Loading...
Permit _._..__ CITY OF TIGARD BUILDING PERMIT `'1 COMMUNITY DEVELOPMENT Permit#: BUP2022-00180 Date Issued: 8/8/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S126DC00901 Jurisdiction: Tigard Site address: 9650 SW GREENBURG RD Project: Terrace Glen Apartments-West Building Subdivision: TERRACE GLEN APARTMENTS Lot: None Project Description: 80.96 KW roof mounted solar photovoltaic system. Contractor: IMAGINE ENERGY LLC Owner: GETHSEMANE EVANGELICAL 5506 SE INTERNATIONAL WAY LUTHERAN CHURCH MILWAUKIE, OR 97222 9640 SW GREENBURG RD PORTLAND, OR 97223 PHONE: 503-477-9585 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: OTR Type of Const: VB Permit Fee-Additions,Alterations, 08/08/2022 $1,299.23 Occupancy Grp: R-2 Occupancy Load: 0 Demolition 12/o State Surcharge-Building 08/08/2022 $155.91 Dwelling Units: Plan Review 07/14/2022 $844.50 Stories: Height: ft Info Process/Archiving-Sm$0.50(up to 08/08/2022 $6.00 Bedrooms: Bathrooms: 11x17) Value: $132,000 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $2,305.64 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 95 -001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: � Permittee Signature: . /` b„ ` Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. .. a m '+ Building Permit Application Commercial FOIi Orrl(.I: l ,1:O.l.l E�� Received � �( City of TigardR I I„„ ,,,1/� ,l/ DateBy: C����VL sp 11 � LL �� C ^ 1h1ne S50 Hall Bl-2439 Tigard, x: OR03 97223 JUG. 13 2022 Plan Review 7.� - Zit. 9-/`� Phone: 503-718-2439 Fax: 503-598-1960 DateBy: {� Inspection Line: 503-639-4175 CITY�/ C TIGARD .te Ready/By: / r lu<�: H See Page 2'for TIGARD p V�I 1 ®r i�"��� �� B Internet: www.tigard-or.gov .�- Norified/M>..o��T / ? Supplemental Information TYPE OF WORK 'EQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling 0Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:!96®6-2W GREENBURG RD. New dwelling area: square feet City/State/ZIP:TIGARD, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name:TERRACE GLEN L1{,5 Covered porch area: square feet Cross street/directions to job site: EAST OF SW 92ND AVE Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the qIt DESCRIPTION OF WORK work indicated on this application. 1y4.KW SOLAR PHOTOVOLTAIC SYSTEM,ROOF MOUNTED.THIS PROJECT ENTAILS THE INSTALLATION Valuation: $ OQ /32,Qtie 00 OF SOLAR PHOTOVOLTAIC(PV)MODULES, GRID-INTERACTIVE INVERTERAND ASSOCIATED EQUIPMENT Existing building area: square feet TO SUPPLY POWER DIRECTLY TO THE EXISTING ELECTRICAL DISTRIBUTION SYSTEM OF THE BUILDING. New building area: square feet ® PROPERTY OWNER 0 TENANT Number of stories: Name:TERRACE GLENN HOUSING PARTNERS,LP-(Contact)Kent Usher Type of construction: Address:208 SW FIRST AVE. Occupancy groups: City/State/ZIP:PORTLAND OR.97204 Existing: Phone:( )503-222-4375 Fax:( ) New: ® APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:IMAGINE ENERGY LLC Structural plan review fee(or deposit): Contact name:MARY LAUGHLIN FLS plan review fee(if applicable): Address:5506 SE INTERNATIONAL WAY Total fees due upon application: City/State/ZIP:MILWAUKIE OR 97222 Amount received: Phone:( )971-207-2494 Fax::( ) E-mail:M.LAUGHLIN@IMAGINEENERGY.NET PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:IMAGINE ENERGY LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:5506 SE INTERNATIONAL WAY Solar Installation Specialty Code checklist. City/State/ZIP:MILWAUKIE OR 97222 Permit fee(includes plan review $180.00 and administrative fees): Phone:( )503-477-9585 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.:167963 Total fee due upon application: $201.60 Authorized signature: /_LZ J e., This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Mary Laughlin Date:7/13/2022 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(l 1/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2]of Valuation Computation): $ I:\Building\Permits\BUP_COM_PennitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1111 " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. * map&tax lot# [U project name ❑Q site address ❑ suite number ❑Q zoning Q applicant name ❑■ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval,the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Pere its\BUP_COM_PermitApp.doc Rev.03/05/2019 °F�•: Prescriptive Solar Photovoltaic Installation Checklist 2019 Oregon Structural Specialty Code (OSSC) * 5" '' Compliance Use this checklist to demonstrate compliance with the prescriptive photovoltaic(PV)requirements d Sei tlrp 6 3111.3.5.3 and 3111.3.4.8 of the Oregon Structural Specialty Code(OSSC). Separate electrical p are.r'equired for the installations. iTur I lUtk ii.i 11, f'NG DIVISIO PART I—PROPERTY OWNER INFORMATION Property owner name:Contact - KENT USHER Phone number:503-222-4375 Installation address:9660-SW GREENBURG RD. T C fro/ &IAA _ 5 /. City:TIGARD *50State: