Loading...
Permit lig CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2022-00169 TIC A l n 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/6/2022 Parcel: 2S113AB00600 Jurisdiction: Tigard Site address: 16160 SW UPPER BOONES FERRY RD Project: Spec Space Subdivision:COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: Landlord work prior to TI:Demolition of walls and lighting. Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES LP 15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN PORTLAND, OR 97224 15350 SE SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-624-6300 PHONE: FAX: 503-624-7755 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 07/06/2022 $1,287.15 Occupancy Grp: B Occupancy Load: 124 Demolition 12%State Surcharge-Building 07/06/2022 $154.46 Dwelling Units: 0 Plan Review 06/22/2022 $836.65 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 07/06/2022 $274.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 07/06/2022 $10.00 Value: $130,000 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,562.26 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires,you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 52-001-0090. Yo may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: /,Cry A_/j daj Permittee Signature: Ca•-• ••_. Call 5 3.639.4175 by 7:00 a.m.for the next available inspection date. 1 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. at 4, Building Permit Application Commercial FOR OFFICE: IiSF:ONLY - City of Tigard REijph211 PermitNo.: .1,1.,, IIy 13125SWHallBdTigard,OR 9722 � �� D ���" r/Y v`�� Phone: 503.718.2439 Fax: 503.598.1960 .y Date/By: '''as",2,2 Other Permit: T I GA R D Inspection Line: 503.639.4175 JUN U N 44; 2 2022 Date ReadyBy: ,, lads: ® See Page 2 for Internet: www.tigard-or.gov ified/Method: �. '7-2_,G, Supplemental Information TYPE OF WORD{` I REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 16160 SW Upper Boones Ferry Road New dwelling area: square feet City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: 16160-Spec ` )P- J u- Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: 1 Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demolition of 18,473 SF of existing office space in preparation for future Valuation: $130,000.00 tenant.Work includes demo of existing nonstructural walls and lighting. Existing building area: 18473 square feet New building area: 18473 square feet ®''PROPERTY OWNER ❑ TENANT Number of stories: I Name:Pacific Realty Associates,LP. Type of construction: III-B Address: 15350 SW Sequoia Parkway,Suite 300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B Phone:(503)624-6300 Fax:(503)624-7755 New: B F 0 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:Pacific Realty Associates,LP. Structural plan review fee(or deposit): Contact name:Robert Bumcrot Address: 15350 SW Sequoia Parkway,Suite 300 FLS plan review fee(if applicable): Total fees due upon application: City/State/ZIP:Portland,OR 97224 Amount received: Phone:(503)624-6300 Fax: :( ) E-mail:permits@pactrust.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:Pacific Realty Associates,LP. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 15350 SW Sequoia Parkway,Suite 300 Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)624-6300 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.: 153913 Total fee due upon application: $201.60 1 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Robert mcr Date: 6/1 3/2022 * Fee methodology set by Tri-County Building Industry Service Board. 1:ABuilding\Permits\B P-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Pe City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T1cAul7 Building Permit Review — Commercial - No Land Use a low" .,, “Asfrz. BIZ Building Permit #: ej,,l0„*_UUi69 Site Address: t 6 L(� 0 UW U f ✓ VL 5 Ir�°fi7 ?uite/Bldg#: Project Name: r5 C ( e (Name o► f commercial business occupying the space. If vacant,enter Spec Space.) Planning Review (p Proposal: fk(Mg OF t CJ/Li 7-3 1-e V rtvi Existing Business Activity: O_C-e Proposed Business Activity: ----- Le Verify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes n No p7 Zoning: Permitted Use: ❑ Yes ❑ No )b Spec Space ) Confirm no land use required. Business License: Exists: Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: 4eé?t4k 1 ia/alf,/ Date: qi Z/70Z Ti Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: El Approved El Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 6/204,79 Site Plans: # n/4_ Building Plans: # 3 Building Permit#: r building permit#above. Workflow Routing: [planning 7Ce>'mit Coordinator Q�Btt�t"d g Workflow Sign-off: 9ff for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: Q4/29.. 1:\Building\Fonns\BldgPermitRvw_COM_NoLandUse_l 11819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal onl, Revision Notice 1: Date t to Applicant: Revision Notice 2: D e Sent to Applicant: Revision Notice 3: •ate Sent to Applicant: ❑ SDC Fees Entere.• Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK t. ssue Permit Ap oved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx