Loading...
Plans K 5��¢y,D ARe (ECEIVE - DANIEL YAMAMOTO RESIDENCE w BRAMSKE n MAY 1 2 2022 • PORTLAND,OR • 6769 PERMIT SET - 5/4/22 CITY OF TIGARL OF OR4G- 3UILDING DIVISION' Approved plans ac -hall be l,ob SHEET INDEX CO Q DOOR 1 HEADER CALCULATIONSn ` �{�tl E 5 , ARCHITECTURAL ROOF LOADS AO COVER,PLANS,SCHEDULES CO D 25 LB SNOW LOAD Al ELEVATIONS,DETAILS SW 15 LB DEAD LOAD .1./ CO 560 PLF i F 1 DOOR SCHEDULE SCOPE = I REPLACEMENT OF PATIO DOOR WITH I HEADER MARK! OPERATION I WIDTH I HEIGHT I HEADER LARGER PATIO DOOR AT REAR SIDE OF I 1'-1a 'r EXISTING SINGLE FAMILY DWELLING Vimisw.- R1 R2 D1 4-PANEL SLIDER 11'-10" 6'-8" 3.5"x 12"GLB;(3)JACKS EA SIDE AREA OF----; kriln I E 0 3,313 LB 3,313 LB WORK I Po,N OWNER 3 a HEADER:3.5•'x 12•'GLB;24F-V4 MATT YAMAMOTO SPAN 142" 11705 SW SUMMER CREST DRIVE MAX ALLOWABLE MOMENT:16,452 LB-FT WINDOW&DOOR GENERAL NOTES TIGARD,OR 97223 I MAX ACTUAL MOMENT 9,917 LB-FT-60%OF CAPACITY ARCHITECT • ALL WINDOWS&DOORS STOC COMPLY WITH MINIMUM ENERGY EFFICIENCY MAX ALLOWABLE SHEAR:7,343LBF REQUIREMENTS PER ORSC CHAPTER 11 BRAMSKE STUDIO ARCHITECTURE LLC - - - _ — - - - MAX ACTUAL SHEAR:LEC LBF-45%OF CAPACITY ; U-FACTOR MIN OF 0.40 12746 SE STARK STREET MAX ALLOWABLE DEFLECTION'L/360=0.39" ALL DOOR GLAZING TO BE TEMPERED PER ORS SEC R308 PORTLAND.OR 97236 MAX ACTUAL DEFLECTION:0.02"-OK CONTRACTOR TO VERIFY HARDWARE,OPERATION,FINISHES WITH OWNER DANIEL BRAMSKE.NCARB 503-724-2465 SITE PLAN JACK STUDS CID3 1 -20-0 DAN@BRAMSKE.COM (3)2x4 AT EACH SIDE=15.75 S.I.OF BEARING AREA 3,313 LB/15,75 S.I.=210 PSI<1,700 MAX PSI BEARING PARALLEL TO GRAIN CONTRACTOR VALIDITY OF PERMIT RENEWAL BY ANDERSEN OF PDX 18151 SW BOONES FERRY ROAD THE ISSUANCE OF A PERMIT PORTLAND,OR 97224 KENDAL DELCARPINE c') BASED ON CONSTRUCTION KENDALD@RBANW COM CV CV 541-400-9079 DOCUMENTS AND OTHER w a)F, F� DATA SHALL NOT PREVENT MEASURING TECH:YURIY KRISHTAL 0 CC O . THE CODE OFFICIAL FROM Z o •I REQUIRING THE CORRECTION L11 D- OF ERRORS.ORSC 105.4 < BUILDING CODE 0 CD �/ 10•-0•• �' 2021 ORSC 1D-a (I) ! SNOW LOAD 25 PSFWN ix D50 L.L II TEMP �r'� CO JAMB LOCATION TO REMOVED y BE MAINTAINED GENERAL NOTES 0 DOOR TO BE W OFFICE COPY 0o LOAD BEARING LOAD BEARING 1 BEFORE CONSTRUCTION IS TO BEGIN,THE I— C WALL LINE OF WALL LINE OF CONTRACTOR IS TO VERIFY THAT ALL Q 1--1ROOF ABOVE - r ROOF ABOVE REQUIRED APPROVALS&PERMITS HAVE BEEN OBTAINED.THE CONSTRUCTION OR Al 1 g 012 ro FABRICATION OF ANY BUILDING COMPONENT MAY BEGIN ONLY AFTER THE CONTRACTOR D T HAS RECEIVED PLANS&ANY ADDITIONAL Cr), a CZxI"Y OF' "IGAD DOCUMENTS FROM THE PERMITTING 8 OTHER Q REGULATORY AGENCY.IF THE CONTRACTOR EXISTING RESIDENCE EXISTING RESIDENCE FAILS TO DO SO,THE CONTRACTOR SHALL BE NOT ALL