BULLETIN
Date: June 20,2022 Number: CT-02 Project#: 21078
Project Name: South River Terrace Attached: CT-02.1
Subject: Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
'South River Terrace' project located in Tigard, Oregon.
See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with
Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required
as shown.
cp PROF
,`F.1�GINF �
0 9
i� GON
1
4/ • 12, ti���`�
F RO
06/20/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: June 20, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins\21078_2022.06.20_CT02_Cantilever Retaining Wall.doc
Structural Engineers
CT-02 BULLETIN CT-02.1
CONC. S.O.G.
/ /3 AT 24'O-C.
\0
A a V
e 01
- _ •�
... .• j-
• er-
I I 1-1 11 -.-ei. (2) 15 AT T.O.W.
a
FREE-DRAINING /
BACKFILL a
RE: GEOTECH
'.a
VERT. BARS PER
2" CLR. '4 SCHEDULE (LAP WITH =
/ a DOWELS) II
x
4 #4 AT 10" O.C. HOR.
w
x
d
4a
CANTILEVER BETA NING WALL SCHEDULE
WALL HEIGHT HEEL TOE BASE DEPTH DOWELS VERT. BARS THICKNESS
cd r
0' TO 2'-0" 0'-4' 0'-4" 1'-4" 8" #4 0 18' #4 0 18" 8"
ce
A DOWEL BARS TO MATCH 2'-1" TO 4'-0' 0'-6" 0'-6" V-s" 10"
LiJ VERT. BARS #4 0 18" #4 0 18" B'
4'-1' TO 6'-0" 1'-10' 0'-6" 3'-0' 10" #4 0 12' /4 0 12" 8-
CD FOOTING BARS TO MATCH
RETAINING WALL FOOTING / VERT. BARS s' 1' TO 8'-0" 3'-2' o'-s" a'-a' 12' 0 10" /5 0 10" 8"
PER SCHEDULE W -f. rr:Lr:.jr1'
J �,I�,I�.I�I�,I�.I' I - 0'-6' S'-9" 12" #5 8' #5 ®8' 8"
N
I�.I4I�.I�,IZ.IZ.I
•r•r•-•-•r•Y.- 10'-1' TO 12'-0" 5'-10' 0'-6" T-0' 14" #5 05' 15 05" 8'
-i 'iT.iT.i�i.-*TTeT-i-
FOUNDATION DRAIN 10 �*Tec �%I �'
-r•r•r_•-•r:•ram et...BY OTHERS * = A...- = = = : °
a
a a 1 I r
e ° ° _ a l—III
Lu
E-1
4 a O O •
d c a ��
°. II--1 11-1 I d e a — \
11-11-, ,1 I I =I
#5 0 12" LONGITUDINAL
HEEL 8" TOE
/ / 1' /
BASE
/ /
CANTILEVER RETAINING WALL