Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2022-00614 TI(;A t D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/13/2022 Parcel: 1 S135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 200 Project: Resource Financial Planning Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Mechanical TI: Relocating(2)existing supply diffusers,ducts,and(3)existing thermostats. Adding(1)new supply duct and diffuser to existing terminal unit and(3)new return air grills with acoustical plenums. Contractor: AMERICAN HEATING INC Owner: LINCOLN CENTER LLC 5035 SE 24TH AVE BY SHORENSTEIN PROPERTIES LLC PORTLAND, OR 97202-4765 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-239-4600 PHONE: FAX: 503-239-7038 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 07/13/2022 $204.14 Class of Work: ALT Type of Const: Plan Review 07/13/2022 $51.04 Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 07/13/2022 $24.50 Stories: Info Process/Archiving-Lg$2.00(over 07/13/2022 $2.00 11x17) Project Valuation: $4,900.00 Fuel Air Handlers Fuel Types: Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $281.68 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-00 -0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit ApplicatC E IVE City Of Tigard Received DateB 13125 SW Hall Blvd.,Tigard,OR 97223 JUL 1 3 2022 y 3 - Pe al-,E y Plan Review pi / Phone: 503.718.2439 Fax: 503.598.1960 Date/By: rJti t t 75-7 I.IGARD Inspection Line: 503.639.4175 CITY OF TIGARnLI Date Ready/By: Juris: ee Page 2 or Internet: www.tigard-on BUILDING DIVISII/ Notified/Method: Supplemental Information I i"Y P E.OF WORK ! O;R , EE* LE US LJ ,L/Ve ''' Mechanical permit fees*are based on the value of the work ❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. 0 '• CC urnoN., . : :' Value 1I EQUIPMENT STIAL EQUIPMENT/ .; . - * 1,a.... -' ❑ 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building For special u:formauon use checklist. ❑Multi-f::, ily ❑Master builder ❑Other: Description Qty. Ea. Total ;<1 SITE T EORM?-i'IIAn AND i i f:VTION Heating/cooling: Air conditioning 46.75 Job site address: 10300 SW Greenburg Road Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: Tigard,OR 97223 Furnace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: 200 Project name: Resource Financial Suite 200(122202) Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK- Gas fireplace/insert 33.39 Flue vent for water heater or gas Relocate(2)existing supply diffusers and ducts and(3)existing thermostats,Add(1)new supply fireplace 23.32 duct and diffuser to existing terminal unit and(3)new return air grilles with acoustical plenums Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 x: Other: 23.32 0 PROPERTY OWNER ❑ TF'ANT ------ ---- ---------- — Environmental exhaust and ventilation: Name: Range hood/other kitchen ""— equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) I Fax:I ) Attic/crawlspace fans 23.32 AP PIAC.,,o-r CON'I h.r PERSON Other: 23.32 L_.._.__..... _ — Fuel Business name: American Heating piping: $14.15 for first four;$4.03 for each additional Contact name: Melina Swalko Furnace,etc. Address: 5035 SE 24th Ave Gas heat pump Wall/suspended/unit heater City/State/ZIP: Portland,OR 97202 Water heater Phone: 503-239-4600 Fax:: Fireplace Range E-mail: m.swalko@americanheating.net Barbecue I(tNTFLI,t:T(3(q Clothes dryer(gas) Business name: American Heating Other: 44F ClikNT€ALPERMITFEES" Address: 5035 SE 24th Ave Subtotal City/State/ZIP: Portland,OR 97202 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone: 503 239 4600 Fax: State surcharge(12%of permit fee) CCB lie.: 33135 ��2L/ TOTAL PERMIT FEE 111 This permit application expires if a permit is not obtained within 180 Melina Swalko ko "wad by Melina Swalko days after it has been accepted as complete. USE elko®amecanM1eeM1rg e,CN�e11nB Swelka Authorized signature: :2022 m.,a oe:2s:3.oroo * Fee methodology set by Tri-County Building Industry Service Board Print name: Melina Swalko Date: 07/13/22 1:\Building\Permits\MEC_PermitApp_040113.doc 440-4617T(11/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial&Multi-Famil Fee Schedule: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits\MEC_PermitApp_040113.doc 2 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT IGARD Building Permit Review — Commercial - No Land Use TBuilding Permit #: Site Address: 10300 5v ) €y-eip or $ Suite/Bldg#: Z00 Project Name: V-@,&2ufC , AI ( }1V (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review ��p J Proposal: 1/44 ko o ►3 �f `� "fV�1O0�c 1 \f\5\ Oi ) .S ��Wclt .� CF I VSenf 141, 3 c rw ' An r {kr Existing Business Activity: o Cto Proposed Business Activity: 0 frlNgi (;e Terify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes n No Zoning: r.ity&^ t Permitted Use: rQ Yes ❑ No ❑ Spec Space `Confirm no land use required. Business License: / Exists: Yes ❑ No,applicant was provided a business license application Notes: VZ ) W 0-At— Approved by Planning: Date: . 12'2— Revisionsons (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 7 /J /2_2_.. Site Plans: # 2 Building Plans: # Building Permit#: tenter building permit#above. Workflow Routing: nning © Permit Ce4s4Glitlatiar Workflow Sign-off: ,agri-off for Planning(include notes from planning review) Route Application Documents: ,2—B-uilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: 77/3/2--)7 I:\Building\Forms\B 1dgPenn itRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: • Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Ap•;cant: Revision Notice 2: Date Sent to pplicant: Revision Notice 3: Date Se, to Applicant: ❑ SDC Fees Entered: . h Co Trans Dev Tax: ❑ Yes N/A Tigard Trans SDC: ❑ Yes ❑ N Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Fonns\B1dgPermitRvw COM NoLandUse_111819.docx