Oregon I ZIP:97223 Structure on which modules are to be installed:Apartment complex Installer: 0 Contractor ❑ Owner(If owner, skip to Part III) PART II—CONTRACTOR INFORMATION Contractor name:Imagine Energy LLC Phone number:971-207-2494 Email address:m.laughlin@imagineengergy.net BCD business license#:C 1174 Contractor's CCB#: 167963 PART III—STRUCTURAL CRITERIA Roof structure requirements If"No"is selected for any item below, or if the supporting structure is a manufactured dwelling, the project may not be submitted using the prescriptive path. Check the appropriate boxes for each item as it applies to the project. • Structure is classified Risk Category I or II in accordance with OSSC 1604.5: 0 Y• es ❑ N• o • Structure is of conventional light frame construction: ® Yes ❑ N• o • Supporting roof framing is one of the following: ❑■ Y• es ❑ No (check one) El Pre-engineered trusses spaced_<24 inches o.c.;or ❑ Rafters spaced<_24 inches o.c.and spans comply with OSSC 2308.7.2 or ORSC R802.5,respectively • Ground snow load does not exceed maximum load: El Yes ❑ No (check one) El <50 psf for structures under the ORSC,or ❑ <70 psf for structures under the OSSC • The basic design wind speed does not exceed the following: El Yes ❑ No (check one) ❑ <_120 mph in Wind Exposure Category C for structures under the OSSC;or Q <135 mph in Wind Exposure Category B for structures under the OSSC;or El <135 mph in Wind Exposure Category C for structures under the ORSC • Roofing materials are metal,single-layer wood shingle or shake,or not more than two layers of composition shingle: 0 Yes ❑ No • Module height is less than 18 inches from the top of the module to the roof surface and complies with Figures 3111.3.5.3(1)and 3111.3.5.3(2): 0 Yes El No BCD I OCodes unding Manion Published by Building Codes Division—Aug. 18, 2021 Depsnmant of Consumer and Business Fannon PART III—STRUCTURAL CRITERIA(continued) Loading requirements Check the appropriate boxes for each item associated with the selected attachment method. El Attachment 1: PV modules or racking is attached directly to the roof framing or blocking: • Combined weight of PV modules and racking is not more than 4.5 psf: 0 Yes ❑ No • Spacing of PV modules or racking complies with one of the following: 0 Yes El No (check one) <_48 inches in any direction;or ❑ <24 inches in any direction where the following are true: • Ground snow load is more than 36 psf • Panels are located within 3 feet of a roof edge,hip,eave,or ridge • Basic design wind speed is greater than 120 mph in Wind Exposure Category B • Basic design wind speed is greater than 110 mph in Wind Exposure Category C *If this is the appropriate attachment method and "No"is selected for any of the items above, the project may not be submitted using the prescriptive path. El Attachment 2: PV modules or racking is attached directly to standing seam metal panels: • Combined weight of PV modules and racking is not more than 4.5 psf: El Yes ❑ No • Clamps comply with the following requirements: • Provide the following,allowable uplift capacity: ❑■ Yes El No (check one) ❑ Not less than 115 pounds and spaced at 60 inches o.c.or less;or 0 Not less than 75 pounds and spaced at 48 inches o.c.or less. • Spacing between metal panel seams is not more than 24 inches ID Yes ❑ No • Spacing along a metal panel seam is not more than 60 inches Ii Yes ❑ No • Metal roofing panels comply with the following requirements: • Panel thickness is 26 gauge steel,minimum D Yes ❑ No • Panel width is 18 inches or less Q Yes ❑ No • Attached with at least#10 screws at 24 inches o.c. .0 Yes ❑ No • Installed over minimum '/2-inch nominal wood structural panels attached to framing with 8d nails at 6 inches o.c. at panel edges and 12 inches o.c.field nailing 0 Yes ❑ No *If this is the appropriate attachment method and "No"is selected for any of the items above, the project may not be submitted using the prescriptive path. PART IV—ROOF DESIGN SITE PLAN Roof design requirements • Attach a simple structural plan showing the roof framing(rafter size,type,and spacing)and PV system racking attachment. • System must be shown in sufficient detail to assess whether the requirements of Section 3111.3.5.3 have been met. • The structural plan must be on 8.5-inch x 11-inch or larger paper. PART V—PV MODULES Manufacturer:CANADIAN SOLAR Model number:CS3W-460MS Listing agency:Imagine Energy LLC [2] • PART VI —PATHWAYS AND CLEARANCES Pathway and clearance requirements • Using the grid below or an attached 8.5-inch x 11-inch or larger paper,provide a simple drawing,indicating the location of the PV system in relation to buildings,structures,property lines,and,as applicable,flood hazard areas. • The drawing must be shown in sufficient detail to assess whether the pathway requirements of Section 311 1.3.4.8 or one of the exceptions have been met. [3]