch and 3/4 inch,
respectively, over a span of 20 feet. The lot is gently sloped to the south side. Footing-to-wall and
footing-to-slope setbacks were not an issue.
it Due to relatively impervious silty and clayey soils encountered throughout the site, all foundations
should incorporate appropriate drainage measures in accordance with the International Residential
Code. Adequate crawlspace drainage is not something that geotechnical consultants can verify; the
purpose of our visit is for observations of foundation bearing conditions only.
Our work scope pertains to a geotechnical engineer's foundation excavation review only and the
conditions existing and exposed at the time of our site visit. Within the limitations of scope, schedule
i and budget, GeoPacific attempted to execute these services in accordance with generally accepted
professional principles and practices in the fields of geotechnical engineering and engineering
geology at the time the report was prepared. No warranty, express or implied, is made. If you have
any questions, please call.
503
14835 SW 72na Avenue Tel( ) 598-8445
Portland,Oregon 97224 Fax(503) 941-9281
i
GEOPACIFIC
Job No. 16-4108
Lot 69 River Terrace Crossing
Sincerely,
GeoPacific Engineering, Inc.
PROFcc_
11-1,7
14743PE i •
OREGON
'ilk 23,‘49°
✓9
MES D lMl6a
EXPIRES:06/30/20 23
James D. imbrie, G.E.
Geotechnical Engineer
, g-qc c,et
FOUNDATION CERTIFICATION
LOT 69 OF "CROSSING AT 'PULL vOUNTAIN",
CITY OF TIGARD, WASHINGTON COU \ TY, OREGON
PREPARED FOR /5 4 S ''' Pec, ` "_'A`�
STONE BRIDGE HOMES NW, LLC i `S•=2.Ci 22_ Q vCU rI I
4230 GALEWOOD ST., SUITE 100
LAKE OSWEGO, OR 97035 LOT
68 '
W
N89'55'53"E 93.39'
Z
I---5.0' S.0'--I W
M b 30.33' 40.7 Q
Z o ',� _
W
> 20.0' o O
Q N LIC)
0 2.00' S r
U LCO
Q N 16.67' �1.00' w v)
LU o [3.00' LOT6 o
0- Q 6.00' - o
0 0 \- o
U) z co
0�-3.00' 0 1.00'
37.0'
i-i
49.00'
- 20.0 24.0'
25.0' 1--5.0 5.0
66.0'UE S89'55'53"W 93.34' --� 8.0'
PUE
LOT '
70
N
�`
PUE PUBLIC UTILITY EASEMENT VIP
SCALE: 1"= 20 FEET
ii
07/20/2022 MI
REGISTERED ‘ 20 0 4 10 20
PROFESSIONAL
LAND SURVEYOR I, ROBERT D. RET11G, A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE
OF OREGON, HEREBY CERTIFY THAT I HAVE STAKED THE FOUNDATION FOR LOT 69
7 -7?AY
�i /7 OF "CROSSING AT BULL MOUNTAIN" WITH HUBS AND TACKS ON JULY 18, 2022.
OREGON CROSSING AT BULL MOUNTAIN LOT
JANUARY 11, 2005 69
ROBERT D. RETTIG
60124LS AKS ENGINEERING & FORESTRY, LLC oRwN: AMW
RENEWS: 12/31/22 12965 SW HERMAN RD, STE 100 AK CH►c0: CRC
TUALATIN, OR 97062 AKS Joe:
P:503.563.6151 F:503.563.6152 aks-eng.com 9531
DWG:9531CS1X I LOT 69 FC