INTERIOR NOT ALL INTERIOR REVIEWED FOR ODE COMPLIANCE RESPONSIBLE FOR ANY RESULTING ELEMENTS SHOWN ELEMENTS SHOWN MODIFICATION OF WORK REQUIRED BY ANY / Lt, REGULATORY AGENCY. GI 0.Approved: [ �` " 2. IF DISCREPANCIES OR INCONSISTENCIES ARE OTC: [ l FOUND WITHIN THE DOCUMENTS,THEY SHALL BE REPORTED TO THE ARCHITECT 8 RESOLVED BY THE ARCHITECT PRIOR TO PROCEEDING A A / WITH WORK IN THE AFFECTED AREA Permit#: rnS 1 �ZZ -- O D (y �,„ PERMIT SET 3 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY IN THE FIELD ALL 5/4/22 III Address: 1 // \'�--�1/V \/DWI y�/� y�A/ / ♦Q / DIMENSIONS.ELEVATIONS,&EXISTING ` D JJJ �( - �+ D " •4•lL/ r'•-8 ( CONDITIONS PRIOR TO PROCEEDING WITH THE No. D . Q WORK,ORDERING OR FABRICATION OF ANY Suite {�{j{ • MATERIALS. IF DISCREPANCIES ARE FOUND 11': BETWEEN THE CONSTRUCTION DOCUMENTS 8 CO n� 'L."- REPORTED TO THE ARCHITECT 8 RESOLVED BY EXISTING CONDITIONS,THEY SHALL BE ��� - II' y �,'1I y By: A-A Date: Z 2.14.— THE ARCHITECT PRIOR TO PROCEEDING WITH (V ---21 I. 24. 0" WORK IN THE AFFECTED AREA. O i( �( / 4 DIMENSIONS ARE TO FACE OF STRUCTURAL OR Q OEXISTING FLOOR PLAN O PROPOSED FLOOR PLAN m FRAMING MEMBERS,u.TT 1/8"=1'-0" 1/8"=1'-0" J�T/1 5 WHERE IS CLEAR THAT A DRAWING N REPRESENTS ONE ITEM OF A NUMBER,OR COVER,PLANS. N ONLY A PART OF AN ASSEMBLY,THE OTHER WORK SHALL BE CONSTRUCTED REPETITIVELY. SCHEDULES Q 6. BUILDING PERMIT APPLICANT MAY ADD NOTES N AS REQUIRED BY THE BUILDING OFFICIAL TO OBTAIN A PERMIT,PROVIDED THE ARCHITECT OF RECORD IS NOTIFIED OF SUCH CHANGES. AO OD Aik, • 0,- DANIEL .... ,..-- Cs] BRAMSKE C) — -7- .3 • PORTLAND,OR • 4›, 6769 e' OF OS" aj it 0 0 E•_ CO D CO U) _----- __------- ...___ I-- _ -____. TOP PLAT — — _ - -- 1 M igl f_.. . . F (E)EXTERIOR T -,-.1 1 , Ji 11 WALL ASSEMBLY :"* II]WAI _ a WALL AND DOOR TO BE REMOVED_ AI 1:WM (N)GLB HEADER w•-.....grr., -...ir:" 1ST FLO01_ s M FLASHING- / I I UNDER WRB WO TRIM-MATCH(E) (--i- EXISTING WEST ELEVATION r.-,)SECTION AT GLB HEADER •1-1 1/4"=I-0" -"-' 1 1/2"=1-0" (,) CNI NOTE:LESS THAN 10%OF LENGTH OF WALL TO BE ALTERED-NO SIGNIFICANT CHANGE TO LATERAL CAPACITY OF WALL DNI N. II ry°3 0 OC - N WijTS(1 EM)PTS°P0 NPTLAT2EXRDA FT EVA IUD Z r? 3--- -1- LU m< IV x a r OLD 1021R 0 _---- / / LU ...---- ------___. (r) ______,--- ---------._ --- --,___ - . (3)JACK STUD LU nisi_ ----_. '.- Ce ml— _---- -- I _ +--1 I -- r----i_ 1 i -. ... i 0 LAI •, t , TEMP (E)SUBFLOOR 8,FRAMING 2 L , FULLY BLOCK DOWN TO I _ 1ST FLO0 1ii i CONC WALL < (1) 1, 1 k ::':; (-5)PROPOSED WEST ELEVATION ri)FRAMING ELEVATION AT DOOR 1 >. `.,---' 1/4"=1'-0" \--Y 1/2"=1.-0" PERMIT SET 5/4/22 2 No. Date < Nr In 6%1 CI . . 1 C) T... C\i ELEVATIONS, CV DETAILS C) C\I ....., Nr --.... in Al